PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/29/25 EST. NO. 003 TIME 01:16 PM R.E. NAME: AMARJIT DHALIWAL 06-1G7804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/29/25 EST. NO. 003 TIME 01:16 PM R.E. NAME: AMARJIT DHALIWAL 06-1G7804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE PERFORMANCE FAILURE -251,986.50 002 B2GNOW COMPLIANCE 10,000.00 003 MISSING CEM 4401 -10,000.00 003 0.00 -251,986.50 LABOR COMPLIANCE VIOLATION MISSING PAYROLL -10,000.00 003 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,000.00 -261,986.50 PROGRAM CAS145 PAGE 1 DATE 09/29/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 01:16 PM ESTIMATE NO. 003 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/07/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 09/29/25 LOCATION RERUN PROGRESS ESTIMATE AFTER ACCEPTANCE 06-KER-5-54.2/62.5 ---------------------------------------- GRANITE CONSTRUCTION COMPANY KERN COUNTY FROM 2.0 MILES NORTH OF ROUTE 3005 JAMES ROAD 5/58 SEPARATION TO 4.5 MILES NORTH OF BAKERSFIELD CA 93308 ROWLEE ROAD OVERCROSSING FED. AID NO. N O N E COLD PLANE AC PAVEMENT, PLACE HMA (TYPE A) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 0.086 172.00 1.000 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 4,935.0000 172,725.00 3.000 14,805.00 35.000 172,725 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.143 1,430.00 1.000 10,000 004 TRAFFIC CONTROL SYSTEM LS 340,000.0000 340,000.00 0.086 29,240.00 1.000 340,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,700.0000 11,900.00 5.000 8,500 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 75.0000 2,625.00 32.000 2,400 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.086 860.00 1.000 10,000 008 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 0.086 430.00 1.000 5,000 009 WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 0.086 172.00 1.000 2,000 010 STREET SWEEPING LS 30,000.0000 30,000.00 0.086 2,580.00 1.000 30,000 011 ASPHALTIC EMULSION (FOG SEAL COAT) TON 400.0000 7,600.00 19.000 7,600 012 HOT MIX ASPHALT (TYPE A) TON 250.0000 362,500.00 1,581.500 395,375 013 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 140.0000 1,047,200.00 7,603.630 1,064,508 (OPEN GRADED FRICTION COURSE) 014 TACK COAT TON 400.0000 14,000.00 35.000 14,000 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.4000 331,200.00 136,522.900 327,654 016 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 11,450.00 2,167.000 10,835 017 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 1,920.00 67.500 1,080 (0.063"-UNFRAMED) 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.0000 3,230.00 233.750 3,973 (0.080"-UNFRAMED) 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 750.00 0.000 0 (0.063"-FRAMED) 020 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 280.0000 7,280.00 26.000 7,280 POST 021 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 10.0000 3,900.00 362.000 3,620 WET NIGHT VISIBILITY) 022 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 205.00 384.000 192 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) PROGRAM CAS145 PAGE 2 DATE 09/29/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 01:16 PM ESTIMATE NO. 003 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/07/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 09/29/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 21,950.00 43,684.000 21,842 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 96,600.00 96,790.000 96,790 (ENHANCED WET NIGHT VISIBILITY) 025 12" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 7,830.00 2,808.000 8,424 (ENHANCED WET NIGHT VISIBILITY) 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 0.086 86.00 1.000 1,000 SYSTEM ELEMENTS DURING CONSTRUCTION 027 MODIFYING TRAFFIC MONITORING STATIONS LS 15,000.0000 15,000.00 1.000 15,000 PROGRAM CAS145 PAGE 3 DATE 09/29/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 01:16 PM ESTIMATE NO. 003 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/07/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 09/29/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 49,775.00 2,561,799.91 ADJUSTMENT OF COMPENSATION 0.00 -15,689.44 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 49,775.00 2,546,110.47 ORIGINAL CONTRACT AMOUNT 2,519,865.00 TOTAL WORK COMPLETED 49,775.00 2,546,110.47 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS -10,000.00 -261,986.50 TOTAL 39,775.00 2,284,123.97 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/07/25 35 06/30/25 00/00/00 09/07/25 35 16 0 0 100% 100% AMARJIT DHALIWAL RESIDENT ENGINEER