PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/04 EST. NO.01 TIME 09:52 AM R.E. NAME: RAUL LOPEZ 06-339504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/04 EST. NO.01 TIME 09:52 AM R.E. NAME: RAUL LOPEZ 06-339504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-339504 TIME 09:52 AM ESTIMATE NO. 01 BID OPENING 08/26/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/04 R.E. NAME: RAUL LOPEZ DATE OF THIS ESTIMATE 03/22/04 LOCATION PROGRESS ESTIMATE 06-TUL-63-8.0/9.2 ----------------- GRANITE CONSTRUCTION COMPANY IN TULARE COUNTY IN VISALIA FROM P O BOX 50085 MINERAL KING AVENUE TO HOUSTON WATSONVILLE CA 950775085 AVENUE FED. AID NO. ACST-P063(16)E ,P-P063(16)E ASPHALT CONCRETE OVERLAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 7,000.0000 7,000.00 0.000 0.00 02 TIME-RELATED OVERHEAD WDAY 1,090.0000 130,800.00 0.000 0.00 03 PREPARE STORM WATER POLLUTION LS 7,000.0000 7,000.00 0.000 0.00 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 15,000.0000 15,000.00 0.750 11,250.00 0.750 11,250.00 05 CONSTRUCTION AREA SIGNS LS 8,000.0000 8,000.00 0.000 0.00 S) 06 TRAFFIC CONTROL SYSTEM LS 40,000.0000 40,000.00 0.000 0.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 17,000.0000 17,000.00 0.000 0.00 S) 08 REMOVE BASE AND SURFACING M3 14.0000 172,200.00 0.000 0.00 09 ADJUST MONUMENT TO GRADE EA 650.0000 1,300.00 0.000 0.00 10 ADJUST MANHOLE TO GRADE EA 650.0000 46,150.00 0.000 0.00 11 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 20.0000 48,400.00 0.000 0.00 S) (75 MM MAXIMUM) 12 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 6.0000 55,680.00 0.000 0.00 S) (165 MM MAXIMUM) 13 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 7.0000 119,000.00 0.000 0.00 S) AND BASE (165 MM MAXIMUM) 14 REMOVE CONCRETE (MISCELLANEOUS) M3 345.0000 55,200.00 0.000 0.00 15 CLASS 2 AGGREGATE BASE M3 31.0000 263,500.00 0.000 0.00 16 ASPHALT CONCRETE TONN 52.0000 1,034,800.00 0.000 0.00 17 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 60.00 0.000 0.00 18 MINOR CONCRETE (MINOR STRUCTURE) M3 2,600.0000 101,400.00 0.000 0.00 F) 19 MINOR CONCRETE (BACKFILL) M3 245.0000 20,825.00 0.000 0.00 20 300 MM ALTERNATIVE PIPE CULVERT M 490.0000 1,470.00 0.000 0.00 21 450 MM ALTERNATIVE PIPE CULVERT M 270.0000 6,210.00 0.000 0.00 22 600 MM ALTERNATIVE PIPE CULVERT M 315.0000 4,410.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/22/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-339504 TIME 09:52 AM ESTIMATE NO. 01 BID OPENING 08/26/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/04 R.E. NAME: RAUL LOPEZ DATE OF THIS ESTIMATE 03/22/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 24 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 25 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 26 300 MM REINFORCED CONCRETE PIPE M 320.0000 10,880.00 0.000 0.00 27 450 MM REINFORCED CONCRETE PIPE M 455.0000 21,385.00 0.000 0.00 28 600 MM REINFORCED CONCRETE PIPE M 250.0000 13,250.00 0.000 0.00 29 MANHOLE EA 3,950.0000 31,600.00 0.000 0.00 30 MINOR CONCRETE (MISCELLANEOUS M3 685.0000 130,150.00 0.000 0.00 CONSTRUCTION) 31 MISCELLANEOUS IRON AND STEEL KG 2.0000 16,936.00 0.000 0.00 SF) 32 THERMOPLASTIC PAVEMENT MARKING M2 22.0000 15,840.00 0.000 0.00 S) 33 THERMOPLASTIC TRAFFIC STRIPE M 0.5000 1,910.00 0.000 0.00 S) (SPRAYABLE) 34 PAVEMENT MARKER (REFLECTIVE BLUE) EA 11.0000 220.00 0.000 0.00 S) 35 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 900.00 0.000 0.00 S) 36 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 48,000.0000 48,000.00 0.000 0.00 S) 37 MODIFY SIGNAL AND LIGHTING (LOCATION 2) LS 67,000.0000 67,000.00 0.000 0.00 S) 38 MODIFY SIGNAL AND LIGHTING (LOCATION 3) LS 60,000.0000 60,000.00 0.000 0.00 S) 39 MODIFY SIGNAL AND LIGHTING (LOCATION 4) LS 58,000.0000 58,000.00 0.000 0.00 S) 40 MODIFY LIGHTING LS 15,200.0000 15,200.00 0.000 0.00 S) 41 MODIFY SIGNAL AND LIGHTING (LOCATION 5) LS 7,800.0000 7,800.00 0.000 0.00 S) 42 MODIFY SIGNAL AND LIGHTING (LOCATION 6) LS 8,300.0000 8,300.00 0.000 0.00 S) 43 MODIFY SIGNAL AND LIGHTING (LOCATION 7) LS 68,000.0000 68,000.00 0.000 0.00 S) 44 MODIFY SIGNAL AND LIGHTING (LOCATION 8) LS 52,000.0000 52,000.00 0.000 0.00 S) 45 MODIFY SIGNAL AND LIGHTING (LOCATION 9) LS 62,700.0000 62,700.00 0.000 0.00 S) 46 MODIFY SIGNAL AND LIGHTING LS 56,750.0000 56,750.00 0.000 0.00 S) (LOCATION 10) 47 MODIFY SIGNAL AND LIGHTING LS 58,000.0000 58,000.00 0.000 0.00 S) (LOCATION 11) 48 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 49 150 MM WELDED STEEL PIPE (3.40 MM THICK) M 285.0000 14,535.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 03/22/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-339504 TIME 09:52 AM ESTIMATE NO. 01 BID OPENING 08/26/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/04 R.E. NAME: RAUL LOPEZ DATE OF THIS ESTIMATE 03/22/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 200 MM WELDED STEEL PIPE (4.78 MM THICK) M 240.0000 9,840.00 0.000 0.00 51 250 MM WELDED STEEL PIPE (6.35 MM THICK) M 340.0000 4,760.00 0.000 0.00 PROGRAM CAS145 PAGE 4 DATE 03/22/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-339504 TIME 09:52 AM ESTIMATE NO. 01 BID OPENING 08/26/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/04 R.E. NAME: RAUL LOPEZ DATE OF THIS ESTIMATE 03/22/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 11,250.00 11,250.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 11,250.00 11,250.00 52 MOBILIZATION LS 304,900.0000 304,900.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 3,294,261.00 TOTAL WORK COMPLETED 11,250.00 11,250.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 11,250.00 11,250.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/15/03 120 10/30/03 10/30/03 09/24/04 2 95 0 0 0% 2% PROGRESS IS SATISFACTORY *** SUSPENDED ON 10/30/03. RAUL LOPEZ RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 03/22/04