PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/21/25 EST. NO. 001 TIME 03:28 PM R.E. NAME: AMARJIT DHALIWAL 06-1G7804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/21/25 EST. NO. 001 TIME 03:28 PM R.E. NAME: AMARJIT DHALIWAL 06-1G7804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/21/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 03:28 PM ESTIMATE NO. 001 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 07/21/25 LOCATION PROGRESS ESTIMATE 06-KER-5-54.2/62.5 ----------------- GRANITE CONSTRUCTION COMPANY KERN COUNTY FROM 2.0 MILES NORTH OF ROUTE 3005 JAMES ROAD 5/58 SEPARATION TO 4.5 MILES NORTH OF BAKERSFIELD CA 93308 ROWLEE ROAD OVERCROSSING FED. AID NO. N O N E COLD PLANE AC PAVEMENT, PLACE HMA (TYPE A) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.314 628.00 0.314 628 002 TIME-RELATED OVERHEAD (WDAY) WDAY 4,935.0000 172,725.00 11.000 54,285.00 11.000 54,285 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.557 5,570.00 0.557 5,570 004 TRAFFIC CONTROL SYSTEM LS 340,000.0000 340,000.00 0.314 106,760.00 0.314 106,760 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,700.0000 11,900.00 0.000 0 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 75.0000 2,625.00 11.000 825.00 11.000 825 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.314 3,140.00 0.314 3,140 008 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.314 1,570.00 0.314 1,570 009 WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 0.314 628.00 0.314 628 010 STREET SWEEPING LS 30,000.0000 30,000.00 0.314 9,420.00 0.314 9,420 011 ASPHALTIC EMULSION (FOG SEAL COAT) TON 400.0000 7,600.00 0.000 0 012 HOT MIX ASPHALT (TYPE A) TON 250.0000 362,500.00 564.620 141,155.00 564.620 141,155 013 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 140.0000 1,047,200.00 0.000 0 (OPEN GRADED FRICTION COURSE) 014 TACK COAT TON 400.0000 14,000.00 0.000 0 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.4000 331,200.00 3,175.400 7,620.96 3,175.400 7,620 016 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 11,450.00 0.000 0 017 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 1,920.00 0.000 0 (0.063"-UNFRAMED) 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.0000 3,230.00 0.000 0 (0.080"-UNFRAMED) 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 750.00 0.000 0 (0.063"-FRAMED) 020 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 280.0000 7,280.00 0.000 0 POST 021 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 10.0000 3,900.00 0.000 0 WET NIGHT VISIBILITY) 022 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 205.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) PROGRAM CAS145 PAGE 2 DATE 07/21/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 03:28 PM ESTIMATE NO. 001 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 07/21/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 21,950.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 96,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 025 12" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 7,830.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.314 314.00 0.314 314 SYSTEM ELEMENTS DURING CONSTRUCTION 027 MODIFYING TRAFFIC MONITORING STATIONS LS 15,000.0000 15,000.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 07/21/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 03:28 PM ESTIMATE NO. 001 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 07/21/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 331,915.96 331,915.96 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 331,915.96 331,915.96 ORIGINAL CONTRACT AMOUNT 2,519,865.00 TOTAL WORK COMPLETED 331,915.96 331,915.96 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 331,915.96 331,915.96 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/07/25 35 06/30/25 00/00/00 08/21/25 11 2 0 0 13% 31% PROGRESS IS SATISFACTORY AMARJIT DHALIWAL RESIDENT ENGINEER