PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/24/06 EST. NO.03 TIME 10:50 AM R.E. NAME: WOODS, JOHN A 06-350704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 618.08 E.W. @ F.A.(+) 022306 N 0001.0 0004 113.69 030106 N 0004.0 0005 125.24 030706 N 0005.0 0006 150.29 030806 N 0006.0 0007 63.59 030906 N 0007.0 0009 316.91 031306 N 0009.0 0010 333.24 031406 N 0011.0 0011 316.91 031506 N 0012.0 0012 337.38 031606 N 0013.0 0013 300.57 031706 N 0014.0 0015 233.05 032106 N 0016.0 0016 200.38 032206 N 0017.0 0017 200.38 032306 N 0018.0 0018 200.38 032306 N 0019.0 0019 400.76 032406 N 0020.0 0020 400.76 032406 N 0021.0 0025 75.14 032706 N 0034.0 0027 400.76 033006 N 0036.0 013 0002 3,822.00 E.W. @ L.S.(+) 032106 N 163530 017 0001 229.73 E.W. @ F.A.(+) 031306 N 0010.0 8,839.24 TOTAL THIS ESTIMATE 4,683.00 TOTAL PREVIOUS ESTIMATE 13,522.24 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/24/06 EST. NO.03 TIME 10:50 AM R.E. NAME: WOODS, JOHN A 06-350704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 03 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 LOCATION PROGRESS ESTIMATE 06-FRE-99-R0.7/7.4 ----------------- F C I CONSTRUCTORS INC IN FRESNO COUNTY IN AND NEAR 2100 GOODYEAR ROAD KINGSBURG AND SELMA FROM ROUTE BENICIA CA 94510 99 AND 201 SEPARATION TO 1.5 KM NORTH OF FLORAL AVENUE UNDERCROSSING FED. AID NO. ACNH-P099(450)E ,ACBH-P099(450)E ,NH-P099(450)E WIDEN AND REHABILITATE FREEWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.000 0.00 02 TIME-RELATED OVERHEAD LS 2160,000.0000 2,160,000.00 0.034 73,440.00 0.034 73,440.00 03 PREPARE STORM WATER POLLUTION LS 9,000.0000 9,000.00 0.750 6,750.00 PREVENTION PLAN 04 WATER POLLUTION CONTROL LS 100,000.0000 100,000.00 0.052 5,200.00 0.199 19,900.00 05 TEMPORARY CONCRETE WASHOUT FACILITY EA 4,000.0000 48,000.00 1.000 4,000.00 06 CONSTRUCTION AREA SIGNS LS 25,000.0000 25,000.00 0.040 1,000.00 0.740 18,500.00 S) 07 TRAFFIC CONTROL SYSTEM LS 350,000.0000 350,000.00 0.052 18,200.00 0.199 69,650.00 S) 08 TYPE II BARRICADE EA 80.0000 1,440.00 0.000 0.00 S) 09 TYPE III BARRICADE EA 150.0000 3,600.00 0.000 0.00 S) 10 TEMPORARY TRAFFIC STRIPE (TAPE) M 5.0000 74,500.00 0.000 0.00 S) 11 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 35,700.00 58.000 1,740.00 134.000 4,020.00 S) 12 PORTABLE CHANGEABLE MESSAGE SIGN LS 50,000.0000 50,000.00 0.052 2,600.00 0.199 9,950.00 S) 13 TEMPORARY RAILING (TYPE K) M 29.0000 1,368,800.00 335.380 9,726.02 1,883.764 54,629.16 14 TEMPORARY CRASH CUSHION MODULE EA 450.0000 274,500.00 13.000 5,850.00 15 ABANDON CULVERT EA 1,500.0000 10,500.00 0.000 0.00 16 REMOVE FENCE (TYPE WM) M 6.0000 9,480.00 0.000 0.00 S) 17 REMOVE