PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/20/22 EST. NO. 001 TIME 05:07 PM R.E. NAME: ROBERT DECKER 06-1C4904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/20/22 EST. NO. 001 TIME 05:07 PM R.E. NAME: ROBERT DECKER 06-1C4904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1C4904 TIME 05:07 PM ESTIMATE NO. 001 BID OPENING 03/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: ROBERT DECKER DATE OF THIS ESTIMATE 06/20/22 LOCATION PROGRESS ESTIMATE 06-KER-58-15.4/27.2 ----------------- GRIFFITH COMPANY IN KERN COUNTY FROM ROUTE 33 TO 1128 CARRIER PARKWAY AVE; BUTTONWILLOW DRIVE BAKERSFIELD CA 93308 FED. AID NO. N O N E CONSTRUCT 0.10' RHMA-GAP GRADED ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 1.000 1,500.00 1.000 1,500 002 TIME-RELATED OVERHEAD (WDAY) WDAY 2,500.0000 87,500.00 8.000 20,000.00 8.000 20,000 003 CONSTRUCTION AREA SIGNS LS 3,250.0000 3,250.00 0.670 2,177.50 0.670 2,177 004 TRAFFIC CONTROL SYSTEM LS 281,788.0000 281,788.00 0.230 64,811.24 0.230 64,811 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 475.0000 2,375.00 0.000 0 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 3,300.0000 3,300.00 0.230 759.00 0.230 759 007 AUTOMATED FLAGGER ASSISTANCE DEVICE EA 92.0000 2,760.00 16.000 1,472.00 16.000 1,472 DAY 008 JOB SITE MANAGEMENT LS 3,000.0000 3,000.00 0.230 690.00 0.230 690 009 PREPARE WATER POLLUTION CONTROL PROGRAM LS 1,000.0000 1,000.00 0.750 750.00 0.750 750 010 TEMPORARY GRAVEL BAG BERM LF 25.0000 75.00 0.000 0 011 STREET SWEEPING LS 10,000.0000 10,000.00 0.230 2,300.00 0.230 2,300 012 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.4000 22,600.00 50,850.000 20,340.00 50,850.000 20,340 STRIPE (HAZARDOUS WASTE) 013 SHOULDER BACKING TON 60.0000 73,800.00 0.000 0 014 CRACK TREATMENT LNMI 3,900.0000 93,600.00 16.800 65,520.00 16.800 65,520 015 HOT MIX ASPHALT (TYPE A) TON 135.0000 140,400.00 0.000 0 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 110.0000 1,419,000.00 0.000 0 017 DATA CORE LS 3,400.0000 3,400.00 0.000 0 018 TACK COAT TON 450.0000 23,850.00 0.000 0 019 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 5.0000 30,700.00 0.000 0 020 24" REINFORCED CONCRETE PIPE LF 325.0000 18,200.00 56.000 18,200.00 56.000 18,200 021 REMOVE CULVERT (LF) LF 160.0000 8,960.00 56.000 8,960.00 56.000 8,960 022 REMOVE AND REPLACE MONUMENT EA 2,500.0000 5,000.00 0.000 0 PROGRAM CAS145 PAGE 2 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1C4904 TIME 05:07 PM ESTIMATE NO. 001 BID OPENING 03/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: ROBERT DECKER DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE PAVEMENT MARKER EA 1.0000 3,030.00 2,727.000 2,727.00 2,727.000 2,727 024 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.5000 13,635.00 0.000 0 025 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 11.0000 2,420.00 0.000 0 (0.063"-UNFRAMED) 026 INSTALL ROADSIDE SIGN PANEL ON EA 80.0000 3,520.00 0.000 0 EXISTING POST 027 THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 3,300.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 028 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 292.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 029 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 17,840.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 030 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9000 155,700.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 031 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.2500 20,850.00 75,060.000 18,765.00 75,060.000 18,765 032 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 990.00 288.900 866.70 288.900 866 033 TRAFFIC MONITORING STATION SYSTEM LS 23,100.0000 23,100.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 06/20/22 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1C4904 TIME 05:07 PM ESTIMATE NO. 001 BID OPENING 03/17/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/22 R.E. NAME: ROBERT DECKER DATE OF THIS ESTIMATE 06/20/22 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 229,838.44 229,838.44 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 229,838.44 229,838.44 ORIGINAL CONTRACT AMOUNT 2,480,735.00 TOTAL WORK COMPLETED 229,838.44 229,838.44 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 229,838.44 229,838.44 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/03/22 35 05/03/22 06/09/22 08/08/22 0 34 0 0 9% 0% PROGRESS IS SATISFACTORY ROBERT DECKER RESIDENT ENGINEER