PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/12/18 EST. NO. 005 TIME 02:21 PM R.E. NAME: DADAWALLA, DIN 06-0U9804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0001 -77,448.00 A.C. @ U.P.(-) 091118 N 958670 0002 172,666.00 A.C. @ U.P.(+) 091118 N 497777 95,218.00 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 95,218.00 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/12/18 EST. NO. 005 TIME 02:21 PM R.E. NAME: DADAWALLA, DIN 06-0U9804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISSING CEM-4401 -10,000.00 004 REC'D CEM-4401 10,000.00 005 10,000.00 0.00 LABOR COMPLIANCE VIOLATION MISSING PAYROLL -5,000.00 003 MISSING PAYROLL -10,000.00 004 0.00 -15,000.00 TOTAL DEDUCTIONS 10,000.00 -15,000.00 PROGRAM CAS145 PAGE 1 DATE 09/12/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U9804 TIME 02:21 PM ESTIMATE NO. 005 BID OPENING 02/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/10/18 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 09/12/18 LOCATION SEMI-FINAL ESTIMATE 06-FRE-5-15.8/62.3 ------------------- PETERSON-CHASE GENERAL ON FRE 5, AT 16 BRIDGES, FROM 1 ENGINEERING CONSTRUCTION, INC. MILE N OF THE RTE 5/198 JCT TO 3.9 16351 CONSTRUCTION CIRCLE WES MILES S OF THE FRE/MER CO LINE IRVINE CA 92606 FED. AID NO. N O N E OVERLAYS, JOINT SEALS, APPROACH ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,200.0000 2,200.00 1.000 2,200 002 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 1.000 15,000 003 TRAFFIC CONTROL SYSTEM LS 200,000.0000 200,000.00 0.808 161,600 004 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,500.0000 6,500.00 0.808 5,252 005 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.808 2,020 006 PREPARE WATER POLLUTION CONTROL PROGRAM LS 770.0000 770.00 1.000 770 007 TEMPORARY CONCRETE WASHOUT LS 2,200.0000 2,200.00 0.808 1,777 008 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.1000 4,004.00 3,454.000 3,799 STRIPE (HAZARDOUS WASTE) 009 HOT MIX ASPHALT (TYPE A) TON 350.0000 87,500.00 344.700 120,645 010 TACK COAT TON 2,000.0000 2,000.00 1.000 2,000 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 11.0000 24,640.00 1,905.300 20,958 012 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,280.0000 983,040.00 768.000 983,040 (TYPE R MODIFIED) 013 PAVING NOTCH EXTENSION CF 125.0000 40,500.00 324.000 40,500 014 CLEAN EXPANSION JOINT LF 25.0000 35,075.00 1,505.000 37,625 015 JOINT SEAL (MR 1/2") LF 28.0000 14,588.00 623.000 17,444 016 BONDED JOINT SEAL (MR 1") LF 37.0000 10,138.00 274.000 10,138 017 BONDED JOINT SEAL (MR 1 1/2") LF 40.0000 3,760.00 94.000 3,760 018 JOINT SEAL (MR 1") LF 28.0000 24,864.00 888.000 24,864 019 JOINT SEAL (MR 2") LF 60.0000 4,080.00 68.000 4,080 020 RAPID SETTING CONCRETE (PATCH) CF 70.0000 15,050.00 0.000 0 021 REMOVE ASPHALT CONCRETE SURFACING SQFT 3.3000 27,766.20 8,414.000 27,766 022 REMOVE UNSOUND CONCRETE CF 50.0000 10,750.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 09/12/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U9804 TIME 02:21 PM ESTIMATE NO. 005 BID OPENING 02/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/10/18 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 09/12/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2000 18,857.00 94,285.000 18,857 024 FURNISH POLYESTER CONCRETE OVERLAY CF 95.0000 654,360.00 -1,722.000 -163,590.00 14,898.000 1,415,310 025 PLACE POLYESTER CONCRETE OVERLAY SQFT 3.0000 258,999.00 86,333.000 258,999 (F) 026 TREAT BRIDGE DECK SQFT 0.5000 3,976.00 7,952.000 3,976 (F) 027 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 61.0000 5,368.00 88.000 5,368 028 REMOVE PAVEMENT MARKER EA 2.2000 352.00 92.000 202 029 PAVEMENT MARKER (RETROREFLECTIVE) EA 11.0000 1,760.00 145.000 1,595 030 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 6.5000 43,550.00 6,955.000 45,207 031 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 3,830.00 3,379.000 3,379 032 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 11.0000 33,770.00 3,210.000 35,310 (BROKEN 36-12) (WARRANTY) PROGRAM CAS145 PAGE 3 DATE 09/12/18 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0U9804 TIME 02:21 PM ESTIMATE NO. 005 BID OPENING 02/13/18 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/10/18 R.E. NAME: DADAWALLA, DIN DATE OF THIS ESTIMATE 09/12/18 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION -163,590.00 3,273,443.40 ADJUSTMENT OF COMPENSATION 95,218.00 95,218.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION -68,372.00 3,368,661.40 033 MOBILIZATION LS 200,000.0000 200,000.00 1.000 200,000 ORIGINAL CONTRACT AMOUNT 2,741,747.20 TOTAL WORK COMPLETED -68,372.00 3,568,661.40 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 10,000.00 -15,000.00 TOTAL -58,372.00 3,553,661.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/27/18 60 00/00/00 00/00/00 08/10/18 66 5 6 0 100% 100% DADAWALLA, DIN RESIDENT ENGINEER PROGRAM CAS145 DATE 09/12/18