PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/27/23 EST. NO. 004 TIME 10:53 AM R.E. NAME: AMARJIT DHALIWAL 06-0V2804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 7,743.98 E.W. @ F.A.(+) 092922 N 432900 0003 4,761.26 101322 N ATC 10 0007 3,167.67 112122 N 703840 0008 910.47 010523 N 304650 0009 1,091.46 011623 N 304720 002 0001 7,569.39 E.W. @ F.A.(+) 102422 N 452380 0002 3,292.93 102522 N 452400 0005 11,449.92 101122 N 452370 003 0001 704.59 E.W. @ F.A.(+) 102422 N 452390 0002 4,101.12 101422 N 295030 44,792.79 TOTAL THIS ESTIMATE 13,729.23 TOTAL PREVIOUS ESTIMATE 58,522.02 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/27/23 EST. NO. 004 TIME 10:53 AM R.E. NAME: AMARJIT DHALIWAL 06-0V2804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/27/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0V2804 TIME 10:53 AM ESTIMATE NO. 004 BID OPENING 02/08/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/23 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/27/23 LOCATION RERUN PROGRESS ESTIMATE 06-KER-184-L0.9/L1.1 ----------------------- GRIFFITH COMPANY NEAR WEEDPATCH FROM 0.1 MI SOUTH TO 1128 CARRIER PARKWAY AVE; 0.1 MI NORTH OF SUNSET BLVD. BAKERSFIELD CA 93308 FED. AID NO. SSTG-P184(16)E INTERSECTION IMPROVEMENTS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,700.0000 2,700.00 1.000 2,700 002 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 1,500.0000 1,500.00 0.250 375 003 TIME-RELATED OVERHEAD (WDAY) WDAY 1,750.0000 87,500.00 16.000 28,000.00 38.000 66,500 004 CONSTRUCTION AREA SIGNS LS 25,900.0000 25,900.00 0.100 2,590.00 0.730 18,907 005 TRAFFIC CONTROL SYSTEM LS 45,000.0000 45,000.00 0.320 14,400.00 0.760 34,200 006 TYPE III BARRICADE EA 150.0000 3,600.00 18.000 2,700 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 12,800.0000 12,800.00 0.320 4,096.00 0.760 9,728 008 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.320 1,600.00 0.760 3,800 009 PREPARE STORM WATER POLLUTION PREVENTION LS 2,200.0000 2,200.00 0.750 1,650 PLAN 010 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 0.000 0 011 TEMPORARY CONSTRUCTION ENTRANCE EA 2,800.0000 5,600.00 0.000 0 012 STREET SWEEPING LS 10,500.0000 10,500.00 0.320 3,360.00 0.760 7,980 013 TEMPORARY CONCRETE WASHOUT LS 10,000.0000 10,000.00 0.000 0 014 TREATED WOOD WASTE LB 2.0000 700.00 0.000 0 015 CLEARING AND GRUBBING (LS) LS 33,805.5000 33,805.50 0.320 10,817.76 0.760 25,692 016 ROADWAY EXCAVATION CY 29.0000 234,030.00 3,006.000 87,174.00 6,133.000 177,857 017 STRUCTURE BACKFILL (SLURRY CEMENT) CY 375.0000 10,500.00 0.000 0 018 ROCK MULCH SQFT 17.0000 10,880.00 0.000 0 019 ROCK BLANKET SQFT 14.0000 271,600.00 0.000 0 020 8" CORRUGATED HIGH DENSITY LF 77.0000 6,930.00 0.000 0 POLYETHYLENE PIPE CONDUIT 021 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 350.0000 350.00 0.000 0 022 HYDROMULCH SQFT 0.0600 6,360.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 02/27/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0V2804 TIME 10:53 AM ESTIMATE NO. 004 BID OPENING 02/08/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/23 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/27/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 HYDROSEED SQFT 0.0700 7,420.00 0.000 0 024 CLASS 2 AGGREGATE BASE (CY) CY 34.0000 127,160.00 0.000 0 025 HOT MIX ASPHALT (TYPE A) TON 93.0000 510,570.00 0.000 0 026 TACK COAT TON 500.0000 3,500.00 0.000 0 027 STRUCTURAL CONCRETE, DRAINAGE INLET CY 4,325.0000 12,110.00 2.780 12,023.50 2.780 12,023 028 DRILL AND GROUT DOWEL (EA) EA 48.2500 1,351.00 0.000 0 029 18" REINFORCED CONCRETE PIPE LF 169.0000 23,660.00 133.000 22,477.00 133.000 22,477 030 18" STEEL FLARED END SECTION EA 1,195.0000 2,390.00 2.000 2,390.00 2.000 2,390 031 48" PRECAST CONCRETE PIPE MANHOLE LF 1,365.0000 19,110.00 14.000 19,110 032 ROCK SLOPE PROTECTION CY 1,900.0000 4,180.00 0.000 0 (60 LB, CLASS II, METHOD B) (CY) 033 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 12.0000 1,440.00 0.000 0 034 DETECTABLE WARNING SURFACE SQFT 22.1500 10,853.50 0.000 0 035 MINOR CONCRETE (MISCELLANEOUS