PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/19/18 EST. NO. 006 TIME 09:44 AM R.E. NAME: CARY CRUZ 06-0U1504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 881.31 E.W. @ F.A.(+) 081617 N 0001.0 0002 827.80 081717 N 0002.0 0003 730.27 100217 N 0003.0 0004 2,234.28 100317 N 0004.0 4,673.66 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 4,673.66 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/19/18 EST. NO. 006 TIME 09:44 AM R.E. NAME: CARY CRUZ 06-0U1504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MAINTAIN DELINEATION -10,000.00 004 MISSING CEM-4401 -10,000.00 006 -10,000.00 -20,000.00 TOTAL DEDUCTIONS -10,000.00 -20,000.00 PROGRAM CAS145 PAGE 1 DATE 03/19/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U1504 TIME 09:44 AM ESTIMATE NO. 006 BID OPENING 03/29/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/06/18 R.E. NAME: CARY CRUZ DATE OF THIS ESTIMATE 03/19/18 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 06-FRE-0-0.0/ .0 ---------------------------------- PETERSON-CHASE GENERAL IN FRESNO, MADERA, KINGS, AND ENGINEERING CONSTRUCTION, INC. TULARE COUNTIES AT VARIOUS 16351 CONSTRUCTION CIRCLE WES LOCATIONS IRVINE CA 92606 FED. AID NO. N O N E TREAT BRIDGE DECKS/JOINT SEALS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,730.0000 1,730.00 1.000 1,730 002 CONSTRUCTION AREA SIGNS LS 5,300.0000 5,300.00 0.900 4,770 003 TRAFFIC CONTROL SYSTEM LS 76,000.0000 76,000.00 0.900 68,400 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,500.0000 3,500.00 0.900 3,150 005 JOB SITE MANAGEMENT LS 1,120.0000 1,120.00 0.900 1,008 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 690.0000 690.00 0.750 517 007 TEMPORARY CONCRETE WASHOUT LS 780.0000 780.00 0.500 390 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 5.2000 4,576.00 880.000 4,576 STRIPE (HAZARDOUS WASTE) 009 GRIND EXISTING BRIDGE DECK SQYD 32.0000 21,760.00 680.000 21,760 010 TEMPORARY DECKING LS 26,000.0000 26,000.00 1.000 26,000 011 STRUCTURAL CONCRETE, BRIDGE CY 4,400.0000 26,400.00 6.000 26,400 (F) 012 CLEAN EXPANSION JOINT LF 22.4000 12,633.60 564.000 12,633 013 JOINT SEAL (MR 1/2") LF 28.0000 6,216.00 222.000 6,216 014 JOINT SEAL (MR 1") LF 42.0000 11,004.00 262.000 11,004 015 JOINT SEAL ASSEMBLY (MR 2 1/2") LF 198.0000 7,920.00 40.000 7,920 016 JOINT SEAL ASSEMBLY (MR 3") LF 198.0000 7,920.00 40.000 7,920 017 BAR REINFORCING STEEL (BRIDGE) LB 2.1600 432.00 200.000 432 (F) 018 RAPID SETTING CONCRETE (PATCH) CF 129.0000 17,673.00 2.000 258 019 REMOVE ASPHALT CONCRETE SURFACING SQFT 3.4000 8,170.20 0.000 0 020 REMOVE UNSOUND CONCRETE CF 132.0000 18,084.00 2.000 264 021 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1500 4,776.60 31,844.000 4,776 022 FURNISH POLYESTER CONCRETE OVERLAY CF 102.0000 178,908.00 2,118.000 216,036 PROGRAM CAS145 PAGE 2 DATE 03/19/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U1504 TIME 09:44 AM ESTIMATE NO. 006 BID OPENING 03/29/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/06/18 R.E. NAME: CARY CRUZ DATE OF THIS ESTIMATE 03/19/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PLACE POLYESTER CONCRETE OVERLAY SQFT 4.4000 78,210.00 17,775.000 78,210 (F) 024 TREAT BRIDGE DECK SQFT 0.4700 6,612.43 14,069.000 6,612 (F) 025 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 56.0000 8,736.00 168.000 9,408 026 BRIDGE REMOVAL (PORTION), LOCATION A LS 12,200.0000 12,200.00 1.000 12,200 027 BRIDGE REMOVAL (PORTION), LOCATION B LS 29,600.0000 29,600.00 1.000 29,600 028 REMOVE PAVEMENT MARKER EA 70.0000 3,640.00 52.000 3,640 029 PAVEMENT MARKER (RETROREFLECTIVE) EA 81.0000 4,212.00 18.000 1,458.00 70.000 5,670 030 4" THERMOPLASTIC TRAFFIC STRIPE LF 5.4000 6,696.00 3,036.000 16,394 031 4" THERMOPLASTIC TRAFFIC STRIPE LF 5.7000 5,016.00 602.000 3,431 (BROKEN 36-12) 032 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 4.9000 4,753.00 970.000 4,753 PROGRAM CAS145 PAGE 3 DATE 03/19/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U1504 TIME 09:44 AM ESTIMATE NO. 006 BID OPENING 03/29/17 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/06/18 R.E. NAME: CARY CRUZ DATE OF THIS ESTIMATE 03/19/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,458.00 596,080.93 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 4,673.66 4,673.66 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 6,131.66 600,754.59 033 MOBILIZATION LS 43,000.0000 43,000.00 1.000 43,000 ORIGINAL CONTRACT AMOUNT 644,268.83 TOTAL WORK COMPLETED 6,131.66 643,754.59 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -10,000.00 -20,000.00 TOTAL -3,868.34 623,754.59 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/18/17 90 08/14/17 08/14/17 02/06/18 79 6 0 0 100% 100% CARY CRUZ RESIDENT ENGINEER PROGRAM CAS145 DATE 03/19/18