FLARED END SECTION EA 325.0000 1,950.00 0.000 0.00 18 REMOVE TRAFFIC STRIPE M 1.6500 168,300.00 91.200 150.48 665.200 1,097.58 S) 19 REMOVE PAINTED PAVEMENT MARKING M2 25.0000 600.00 0.000 0.00 S) 20 REMOVE PAVEMENT MARKER EA 1.0000 16,600.00 4,735.000 4,735.00 4,998.000 4,998.00 S) 21 REMOVE ROADSIDE SIGN EA 100.0000 3,300.00 0.000 0.00 22 REMOVE SIGN STRUCTURE EA 5,000.0000 20,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE ASPHALT CONCRETE DIKE M 6.0000 26,340.00 0.000 0.00 24 REMOVE PIPE M 120.0000 9,840.00 0.000 0.00 25 REMOVE INLET EA 800.0000 20,800.00 0.000 0.00 26 REMOVE DOWNDRAIN EA 220.0000 4,400.00 0.000 0.00 27 REMOVE CONCRETE PAVEMENT M3 120.0000 488,400.00 0.000 0.00 28 GRIND ASPHALT CONCRETE SURFACING M2 9.0000 56,223.00 0.000 0.00 SF) 29 SALVAGE SINGLE THRIE BEAM BARRIER M 22.0000 259,600.00 0.000 0.00 S) 30 SALVAGE METAL BEAM GUARD RAILING M 20.0000 28,800.00 0.000 0.00 S) 31 RECONSTRUCT THRIE BEAM BARRIER M 70.0000 18,900.00 0.000 0.00 S) 32 RECONSTRUCT METAL BEAM GUARD RAILING M 60.0000 100,200.00 0.000 0.00 S) 33 RELOCATE CONCRETE BARRIER (TYPE K) M 10.0000 2,700.00 0.000 0.00 34 RELOCATE ROADSIDE SIGN EA 360.0000 3,960.00 0.000 0.00 35 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 5.2500 371,700.00 0.000 0.00 S) 36 REMOVE CONCRETE CURB AND SIDEWALK M3 230.0000 75,900.00 59.920 13,781.60 59.920 13,781.60 37 REMOVE CONCRETE BARRIER (TYPE K) M 3.0000 25,500.00 0.000 0.00 38 CLEAN BRIDGE DECK M2 3.0000 18,741.00 0.000 0.00 39 BRIDGE REMOVAL (PORTION), LOCATION A LS 70,000.0000 70,000.00 0.200 14,000.00 0.700 49,000.00 40 BRIDGE REMOVAL (PORTION), LOCATION B LS 65,000.0000 65,000.00 0.500 32,500.00 0.500 32,500.00 41 BRIDGE REMOVAL (PORTION), LOCATION C LS 75,000.0000 75,000.00 0.200 15,000.00 0.600 45,000.00 42 BRIDGE REMOVAL (PORTION), LOCATION D LS 44,000.0000 44,000.00 0.000 0.00 43 BRIDGE REMOVAL (PORTION), LOCATION E LS 28,200.0000 28,200.00 0.000 0.00 44 CLEARING AND GRUBBING LS 175,000.0000 175,000.00 0.099 17,325.00 0.199 34,825.00 45 DEVELOP WATER SUPPLY LS 25,000.0000 25,000.00 0.099 2,475.00 0.199 4,975.00 46 ROADWAY EXCAVATION M3 34.0000 2,074,000.00 0.000 0.00 47 LEAD COMPLIANCE PLAN LS 10,000.0000 10,000.00 1.000 10,000.00 48 STRUCTURE EXCAVATION (BRIDGE) M3 100.0000 101,800.00 574.000 57,400.00 903.000 90,300.00 F) 49 STRUCTURE BACKFILL (BRIDGE) M3 70.0000 44,800.00 0.000 0.00 F) PROGRAM CAS145 PAGE 3 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 SAND BACKFILL M3 250.0000 4,750.00 0.000 0.00 51 HIGHWAY PLANTING LS 150,000.0000 150,000.00 0.000 0.00 S) 52 ROCK BLANKET M2 70.0000 52,500.00 0.000 0.00 S) 53 STRAW (EROSION CONTROL) TONN 440.0000 10,560.00 0.000 0.00 