CY 353.5000 282,800.00 0.000 0 CONSTRUCTION) 036 MINOR CONCRETE (EXPOSED AGGREGATE SQFT 10.0000 37,900.00 0.000 0 CONCRETE) 037 MINOR CONCRETE (TEXTURED PAVING) CY 396.5000 67,405.00 0.000 0 038 MISCELLANEOUS IRON AND STEEL LB 7.0000 29,631.00 0.000 0 (F) 039 MANHOLE FRAME AND COVER EA 1,500.0000 1,500.00 0.000 0 040 8" SDR-35 PVC PIPE LF 240.0000 17,520.00 73.000 17,520 041 12" SDR-35 PVC PIPE LF 260.0000 10,140.00 0.000 0 042 REMOVE SEWER MANHOLE EA 3,500.0000 7,000.00 2.000 7,000 043 REMOVE SEWER PIPE LF 62.0000 8,060.00 61.000 3,782 044 ADJUST MANHOLE TO GRADE EA 2,885.0000 11,540.00 0.000 0 045 8" TRANSITION COUPLING, FERNCO FLEXIBLE EA 150.0000 600.00 4.000 600 046 GOULDS WATER TECHNOLOGY SEWER EA 1,100.0000 2,200.00 2.000 2,200 EJECTOR PUMP 047 8" HIGH-DENSITY POLYETHLANE (HDPE) PIPE LF 19.0000 18,430.00 946.000 17,974 048 TEMPORARY PORTABLE GENERATOR EA 1,800.0000 1,800.00 1.000 1,800 049 ADJUST MONUMENT COVER TO GRADE EA 2,285.0000 2,285.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 02/27/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0V2804 TIME 10:53 AM ESTIMATE NO. 004 BID OPENING 02/08/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/23 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/27/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 FENCE (TYPE BW, 5-STRAND, METAL POST) LF 8.0000 8,800.00 0.000 0 051 CHAIN LINK FENCE (TYPE CL-6) LF 49.0000 53,900.00 0.000 0 052 16' CHAIN LINK GATE (TYPE CL-6) EA 3,100.0000 3,100.00 0.000 0 053 REMOVE FENCE LF 10.0000 11,200.00 1,116.000 11,160 054 REMOVE GATE EA 500.0000 500.00 1.000 500 055 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 1,300.00 0.000 0 056 OBJECT MARKER EA 135.0000 1,080.00 0.000 0 057 REMOVE ROADSIDE SIGN (WOOD POST) EA 250.0000 1,000.00 0.000 0 058 REMOVE ROADSIDE SIGN (METAL POST) EA 305.0000 1,220.00 4.000 1,220 059 RELOCATE ROADSIDE SIGN (METAL POST) EA 400.0000 800.00 0.000 0 060 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 14.0000 3,920.00 0.000 0 (0.063"-UNFRAMED) 061 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 15.0000 1,440.00 0.000 0 (0.080"-UNFRAMED) 062 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 22.0000 5,280.00 0.000 0 (0.080"-FRAMED) 063 ROADSIDE SIGN - TWO POST EA 750.0000 4,500.00 0.000 0 064 ROADSIDE SIGN (METAL POST) EA 435.0000 13,485.00 0.000 0 065 THERMOPLASTIC PAVEMENT MARKING SQFT 8.0000 12,800.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 066 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 250.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 067 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.3000 14,690.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 068 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 300.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 069 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 159.00 0.000 0 070 LIGHTING SYSTEM LS 398,000.0000 398,000.00 0.000 0 071 TRAFFIC MONITORING STATION SYSTEM LS 48,000.0000 48,000.00 0.000 0 072 TEMPORARY LIGHTING SYSTEMS LS 256,000.0000 256,000.00 0.000 0 073 REMOVING FLASHING BEACON SYSTEMS LS 16,000.0000 16,000.00 0.680 10,880.00 0.680 10,880 PROGRAM CAS145 PAGE 4 DATE 02/27/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-0V2804 TIME 10:53 AM ESTIMATE NO. 004 BID OPENING 02/08/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/23 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 02/27/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 199,808.26 482,725.68 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 44,792.79 58,522.02 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 244,601.05 541,247.70 074 MOBILIZATION LS 285,000.0000 285,000.00 0.750 213,750 ORIGINAL CONTRACT AMOUNT 3,156,735.00 TOTAL WORK COMPLETED 244,601.05 754,997.70 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 244,601.05 754,997.70 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/16/22 50 09/12/22 09/12/22 03/08/23 38 69 0 0 23% 76% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU W H Y ... W H Y ... W H AMARJIT DHALIWAL RESIDENT ENGINEER