PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/25/26 EST. NO. 001 TIME 08:47 AM R.E. NAME: EDUARDO BRAVO 06-1H9004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/25/26 EST. NO. 001 TIME 08:47 AM R.E. NAME: EDUARDO BRAVO 06-1H9004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1H9004 TIME 08:47 AM ESTIMATE NO. 001 BID OPENING 04/14/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: EDUARDO BRAVO DATE OF THIS ESTIMATE 08/25/26 LOCATION PROGRESS ESTIMATE 06-FRE-168-T23.6/53.8 ----------------- CENTRAL COAST FINANCIAL GROUP, FRESNO COUNTY AT VARIOUS LOCATIONS FROM INC. DBA CCFG CONSTRUCTION 0.1 MILE WEST OF NICHOLAS ROAD TO 4.1 17750 WARDS FERRY RD MILES EAST OF HUNTINGTON LAKE ROAD SONORA CA 95370 FED. AID NO. N O N E CURED-IN-PLACE PIPELINER AND CULVERT REPLA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 0.000 0 002 TIME-RELATED OVERHEAD (WDAY) WDAY 1,000.0000 40,000.00 6.000 6,000.00 6.000 6,000 003 CONSTRUCTION AREA SIGNS LS 11,695.0000 11,695.00 0.400 4,678.00 0.400 4,678 004 TRAFFIC CONTROL SYSTEM LS 132,000.0000 132,000.00 0.150 19,800.00 0.150 19,800 005 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 6,000.0000 6,000.00 0.470 2,820.00 0.470 2,820 006 JOB SITE MANAGEMENT LS 90,000.0000 90,000.00 0.150 13,500.00 0.150 13,500 007 WATER POLLUTION CONTROL PROGRAM LS 3,500.0000 3,500.00 1.000 3,500.00 1.000 3,500 008 STREET SWEEPING LS 5,000.0000 5,000.00 0.000 0 009 TEMPORARY CONCRETE WASHOUT LS 3,500.0000 3,500.00 0.000 0 010 HOT MIX ASPHALT (TYPE A) TON 790.0000 38,710.00 0.000 0 011 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 360.0000 1,620.00 0.000 0 012 TACK COAT TON 2,000.0000 400.00 0.000 0 013 STRESS REDUCING SLAB CY 650.0000 5,850.00 0.000 0 014 24" REINFORCED CONCRETE PIPE LF 350.0000 19,250.00 0.000 0 015 18" CORRUGATED STEEL PIPE (.109" THICK) LF 250.0000 77,500.00 50.000 12,500.00 50.000 12,500 016 18" STEEL FLARED END SECTION EA 1,200.0000 7,200.00 1.000 1,200.00 1.000 1,200 017 24" STEEL FLARED END SECTION EA 1,500.0000 4,500.00 0.000 0 018 24" CONCRETE FLARED END SECTION EA 2,500.0000 5,000.00 0.000 0 019 REMOVE CULVERT (LF) LF 34.0000 12,580.00 67.200 2,284.80 67.200 2,284 020 REMOVE FLARED END SECTION (EA) EA 900.0000 3,600.00 1.000 900.00 1.000 900 021 CLEANING, INSPECTING, AND PREPARING LF 36.2400 23,556.00 215.000 7,791.60 215.000 7,791 CULVERT (LF) 022 18" CURED-IN-PLACE PIPELINER LF 435.3700 20,897.76 0.000 0 PROGRAM CAS145 PAGE 2 DATE 08/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1H9004 TIME 08:47 AM ESTIMATE NO. 001 BID OPENING 04/14/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: EDUARDO BRAVO DATE OF THIS ESTIMATE 08/25/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 24" CURED-IN-PLACE PIPELINER LF 256.4100 153,846.00 0.000 0 024 FRAME AND COVER EA 5,000.0000 5,000.00 0.000 0 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 60.00 0.000 0 026 MARKER (CULVERT) EA 170.0000 4,420.00 0.000 0 027 REMOVE MARKER EA 50.0000 1,300.00 0.000 0 028 6" TWO-COMPONENT PAINT TRAFFIC STRIPE LF 15.0000 3,300.00 0.000 0 029 6" TWO-COMPONENT PAINT TRAFFIC STRIPE LF 22.0000 528.00 0.000 0 (BROKEN 17-7) 030 6" THERMOPLASTIC TRAFFIC STRIPE LF 22.0000 4,840.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 031 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 08/25/26 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-1H9004 TIME 08:47 AM ESTIMATE NO. 001 BID OPENING 04/14/26 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/26 R.E. NAME: EDUARDO BRAVO DATE OF THIS ESTIMATE 08/25/26 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 74,974.40 74,974.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 74,974.40 74,974.40 ORIGINAL CONTRACT AMOUNT 693,652.76 TOTAL WORK COMPLETED 74,974.40 74,974.40 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 74,974.40 74,974.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/03/26 40 07/01/26 00/00/00 10/09/26 6 9 0 0 11% 15% PROGRESS IS SATISFACTORY EDUARDO BRAVO RESIDENT ENGINEER