S) 54 FIBER (EROSION CONTROL) KG 1.0000 3,570.00 0.000 0.00 S) 55 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 400.0000 4,000.00 0.000 0.00 S) 56 PURE LIVE SEED (EROSION CONTROL) KG 90.0000 9,900.00 0.000 0.00 S) 57 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 4.0000 3,560.00 0.000 0.00 S) 58 STABILIZING EMULSION (EROSION CONTROL) KG 4.0000 3,360.00 0.000 0.00 S) 59 PLANT ESTABLISHMENT WORK LS 50,000.0000 50,000.00 0.000 0.00 S) 60 IRRIGATION SYSTEM LS 100,000.0000 100,000.00 0.000 0.00 S) 61 200 MM WELDED STEEL PIPE CONDUIT M 300.0000 21,900.00 0.000 0.00 S) (6.35 MM THICK) 62 EXTEND 300 MM CONDUIT M 150.0000 18,000.00 0.000 0.00 S) 63 CLASS 2 AGGREGATE BASE M3 94.0000 94,000.00 0.000 0.00 64 AGGREGATE BASE (COLD PLANED MATERIAL) M3 44.0000 103,400.00 0.000 0.00 65 AGGREGATE BASE (APPROACH SLAB) M3 225.0000 19,350.00 0.000 0.00 66 LEAN CONCRETE BASE M3 146.0000 4,102,600.00 0.000 0.00 67 SEAL RANDOM CRACKS LNKM 15,000.0000 21,000.00 0.000 0.00 68 ASPHALT CONCRETE (TYPE A) TONN 96.5000 2,943,250.00 0.000 0.00 69 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 70.0000 8,400.00 0.000 0.00 AREA) 70 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 9.0000 2,880.00 0.000 0.00 71 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 9.0000 810.00 0.000 0.00 72 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 9.0000 32,130.00 0.000 0.00 73 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 10.0000 4,200.00 0.000 0.00 74 ASPHALTIC EMULSION (PAINT BINDER) TONN 2,900.0000 124,700.00 0.000 0.00 75 CONCRETE PAVEMENT M3 223.0000 10,235,700.00 0.000 0.00 76 REPLACE CONCRETE PAVEMENT M3 504.0000 1,648,080.00 0.000 0.00 (REGULAR STRENGTH CONCRETE) PROGRAM CAS145 PAGE 4 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 REPLACE CONCRETE PAVEMENT M3 844.0000 2,869,600.00 0.000 0.00 (RAPID STRENGTH CONCRETE) 78 SEAL PAVEMENT JOINT M 11.5000 1,368,500.00 0.000 0.00 79 SEAL LONGITUDINAL ISOLATION JOINT M 14.0000 285,600.00 0.000 0.00 80 REPAIR SPALLED JOINTS M2 1,600.0000 110,400.00 0.000 0.00 81 ROUT AND SEAL RANDOM CRACKS M 14.0000 5,040.00 0.000 0.00 82 GRIND EXISTING CONCRETE M2 7.6000 1,520,000.00 23,654.130 179,771.39 23,654.130 179,771.39 S) PAVEMENT 83 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 750.0000 291,000.00 36.300 27,225.00 353.080 264,810.00 S) PILING 84 600 MM CAST-IN-DRILLED-HOLE CONCRETE M 750.0000 238,500.00 0.000 0.00 S) PILING 85 FURNISH PILING (CLASS 400) M 75.0000 22,875.00 0.000 0.00 86 DRIVE PILE (CLASS 400) EA 3,000.0000 84,000.00 0.000 0.00 S) 87 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 230.0000 1,110,900.00 665.200 152,996.00 1,161.400 267,122.00 