PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/30/26 EST. NO. 008 TIME 12:07 PM R.E. NAME: MIKE GARRETT 06-1G8104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 30,519.15 A.C. @ L.S.(+) 072926 N 1 30,519.15 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 30,519.15 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/30/26 EST. NO. 008 TIME 12:07 PM R.E. NAME: MIKE GARRETT 06-1G8104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE B2GNOW NONCOMPLIANCE -20,000.00 003 B2GNOW NONCOMPLIANCE -20,000.00 005 MISSING CEM 2402 -10,000.00 005 MISSING CEM 4401 -10,000.00 005 MISSING DOT OCR-0003 -10,000.00 005 DVBE NONCOMPLIANCE -1,978.91 006 MVC VIOLATION -10,000.00 006 B2G COMPL REL 40,000.00 007 NON COMP RE MASON -892.00 007 NON COMP STATEWIDE -3,131.48 007 RECD CEM 2402 10,000.00 008 RECD CEM OCR-003 10,000.00 008 RECD CEM 4401 10,000.00 008 REL DVBE COMP 1,978.91 008 REL MCV DEDUCT 10,000.00 008 41,978.91 -4,023.48 LABOR COMPLIANCE VIOLATION MISSING PAYROLL -10,000.00 005 RECD MISSING PAYROLL 10,000.00 008 10,000.00 0.00 TOTAL DEDUCTIONS 51,978.91 -4,023.48 PROGRAM CAS145 PAGE 1 DATE 07/30/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G8104 TIME 12:07 PM ESTIMATE NO. 008 BID OPENING 04/03/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/21/25 R.E. NAME: MIKE GARRETT DATE OF THIS ESTIMATE 07/30/26 LOCATION RERUN FINAL ESTIMATE 06-TUL-63-R19.2/R24.3 -------------------- ARCHER CIVIL CONSTRUCTION, LLC TULARE COUNTY AT AND NEAR CUTLER AND OROSI 1353 SOUTH J STREET FROM AVENUE 384 TO AVENUE 422 TULARE CA 93274 FED. AID NO. N O N E HMA (TYPE A), RHMA-G, AND COLD PLANE AC PA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 1,650.0000 1,650.00 1.000 1,650 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,250.0000 50,000.00 9.000 11,250.00 40.000 50,000 003 CONSTRUCTION AREA SIGNS LS 20,064.0000 20,064.00 1.000 20,064 004 TRAFFIC CONTROL SYSTEM LS 99,548.0000 99,548.00 1.000 99,548 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 600.0000 6,000.00 9.000 5,400 006 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 2,983.0000 2,983.00 1.000 2,983 007 AUTOMATED FLAGGER ASSISTANCE DEVICE DAY EA 21.0000 840.00 21.000 441 008 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 009 WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 1.000 1,500 010 TEMPORARY DRAINAGE INLET PROTECTION EA 162.6400 3,740.72 8.038 1,307 011 STREET SWEEPING LS 23,320.0000 23,320.00 1.000 23,320 012 HOT MIX ASPHALT (TYPE A) TON 166.9300 121,858.90 838.130 139,909 013 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 147.6200 828,148.20 4,000.760 590,592 014 DATA CORE LS 5,940.0000 5,940.00 1.000 5,940 015 TACK COAT TON 1,089.5000 23,969.00 17.646 19,225 016 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.3500 111,390.00 37,849.560 88,946 017 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.7000 7,392.00 584.000 4,496 018 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 26.4000 8,976.00 20.090 530.38 340.000 8,976 (0.063"-UNFRAMED) 019 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 24.2000 1,210.00 0.060 1.45 50.000 1,210 (0.080"-UNFRAMED) 020 INSTALL ROADSIDE SIGN PANEL ON EXISTING EA 24.2000 1,573.00 1.000 24.20 65.000 1,573 POST 021 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 11.9900 34,651.10 63.000 755.37 1,224.000 14,675 WET NIGHT VISIBILITY) 022 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.1000 1,133.00 955.000 1,050 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) PROGRAM CAS145 PAGE 2 DATE 07/30/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G8104 TIME 12:07 PM ESTIMATE NO. 008 BID OPENING 04/03/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/21/25 R.E. NAME: MIKE GARRETT DATE OF THIS ESTIMATE 07/30/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0400 18,096.00 11,570.000 12,032 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.9900 42,570.00 8.000 7.92 34,349.000 34,005 (ENHANCED WET NIGHT VISIBILITY) 025 6" THERMOPLASTIC TRAFFIC STRIPE LF 4.4000 3,036.00 212.000 932 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 026 8" THERMOPLASTIC TRAFFIC STRIPE LF 4.4000 1,628.00 495.000 2,178 (ENHANCED WET NIGHT VISIBILITY) 027 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 9.9000 4,950.00 0.000 0 028 12" RUMBLE STRIP (ASPHALT CONCRETE STA 112.3700 13,484.40 96.023 10,790 PAVEMENT) 029 METHYL METHACRYLATE PAINT TRAFFIC STRIPE SQFT 5.5000 14,410.00 427.000 2,348 CROSSWALK AND PAVEMENT MARKING 030 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 880.0000 880.00 1.000 880 SYSTEM ELEMENTS DURING CONSTRUCTION 031 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 10,780.0000 10,780.00 1.000 10,780 032 MODIFYING TRAFFIC MONITORING STATIONS LS 18,755.0000 18,755.00 1.000 18,755 PROGRAM CAS145 PAGE 3 DATE 07/30/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1G8104 TIME 12:07 PM ESTIMATE NO. 008 BID OPENING 04/03/25 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/21/25 R.E. NAME: MIKE GARRETT DATE OF THIS ESTIMATE 07/30/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 12,569.32 1,180,511.09 ADJUSTMENT OF COMPENSATION 30,519.15 30,519.15 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 43,088.47 1,211,030.24 ORIGINAL CONTRACT AMOUNT 1,489,476.32 TOTAL WORK COMPLETED 43,088.47 1,211,030.24 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 51,978.91 -4,023.48 TOTAL 95,067.38 1,207,006.76 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/09/25 40 00/00/00 00/00/00 11/21/25 31 35 0 0 100% 100% MIKE GARRETT RESIDENT ENGINEER