PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/14/25 EST. NO. 004 TIME 01:56 PM R.E. NAME: AMARJIT DHALIWAL 06-1G7804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/14/25 EST. NO. 004 TIME 01:56 PM R.E. NAME: AMARJIT DHALIWAL 06-1G7804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE PERFORMANCE FAILURE -251,986.50 002 B2GNOW COMPLIANCE 10,000.00 003 MISSING CEM 4401 -10,000.00 003 B2GNOW REL ERROR -10,000.00 004 FAIL SMOOTHNESS TEST -2,987.73 004 MISSING CEM 2402 -10,000.00 004 MISSING OCR 0003 -10,000.00 004 REL PERFORMANCE FAIL 251,986.50 004 218,998.77 -32,987.73 LABOR COMPLIANCE VIOLATION MISSING PAYROLL -10,000.00 003 0.00 -10,000.00 TOTAL DEDUCTIONS 218,998.77 -42,987.73 PROGRAM CAS145 PAGE 1 DATE 10/14/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 01:56 PM ESTIMATE NO. 004 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/07/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 10/14/25 LOCATION SEMI-FINAL ESTIMATE 06-KER-5-54.2/62.5 ------------------- GRANITE CONSTRUCTION COMPANY KERN COUNTY FROM 2.0 MILES NORTH OF ROUTE 3005 JAMES ROAD 5/58 SEPARATION TO 4.5 MILES NORTH OF BAKERSFIELD CA 93308 ROWLEE ROAD OVERCROSSING FED. AID NO. N O N E COLD PLANE AC PAVEMENT, PLACE HMA (TYPE A) ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 4,935.0000 172,725.00 35.000 172,725 003 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 1.000 10,000 004 TRAFFIC CONTROL SYSTEM LS 340,000.0000 340,000.00 1.000 340,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 1,700.0000 11,900.00 5.000 8,500 006 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 75.0000 2,625.00 32.000 2,400 SYSTEM 007 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 1.000 10,000 008 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 009 WATER POLLUTION CONTROL PROGRAM LS 2,000.0000 2,000.00 1.000 2,000 010 STREET SWEEPING LS 30,000.0000 30,000.00 1.000 30,000 011 ASPHALTIC EMULSION (FOG SEAL COAT) TON 400.0000 7,600.00 19.000 7,600 012 HOT MIX ASPHALT (TYPE A) TON 250.0000 362,500.00 1,581.500 395,375 013 RUBBERIZED HOT MIX ASPHALT-OPEN GRADED TON 140.0000 1,047,200.00 7,603.630 1,064,508 (OPEN GRADED FRICTION COURSE) 014 TACK COAT TON 400.0000 14,000.00 35.000 14,000 015 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.4000 331,200.00 136,522.900 327,654 016 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 11,450.00 2,167.000 10,835 017 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 16.0000 1,920.00 67.500 1,080 (0.063"-UNFRAMED) 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 17.0000 3,230.00 233.750 3,973 (0.080"-UNFRAMED) 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 30.0000 750.00 0.000 0 (0.063"-FRAMED) 020 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 280.0000 7,280.00 26.000 7,280 POST 021 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 10.0000 3,900.00 362.000 3,620 WET NIGHT VISIBILITY) 022 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 205.00 384.000 192 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) PROGRAM CAS145 PAGE 2 DATE 10/14/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 01:56 PM ESTIMATE NO. 004 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/07/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 10/14/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.5000 21,950.00 43,684.000 21,842 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 96,600.00 96,790.000 96,790 (ENHANCED WET NIGHT VISIBILITY) 025 12" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 7,830.00 2,808.000 8,424 (ENHANCED WET NIGHT VISIBILITY) 026 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,000.0000 1,000.00 1.000 1,000 SYSTEM ELEMENTS DURING CONSTRUCTION 027 MODIFYING TRAFFIC MONITORING STATIONS LS 15,000.0000 15,000.00 1.000 15,000 PROGRAM CAS145 PAGE 3 DATE 10/14/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G7804 TIME 01:56 PM ESTIMATE NO. 004 BID OPENING 02/25/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/07/25 R.E. NAME: AMARJIT DHALIWAL DATE OF THIS ESTIMATE 10/14/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 0.00 2,561,799.91 ADJUSTMENT OF COMPENSATION 0.00 -15,689.44 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 0.00 2,546,110.47 ORIGINAL CONTRACT AMOUNT 2,519,865.00 TOTAL WORK COMPLETED 0.00 2,546,110.47 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 218,998.77 -42,987.73 TOTAL 218,998.77 2,503,122.74 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 05/07/25 35 06/30/25 00/00/00 09/07/25 35 16 0 0 100% 100% AMARJIT DHALIWAL RESIDENT ENGINEER