PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/31/07 EST. NO.03 TIME 05:57 AM R.E. NAME: SHERRILL, OSCAR 06-342454 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 004 0001 30,440.60 E.W. @ L.S.(+) 051407 N 1 0 005 0001 10,000.00 E.W. @ L.S.(+) 052207 N 001 0 40,440.60 TOTAL THIS ESTIMATE 70,194.00 TOTAL PREVIOUS ESTIMATE 110,634.60 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/31/07 EST. NO.03 TIME 05:57 AM R.E. NAME: SHERRILL, OSCAR 06-342454 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CEM2402 GOAL NOT MET -645.00 03 -645.00 -645.00 TOTAL DEDUCTIONS -645.00 -645.00 PROGRAM CAS145 PAGE 1 DATE 05/31/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-342454 TIME 05:57 AM ESTIMATE NO. 03 BID OPENING 11/15/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/15/07 R.E. NAME: SHERRILL, OSCAR DATE OF THIS ESTIMATE 05/31/07 LOCATION RERUN PROGRESS ESTIMATE AFTER ACCEPTANCE 06-FRE-180-61.4/63.5 ---------------------------------------- GRANITE CONSTRUCTION IN FRESNO COUNTY IN AND NEAR FRESNO P.O. BOX 50085 FROM CHESTNUT AVENUE TO CLOVIS AVENUE FED. AID NO. N O N E RESURFACE EXISTING HIGHWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 700.0000 700.00 0.250 175.00 1.000 700.00 PROGRAM 02 WATER POLLUTION CONTROL LS 100.0000 100.00 0.250 25.00 1.000 100.00 03 TEMPORARY DRAINAGE INLET PROTECTION EA 350.0000 700.00 15.000 5,250.00 04 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 750.0000 750.00 1.000 750.00 05 CONSTRUCTION AREA SIGNS LS 6,000.0000 6,000.00 0.100 600.00 1.000 6,000.00 S) 06 TRAFFIC CONTROL SYSTEM LS 40,000.0000 40,000.00 0.500 20,000.00 1.000 40,000.00 S) 07 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,500.0000 1,500.00 0.250 375.00 1.000 1,500.00 S) 08 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.1500 46,230.00 40,126.000 46,144.90 S) 09 ASPHALT CONCRETE (TYPE A) TONN 90.0000 390,600.00 4,340.000 390,600.00 4,360.000 392,400.00 10 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 18.00 8.431 8.43 8.431 8.43 11 MINOR CONCRETE (MISCELLANEOUS M3 1,000.0000 51,000.00 76.590 76,590.00 CONSTRUCTION) 12 THERMOPLASTIC PAVEMENT MARKING M2 27.0000 14,850.00 51.330 1,385.91 51.330 1,385.91 S) 13 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.7000 1,581.00 1,089.600 1,852.32 1,089.600 1,852.32 S) 14 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.5000 1,875.00 340.500 510.75 340.500 510.75 S) 15 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6500 4,478.50 3,900.000 2,535.00 3,900.000 2,535.00 S) (BROKEN 10.98 M - 3.66 M) 16 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.5000 2,345.00 324.000 1,134.00 324.000 1,134.00 S) 17 DETECTOR LOOP LS 13,500.0000 13,500.00 1.000 13,500.00 1.000 13,500.00 S) PROGRAM CAS145 PAGE 2 DATE 05/31/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-342454 TIME 05:57 AM ESTIMATE NO. 03 BID OPENING 11/15/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/15/07 R.E. NAME: SHERRILL, OSCAR DATE OF THIS ESTIMATE 05/31/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 432,701.41 590,361.31 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 40,440.60 110,634.60 SUBTOTAL AMOUNT EARNED 473,142.01 700,995.91 ORIGINAL CONTRACT AMOUNT 576,227.50 TOTAL WORK COMPLETED 473,142.01 700,995.91 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -645.00 -645.00 TOTAL 472,497.01 700,350.91 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/05/07 45 03/19/07 01/24/07 05/15/07 39 3 13 0 100% 100% SHERRILL, OSCAR RESIDENT ENGINEER PROGRAM CAS145 DATE 05/31/07