PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/19/19 EST. NO. 001 TIME 09:14 AM R.E. NAME: DADAWALLA, DIN 06-0U0804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/19/19 EST. NO. 001 TIME 09:14 AM R.E. NAME: DADAWALLA, DIN 06-0U0804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U0804 TIME 09:14 AM ESTIMATE NO. 001 BID OPENING 09/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/19 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 04/19/19 LOCATION PROGRESS ESTIMATE 06-FRE-5-21.0/31.0 ----------------- GRANITE CONSTRUCTION COMPANY IN FRESNO COUNTY ON I-5 FROM 2716 S. GRANITE COURT TUOLUMNE AVE OC TO 1.0 MI. NORTH OF FRESNO CA 93706 RTE 33/5 SEPARATION FED. AID NO. B1IM-005 -5(151)E PAVEMENT PRESERVATION (CAPM) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 750.0000 750.00 0.000 0 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.000 0 003 TIME-RELATED OVERHEAD (LS) LS 200,000.0000 200,000.00 0.000 0 004 CONSTRUCTION AREA SIGNS LS 20,700.0000 20,700.00 0.150 3,105.00 0.150 3,105 005 TRAFFIC CONTROL SYSTEM LS 1,855,000.2500 1,855,000.25 0.000 0 006 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 1,540.00 0.000 0 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 20,000.0000 20,000.00 0.000 0 008 TEMPORARY RAILING (TYPE K) LF 25.0000 83,000.00 0.000 0 009 TEMPORARY CRASH CUSHION MODULE EA 135.0000 16,200.00 0.000 0 010 JOB SITE MANAGEMENT LS 10,000.0000 10,000.00 0.000 0 011 PREPARE WATER POLLUTION CONTROL PROGRAM LS 490.0000 490.00 0.000 0 012 MOVE-IN/MOVE-OUT EA 450.0000 1,800.00 0.000 0 (TEMPORARY EROSION CONTROL) 013 TEMPORARY HYDRAULIC MULCH SQYD 0.8300 12,450.00 0.000 0 (BONDED FIBER MATRIX) 014 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 16,750.00 0.000 0 015 TEMPORARY FIBER ROLL LF 14.0000 2,100.00 0.000 0 016 TEMPORARY CONSTRUCTION ENTRANCE EA 6,000.0000 6,000.00 0.000 0 017 TEMPORARY CONCRETE WASHOUT LS 3,000.0000 3,000.00 0.000 0 018 TREATED WOOD WASTE LB 0.1000 2,180.00 0.000 0 019 ROADWAY EXCAVATION CY 25.0000 37,750.00 0.000 0 020 SHOULDER BACKING TON 100.0000 220,000.00 0.000 0 021 HYDROMULCH SQFT 0.0500 4,620.00 0.000 0 022 HYDROSEED SQFT 0.1100 10,164.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 04/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U0804 TIME 09:14 AM ESTIMATE NO. 001 BID OPENING 09/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/19 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 04/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 COMPOST (CY) CY 58.0000 31,900.00 0.000 0 024 CLASS 2 AGGREGATE BASE (CY) CY 400.0000 6,800.00 0.000 0 025 PREPAVING INERTIAL PROFILER LS 1,000.0000 1,000.00 0.000 0 026 REPLACE ASPHALT CONCRETE SURFACING CY 500.0000 1,000.00 0.000 0 027 HOT MIX ASPHALT (PANEL REPLACEMENT) TON 250.0000 260,000.00 0.000 0 028 HOT MIX ASPHALT (TYPE A) TON 73.0000 3,657,300.00 0.000 0 029 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 76.0000 2,318,000.00 0.000 0 030 DATA CORE LS 5,000.0000 5,000.00 0.000 0 031 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 1.0500 6,667.50 0.000 0 032 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 1.0500 672.00 0.000 0 033 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 1.0500 18,900.00 0.000 0 034 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 1.0500 52.50 0.000 0 035 PLACE HOT MIX ASPHALT SQYD 125.0000 41,250.00 0.000 0 (MISCELLANEOUS AREA) 036 TACK COAT TON 540.0000 167,400.00 0.000 0 037 REMOVE ASPHALT CONCRETE PAVEMENT (CY) CY 460.0000 8,740.00 0.000 0 038 REMOVE ASPHALT CONCRETE DIKE LF 0.5000 12,500.00 0.000 0 039 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.0000 940,000.00 0.000 0 040 DRILL AND BOND (DOWEL BAR) EA 49.0000 1,568.00 0.000 0 041 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 2,400.0000 45,600.00 0.000 0 042 REMOVE CONCRETE PAVEMENT (SQYD) SQYD 85.0000 146,200.00 0.000 0 043 8" ENTRANCE TAPER EA 700.0000 5,600.00 0.000 0 044 12" ENTRANCE TAPER EA 900.0000 2,700.00 0.000 0 045 REMOVE ENTRANCE TAPER EA 400.0000 4,400.00 0.000 0 046 REMOVE OVERSIDE DRAIN EA 350.0000 9,450.00 0.000 0 047 REMOVE CONCRETE (CURB AND GUTTER) LF 18.0000 4,680.00 0.000 0 048 ADJUST MONUMENT COVER TO GRADE EA 1,500.0000 36,000.00 0.000 0 049 REMOVE AND REPLACE MONUMENT EA 1,500.0000 4,500.