PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/16/17 EST. NO. 002 TIME 02:00 PM R.E. NAME: MOHAMMAD SAMIMI 06-0T6004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/16/17 EST. NO. 002 TIME 02:00 PM R.E. NAME: MOHAMMAD SAMIMI 06-0T6004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/16/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0T6004 TIME 02:00 PM ESTIMATE NO. 002 BID OPENING 01/14/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/17 R.E. NAME: MOHAMMAD SAMIMI DATE OF THIS ESTIMATE 06/16/17 LOCATION PROGRESS ESTIMATE 06-KER-5-73.0/82.5 ----------------- 06-KER-43-9.2/16.1 GRIFFITH COMPANY IN KERN COUNTY ON ROUTE 5 FROM 1128 CARRIER PARKWAY AVE ROUTE 43 TO TWISSELMAN ROAD BAKERSFIELD CA 93308 OVERCROSSING AND ON ROUTE 43 FROM ROUTE 58 TO SANTA FE WAY FED. AID NO. STP-X029(123)E COLD PLANE/OVERLAY/RHMA GAP GRADED ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500 002 CONSTRUCTION AREA SIGNS LS 9,800.0000 9,800.00 0.100 980.00 0.800 7,840 003 TRAFFIC CONTROL SYSTEM LS 354,283.0000 354,283.00 0.150 53,142.45 0.300 106,284 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 18,300.0000 18,300.00 0.150 2,745.00 0.300 5,490 005 JOB SITE MANAGEMENT LS 10,285.0000 10,285.00 0.150 1,542.75 0.300 3,085 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 3,700.0000 3,700.00 1.000 3,700 007 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 2,490.00 0.000 0 008 REMOVE PAVEMENT MARKER EA 1.1000 6,336.00 0.000 0 009 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 68.2000 49,786.00 348.800 23,788.16 1,250.000 85,250 010 ADJUST MONUMENT COVER EA 700.0000 6,300.00 0.000 0 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 8.0000 26,080.00 651.000 5,208.00 2,392.330 19,138 012 SHOULDER BACKING TON 60.0000 92,400.00 0.000 0 013 PREPAVING INERTIAL PROFILER LS 8,400.0000 8,400.00 0.000 0 014 PREPAVING GRINDING DAY EA 6,400.0000 12,800.00 0.000 0 015 HOT MIX ASPHALT (TYPE A) TON 178.0000 140,620.00 416.410 74,120.98 1,406.440 250,346 016 ASPHALTIC EMULSION TON 426.0000 281,160.00 0.000 0 (BONDED WEARING COURSE) 017 SHOULDER RUMBLE STRIP STA 21.8000 43,818.00 0.000 0 (HMA,GROUND-IN INDENTATIONS) 018 DATA CORE LS 9,745.0000 9,745.00 0.000 0 019 RUBBERIZED HOT MIX ASPHALT-GAP GRADED TON 101.0000 3,666,300.00 0.000 0 (BONDED WEARING COURSE) 020 TACK COAT TON 400.0000 800.00 0.000 0 021 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3600 104,040.00 0.000 0 022 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 2,054.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/16/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0T6004 TIME 02:00 PM ESTIMATE NO. 002 BID OPENING 01/14/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/17 R.E. NAME: MOHAMMAD SAMIMI DATE OF THIS ESTIMATE 06/16/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 THERMOPLASTIC PAVEMENT MARKING SQFT 4.0000 3,320.00 0.000 0 024 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 125.00 0.000 0 (BROKEN 12-3) 025 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 26,400.00 0.000 0 (BROKEN 36-12) 026 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 104.00 0.000 0 (BROKEN 17-7) 027 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 11,520.00 0.000 0 028 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 10.0000 10.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/16/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0T6004 TIME 02:00 PM ESTIMATE NO. 002 BID OPENING 01/14/16 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/17 R.E. NAME: MOHAMMAD SAMIMI DATE OF THIS ESTIMATE 06/16/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 161,527.34 482,635.36 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 161,527.34 482,635.36 ORIGINAL CONTRACT AMOUNT 4,892,476.00 TOTAL WORK COMPLETED 161,527.34 482,635.36 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 161,527.34 482,635.36 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/21/16 50 08/15/16 08/15/16 08/10/17 16 196 0 0 9% 32% PROGRESS IS SATISFACTORY MOHAMMAD SAMIMI RESIDENT ENGINEER PROGRAM CAS145 DATE 06/16/17