S) PILING (BARRIER) 88 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 600.0000 97,200.00 68.000 40,800.00 68.000 40,800.00 F) 89 STRUCTURAL CONCRETE, BRIDGE M3 1,550.0000 3,247,250.00 0.000 0.00 F) 90 STRUCTURAL CONCRETE, APPROACH SLAB M3 900.0000 270,900.00 0.000 0.00 F) (TYPE N) 91 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,050.0000 886,200.00 0.000 0.00 (TYPE R) 92 CLASS 4 CONCRETE (BACKFILL) M3 175.0000 113,750.00 0.000 0.00 93 MINOR CONCRETE (MINOR STRUCTURE) M3 2,100.0000 302,400.00 0.000 0.00 F) 94 PAVING NOTCH EXTENSION M3 6,500.0000 117,000.00 0.000 0.00 95 DRILL AND BOND DOWEL M 80.0000 10,000.00 8.600 688.00 8.600 688.00 96 FURNISH PRECAST PRESTRESSED CONCRETE EA 6,200.0000 99,200.00 0.000 0.00 S) GIRDER (10 M - 15 M) 97 FURNISH PRECAST PRESTRESSED CONCRETE EA 7,500.0000 172,500.00 0.000 0.00 S) GIRDER (15 M - 20 M) 98 FURNISH PRECAST PRESTRESSED CONCRETE EA 13,200.0000 92,400.00 0.000 0.00 S) GIRDER (20 M - 25 M) 99 FURNISH PRECAST PRESTRESSED CONCRETE EA 15,000.0000 105,000.00 0.000 0.00 S) GIRDER (25 M - 30 M) 00 ERECT PRECAST PRESTRESSED CONCRETE EA 5,000.0000 265,000.00 0.000 0.00 S) GIRDER 01 SOUND WALL (BARRIER) (MASONRY BLOCK) M2 230.0000 813,970.00 0.000 0.00 SF) 02 JOINT SEAL (MR 15 MM) M 150.0000 54,000.00 0.000 0.00 S) 03 JOINT SEAL (MR 50 MM) M 330.0000 40,260.00 0.000 0.00 S) PROGRAM CAS145 PAGE 5 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 BAR REINFORCING STEEL (BRIDGE) KG 2.5000 868,337.50 36,010.730 90,026.83 36,010.730 90,026.83 SF) 05 TREAT BRIDGE DECK M2 2.4000 14,992.80 0.000 0.00 F) 06 FURNISH BRIDGE DECK TREATMENT MATERIAL L 23.0000 57,523.00 0.000 0.00 (LOW ODOR) 07 FURNISH SIGN STRUCTURE (TRUSS) KG 6.8000 1,033,192.00 0.000 0.00 F) 08 INSTALL SIGN STRUCTURE (TRUSS) KG 1.0000 151,940.00 0.000 0.00 SF) 09 1372 MM CAST-IN-DRILLED-HOLE CONCRETE M 2,250.0000 51,750.00 0.000 0.00 S) PILE (SIGN FOUNDATION) 10 METAL (BARRIER MOUNTED SIGN) EA 1,000.0000 4,000.00 0.000 0.00 11 ROADSIDE SIGN - ONE POST EA 250.0000 2,500.00 0.000 0.00 12 ROADSIDE SIGN - TWO POST EA 500.0000 3,000.00 0.000 0.00 13 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 100.0000 700.00 0.000 0.00 METHOD) 14 INSTALL SIGN PANEL ON EXISTING FRAME M2 170.0000 16,830.00 0.000 0.00 15 INSTALL ROADSIDE SIGN EA 2,500.0000 2,500.00 0.000 0.00 (LAMINATED WOOD BOX POST) 16 450 MM ALTERNATIVE PIPE CULVERT M 175.0000 38,500.00 0.000 0.00 17 600 MM ALTERNATIVE PIPE CULVERT M 250.0000 220,000.00 0.000 0.00 18 300 MM REINFORCED CONCRETE PIPE M 500.0000 1,500.00 0.000 0.00 19 450 MM REINFORCED CONCRETE PIPE M 195.0000 42,900.00 0.000 0.00 (CLASS III, RUBBER GASKET JOINT) 20 600 MM REINFORCED CONCRETE