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 04/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U0804 TIME 09:14 AM ESTIMATE NO. 001 BID OPENING 09/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/19 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 04/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 DELINEATOR (CLASS 1) EA 45.0000 6,750.00 0.000 0 051 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 18,440.00 0.000 0 052 OBJECT MARKER (TYPE L) EA 75.0000 675.00 0.000 0 053 REMOVE MARKER EA 25.0000 125.00 0.000 0 054 REMOVE ROADSIDE SIGN EA 60.0000 120.00 0.000 0 055 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.2500 1,068.75 0.000 0 (0.080"-FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI) 056 RETROREFLECTIVE SHEETING (TYPE XI) SQFT 4.0000 300.00 0.000 0 057 ROADSIDE SIGN - TWO POST EA 500.0000 1,000.00 0.000 0 058 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 34.0000 37,060.00 0.000 0 059 VEGETATION CONTROL (MINOR CONCRETE) SQYD 70.0000 212,100.00 0.000 0 060 DOUBLE MIDWEST GUARDRAIL SYSTEM LF 48.0000 44,160.00 0.000 0 (STEEL POST) 061 TRANSITION RAILING (TYPE WB-31) EA 4,000.0000 40,000.00 0.000 0 062 RAIL TENSIONING ASSEMBLY EA 250.0000 1,500.00 0.000 0 063 END ANCHOR ASSEMBLY (TYPE SFT) EA 825.0000 4,125.00 0.000 0 064 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 3,200.0000 28,800.00 0.000 0 065 ALTERNATIVE CRASH CUSHION SYSTEM EA 5,400.0000 32,400.00 0.000 0 066 CONCRETE BARRIER TRANSITION LF 1,430.0000 40,040.00 0.000 0 (F) 067 REMOVE GUARDRAIL LF 16.0000 19,520.00 0.000 0 068 THERMOPLASTIC PAVEMENT MARKING SQFT 6.0000 4,140.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 069 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 420.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 070 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.7000 73,500.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 071 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8500 183,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 072 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 2,550.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 073 12" RUMBLE STRIP STA 12.5000 25,625.00 0.000 0 (ASPHALT CONCRETE PAVEMENT) 074 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 4 DATE 04/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U0804 TIME 09:14 AM ESTIMATE NO. 001 BID OPENING 09/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/19 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 04/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 075 MODIFYING EXISTING ELECTRICAL SYSTEM LS 29,860.0000 29,860.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 04/19/19 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U0804 TIME 09:14 AM ESTIMATE NO. 001 BID OPENING 09/06/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/19 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 04/19/19 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 3,105.00 3,105.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 3,105.00 3,105.00 076 MOBILIZATION LS 1,220,000.0000 1,220,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 12,295,753.00 TOTAL WORK COMPLETED 3,105.00 3,105.00 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 3,105.00 3,105.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/22/18 75 12/17/18 04/23/19 07/30/19 0 84 0 0 0% 0% PROGRESS IS SATISFACTORY DADAWALLA, DIN RESIDENT ENGINEER PROGRAM CAS145 DATE 04/19/19