PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/23/17 EST. NO. 001 TIME 10:27 AM R.E. NAME: CARY CRUZ 06-0U1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/23/17 EST. NO. 001 TIME 10:27 AM R.E. NAME: CARY CRUZ 06-0U1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U1504 TIME 10:27 AM ESTIMATE NO. 001 BID OPENING 03/29/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: CARY CRUZ DATE OF THIS ESTIMATE 08/23/17 LOCATION PROGRESS ESTIMATE 06-FRE-0-0.0/ .0 ----------------- PETERSON-CHASE GENERAL IN FRESNO, MADERA, KINGS, AND ENGINEERING CONSTRUCTION, INC. TULARE COUNTIES AT VARIOUS 16351 CONSTRUCTION CIRCLE WES LOCATIONS IRVINE CA 92606 FED. AID NO. N O N E TREAT BRIDGE DECKS/JOINT SEALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,730.0000 1,730.00 1.000 1,730.00 1.000 1,730 002 CONSTRUCTION AREA SIGNS LS 5,300.0000 5,300.00 0.200 1,060.00 0.200 1,060 003 TRAFFIC CONTROL SYSTEM LS 76,000.0000 76,000.00 0.200 15,200.00 0.200 15,200 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,500.0000 3,500.00 0.200 700.00 0.200 700 005 JOB SITE MANAGEMENT LS 1,120.0000 1,120.00 0.200 224.00 0.200 224 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 690.0000 690.00 0.750 517.50 0.750 517 007 TEMPORARY CONCRETE WASHOUT LS 780.0000 780.00 0.000 0 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 5.2000 4,576.00 0.000 0 STRIPE (HAZARDOUS WASTE) 009 GRIND EXISTING BRIDGE DECK SQYD 32.0000 21,760.00 0.000 0 010 TEMPORARY DECKING LS 26,000.0000 26,000.00 0.000 0 011 STRUCTURAL CONCRETE, BRIDGE CY 4,400.0000 26,400.00 0.000 0 (F) 012 CLEAN EXPANSION JOINT LF 22.4000 12,633.60 187.000 4,188.80 187.000 4,188 013 JOINT SEAL (MR 1/2") LF 28.0000 6,216.00 34.000 952.00 34.000 952 014 JOINT SEAL (MR 1") LF 42.0000 11,004.00 153.000 6,426.00 153.000 6,426 015 JOINT SEAL ASSEMBLY (MR 2 1/2") LF 198.0000 7,920.00 0.000 0 016 JOINT SEAL ASSEMBLY (MR 3") LF 198.0000 7,920.00 0.000 0 017 BAR REINFORCING STEEL (BRIDGE) LB 2.1600 432.00 0.000 0 (F) 018 RAPID SETTING CONCRETE (PATCH) CF 129.0000 17,673.00 0.000 0 019 REMOVE ASPHALT CONCRETE SURFACING SQFT 3.4000 8,170.20 0.000 0 020 REMOVE UNSOUND CONCRETE CF 132.0000 18,084.00 0.000 0 021 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1500 4,776.60 0.000 0 022 FURNISH POLYESTER CONCRETE OVERLAY CF 102.0000 178,908.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U1504 TIME 10:27 AM ESTIMATE NO. 001 BID OPENING 03/29/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: CARY CRUZ DATE OF THIS ESTIMATE 08/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.4000 78,210.00 0.000 0 (F) 024 TREAT BRIDGE DECK SQFT 0.4700 6,612.43 0.000 0 (F) 025 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 56.0000 8,736.00 0.000 0 026 BRIDGE REMOVAL (PORTION), LOCATION A LS 12,200.0000 12,200.00 0.000 0 027 BRIDGE REMOVAL (PORTION), LOCATION B LS 29,600.0000 29,600.00 0.000 0 028 REMOVE PAVEMENT MARKER EA 70.0000 3,640.00 0.000 0 029 PAVEMENT MARKER (RETROREFLECTIVE) EA 81.0000 4,212.00 0.000 0 030 4" THERMOPLASTIC TRAFFIC STRIPE LF 5.4000 6,696.00 0.000 0 031 4" THERMOPLASTIC TRAFFIC STRIPE LF 5.7000 5,016.00 0.000 0 (BROKEN 36-12) 032 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 4.9000 4,753.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/23/17 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U1504 TIME 10:27 AM ESTIMATE NO. 001 BID OPENING 03/29/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/17 R.E. NAME: CARY CRUZ DATE OF THIS ESTIMATE 08/23/17 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 30,998.30 30,998.30 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 30,998.30 30,998.30 033 MOBILIZATION LS 43,000.0000 43,000.00 0.500 21,500.00 0.500 21,500 ORIGINAL CONTRACT AMOUNT 644,268.83 TOTAL WORK COMPLETED 52,498.30 52,498.30 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 52,498.30 52,498.30 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/18/17 90 08/14/17 08/14/17 12/22/17 5 0 0 0 8% 6% PROGRESS IS SATISFACTORY CARY CRUZ RESIDENT ENGINEER PROGRAM CAS145 DATE 08/23/17