PIPE M 275.0000 4,400.00 0.000 0.00 (CLASS III, RUBBER GASKET JOINT) 21 JACKED 600 MM REINFORCED CONCRETE PIPE M 2,100.0000 140,700.00 0.000 0.00 (CLASS III, RUBBER GASKET JOINT) 22 300 MM CORRUGATED STEEL PIPE M 700.0000 26,600.00 0.000 0.00 (2.01 MM THICK) 23 450 MM CORRUGATED STEEL PIPE M 550.0000 6,050.00 0.000 0.00 (2.01 MM THICK) 24 600 MM CORRUGATED STEEL PIPE M 630.0000 18,270.00 0.000 0.00 (2.01 MM THICK) 25 750 MM CORRUGATED STEEL PIPE M 1,350.0000 4,050.00 0.000 0.00 (2.01 MM THICK) 26 300 MM CORRUGATED STEEL PIPE DOWNDRAIN M 365.0000 80,300.00 0.000 0.00 (2.01 MM THICK) 27 250 MM CORRUGATED STEEL FLUME DOWNDRAIN M 530.0000 28,090.00 0.000 0.00 28 ENTRANCE TAPER EA 500.0000 4,500.00 0.000 0.00 29 TAPERED INLET EA 500.0000 4,500.00 0.000 0.00 30 ANCHOR ASSEMBLY EA 180.0000 21,600.00 0.000 0.00 PROGRAM CAS145 PAGE 6 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 31 900 MM CORRUGATED STEEL PIPE INLET M 900.0000 10,800.00 0.000 0.00 (2.01 MM THICK) 32 300 MM CORRUGATED STEEL PIPE RISER M 1,550.0000 6,045.00 0.000 0.00 (2.01 MM THICK) 33 450 MM ALTERNATIVE FLARED END SECTION EA 500.0000 1,500.00 0.000 0.00 34 600 MM ALTERNATIVE FLARED END SECTION EA 550.0000 4,950.00 0.000 0.00 35 900 MM PRECAST CONCRETE PIPE INLET M 1,300.0000 7,800.00 0.000 0.00 36 MANHOLE EA 7,500.0000 15,000.00 0.000 0.00 37 ROCK SLOPE PROTECTION M3 475.0000 12,825.00 0.000 0.00 (BACKING NO. 2, METHOD B) 38 SLOPE PAVING (CONCRETE) M3 720.0000 133,200.00 0.000 0.00 F) 39 ROCK SLOPE PROTECTION FABRIC M2 15.0000 2,550.00 0.000 0.00 40 MINOR CONCRETE (MISCELLANEOUS M3 705.0000 267,900.00 0.000 0.00 CONSTRUCTION) 41 MINOR CONCRETE (TEXTURED PAVING) M3 800.0000 248,000.00 0.000 0.00 42 MISCELLANEOUS IRON AND STEEL KG 6.0000 81,006.00 0.000 0.00 SF) 43 MISCELLANEOUS METAL (BRIDGE) KG 40.0000 28,800.00 0.000 0.00 SF) 44 CHAIN LINK FENCE (TYPE CL-1.8) M 50.0000 4,700.00 0.000 0.00 S) 45 CHAIN LINK FENCE (TYPE CL-2.4) M 54.0000 68,580.00 0.000 0.00 S) 46 SURVEY MONUMENT EA 600.0000 21,000.00 0.000 0.00 47 DELINEATOR (CLASS 1) EA 36.0000 360.00 0.000 0.00 48 OBJECT MARKER (TYPE P) EA 40.0000 40.00 0.000 0.00 49 OBJECT MARKER (TYPE L-1) EA 40.0000 280.00 0.000 0.00 50 METAL BEAM GUARD RAILING (STEEL POST) M 60.0000 5,040.00 0.000 0.00 S) 51 TRANSITION RAILING (TYPE WB) EA 1,500.0000 15,000.00 0.000 0.00 S) 52 END SECTION EA 250.0000 2,000.00 0.000 0.00 S) 53 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 1,000.0000 22,000.00 0.000 0.00 S) 54 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 1,000.0000 8,000.00 0.000 0.00 S) 55 ALTERNATIVE FLARED TERMINAL SYSTEM EA 1,000.0000 17,000.00 0.000 0.00 S) 56 CONCRETE BARRIER (TYPE 60) M 135.0000 1,240,650.00 0.000 0.00 57 CONCRETE BARRIER (TYPE 60C) M 610.0000 359,900.00 0.000 0.00 PROGRAM CAS145 PAGE 7 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 58 CONCRETE BARRIER (TYPE 60R) M 450.0000 67,500.00 0.000 0.00 59 CONCRETE BARRIER (TYPE 736) M 270.0000 159,300.00 0.000 0.00 F) 60 CONCRETE BARRIER (TYPE 736SV) M 560.0000 1,747,200.00 0.000 0.00 61 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 62 THERMOPLASTIC PAVEMENT MARKING M2 40.0000 14,800.00 0.000 0.00 S) 63 THERMOPLASTIC TRAFFIC STRIPE M 0.6500 36,530.00 0.000 0.00 S) (SPRAYABLE) 64 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.0000 8,340.00 0.000 0.00 S) 65 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6500 27,820.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 66 PAINT TRAFFIC STRIPE (2-COAT) M 0.4000 53,200.00 355.000 142.00 3,301.000 1,320.40 S) 67 PAINT PAVEMENT MARKING M2 40.0000 960.00 19.500 780.00 39.540 1,581.60 S) 68 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 55,600.00 33.000 132.00 S) 69 TRAFFIC MONITORING STATION (LOCATION 1) LS 40,000.0000 40,000.00 0.000 0.00 S) 70 TRAFFIC MONITORING STATION (LOCATION 2) LS 50,000.0000 50,000.00 0.135 6,750.00 0.135 6,750.00 S) 71 CLOSED CIRCUIT TELEVISION SYSTEM LS 40,000.0000 40,000.00 0.211 8,440.00 0.211 8,440.00 S) 72 MODIFY LIGHTING AND SIGN ILLUMINATION LS 570,000.0000 570,000.00 0.089 50,730.00 0.138 78,660.00 S) 73 MODIFY ROADSIDE WEATHER INFORMATION LS 12,000.0000 12,000.00 0.000 0.00 S) SYSTEM 74 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 75 1524 MM CAST-IN-DRILLED-HOLE M 3,000.0000 360,000.00 0.000 0.00 S) CONCRETE PILE (SIGN FOUNDATION) PROGRAM CAS145 PAGE 8 DATE 04/24/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350704 TIME 10:50 AM ESTIMATE NO. 03 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: WOODS, JOHN A DATE OF THIS ESTIMATE 04/24/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 827,622.32 1,493,268.56 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 8,839.24 13,522.24 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 836,461.56 1,506,790.80 76 MOBILIZATION LS 5668,000.0000 5,668,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 57,672,520.30 TOTAL WORK COMPLETED 836,461.56 1,506,790.80 MATERIALS ON HAND ON SITE 43,093.25 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -10,000.00 -10,000.00 TOTAL 826,461.56 1,539,884.05 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE PROGRAM N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/13/05 320 12/27/05 04/06/06 07/16/07 11 33 0 31 3% 8% PROGRESS IS SATISFACTORY WOODS, JOHN A RESIDENT ENGINEER PROGRAM CAS145 PAGE 7 DATE 04/24/06