PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/22/11 EST. NO.11 TIME 01:03 PM R.E. NAME: VONG, ALAN 06-350714 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/22/11 EST. NO.11 TIME 01:03 PM R.E. NAME: VONG, ALAN 06-350714 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350714 TIME 01:03 PM ESTIMATE NO. 11 BID OPENING 12/09/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/11 R.E. NAME: VONG, ALAN DATE OF THIS ESTIMATE 03/22/11 LOCATION PROGRESS ESTIMATE 06-FRE-99-R1.0/7.4 ----------------- WATKIN & BORTOLUSSSI INC IN FRESNO CO IN AND NEAR KINGSBURG 77 LARKSPUR STREET AND SELMA FROM ROUTE 99/201 SAN RAFAEL CA 94901 SEPARATION TO NORTH OF FLORAL AVENUE UNDERCROSSING FED. AID NO. N O N E PERFORM HIGHWAY PLANTING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 SMALL BUSINESS UTILIZATION REPORT EA 250.0000 1,000.00 0.170 42.50 02 CONSTRUCTION SITE MANAGEMENT LS 4,000.0000 4,000.00 1.000 4,000.00 03 PREPARE STORM WATER POLLUTION LS 1,500.0000 1,500.00 1.000 1,500.00 PREVENTION PLAN 04 TEMPORARY FIBER ROLL LF 2.2500 15,030.00 950.000 2,137.50 05 TEMPORARY DRAINAGE INLET PROTECTION EA 250.0000 500.00 7.000 1,750.00 06 STREET SWEEPING LS 1,750.0000 1,750.00 1.000 1,750.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) EA 1,000.0000 1,000.00 0.000 0.00 08 CONSTRUCTION AREA SIGNS LS 3,500.0000 3,500.00 0.940 3,290.00 09 TRAFFIC CONTROL SYSTEM LS 4,250.0000 4,250.00 1.000 4,250.00 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 600.0000 600.00 1.000 600.00 11 REMOVE ASPHALT CONCRETE DIKE LF 10.0000 860.00 0.000 0.00 12 LEAD COMPLIANCE PLAN LS 1,200.0000 1,200.00 1.000 1,200.00 13 ROADSIDE CLEARING LS 14,779.0000 14,779.00 1.000 14,779.00 14 SOIL AMENDMENT CY 72.0000 792.00 10.300 741.60 15 MULCH CY 31.0000 27,900.00 800.000 24,800.00 16 COMMERCIAL FERTILIZER LB 0.1000 17.00 0.170 0.02 17 COMMERCIAL FERTILIZER (PACKET) EA 0.2500 237.50 893.000 223.25 18 PLANT (GROUP H) EA 0.3500 17,290.00 29,187.000 10,215.45 19 PLANT (GROUP A) EA 10.0000 4,100.00 307.000 3,070.00 20 PLANT (GROUP B) EA 20.0000 3,600.00 170.000 3,400.00 21 PLANT (GROUP U) EA 70.0000 140.00 2.000 140.00 22 WILD FLOWER SEEDING SQYD 0.4500 8,145.00 13,889.000 6,250.05 PROGRAM CAS145 PAGE 2 DATE 03/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350714 TIME 01:03 PM ESTIMATE NO. 11 BID OPENING 12/09/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/11 R.E. NAME: VONG, ALAN DATE OF THIS ESTIMATE 03/22/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MAINTAIN EXISTING PLANTED AREAS LS 16,000.0000 16,000.00 1.000 16,000.00 24 PLANT ESTABLISHMENT WORK LS 136,243.0000 136,243.00 0.025 3,406.08 0.191 26,022.41 25 MAINTAIN EXISTING IRRIGATION FACILITIES LS 8,000.0000 8,000.00 1.000 8,000.00 26 CONTROL AND NEUTRAL CONDUCTORS LS 21,000.0000 21,000.00 1.000 21,000.00 27 COMMUNICATION CABLE LF 5.0000 100.00 5.000 25.00 28 1 1/2" ELECTRIC REMOTE CONTROL VALVE EA 235.0000 4,700.00 17.000 3,995.00 29 2" ELECTRIC REMOTE CONTROL VALVE EA 270.0000 270.00 1.000 270.00 30 24 STATION IRRIGATION CONTROLLER EA 8,500.0000 8,500.00 1.000 8,500.00 (WALL MOUNTED) 31 24 STATION IRRIGATION CONTROLLER EA 15,600.0000 15,600.00 1.000 15,600.00 (WALL MOUNTED WITH CABINET) 32 GROUNDING PACKAGE EA 150.0000 150.00 1.000 150.00 33 FLOW SENSOR EA 650.0000 650.00 1.000 650.00 34 3/4" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 2.2500 17,046.00 6,254.000 14,071.50 F) 35 1" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 2.2500 4,324.50 1,598.000 3,595.50 F) 36 1 1/4" PLASTIC PIPE (PR 200) LF 2.2500 3,735.00 1,517.000 3,413.25 F) (SUPPLY LINE) 37 1 1/2" PLASTIC PIPE (PR 200) LF 2.2500 2,391.75 714.000 1,606.50 F) (SUPPLY LINE) 38 2" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 2.5000 650.00 180.000 450.00 F) 39 2 1/2" PLASTIC PIPE (PR 200) LF 2.5000 1,300.00 520.000 1,300.00 F) (SUPPLY LINE) 40 3" PLASTIC PIPE (PR 200) (SUPPLY LINE) LF 2.5000 5,237.50 194.000 485.00 F) 41 3" PLASTIC PIPE (PR 315) (SUPPLY LINE) LF 2.7500 165.00 60.000 165.00 F) 42 SPRINKLER (TYPE A-1) EA 58.0000 2,900.00 36.000 2,088.00 43 SPRINKLER (TYPE B-1) EA 25.0000 200.00 0.000 0.00 44 SPRINKLER (TYPE B-2) EA 33.0000 891.00 12.000 396.00 45 SPRINKLER (TYPE B-5) EA 26.0000 6,240.00 193.000 5,018.00 46 SPRINKLER (TYPE B-6) EA 33.0000 2,046.00 48.000 1,584.00 47 SPRINKLER (TYPE C-3) EA 23.0000 6,900.00 298.000 6,854.00 48 FILTER ASSEMBLY UNIT EA 275.0000 825.00 5.000 1,375.00 49 3" GATE VALVE EA 400.0000 800.00 4.000 1,600.00 PROGRAM CAS145 PAGE 3 DATE 03/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350714 TIME 01:03 PM ESTIMATE NO. 11 BID OPENING 12/09/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/11 R.E. NAME: VONG, ALAN DATE OF THIS ESTIMATE 03/22/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 PRESSURE REDUCING VALVE EA 550.0000 550.00 1.000 550.00 51 BALL VALVE EA 300.0000 2,700.00 8.000 2,400.00 52 BOOSTER PUMP SYSTEM EA 15,650.0000 15,650.00 1.000 15,650.00 53 PLACE ASPHALT CONCRETE DIKE (TYPE E) LF 50.0000 3,800.00 0.000 0.00 54 ROADSIDE PAVING (MISCELLANEOUS AREAS) SQYD 80.0000 9,600.00 150.000 12,000.00 55 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 500.0000 500.00 1.000 500.00 SYSTEM ELEMENTS DURING CONSTRUCTION 56 ELECTRIC SERVICE (IRRIGATION) LS 18,000.0000 18,000.00 1.000 18,000.00 57 BOOSTER PUMP ELECTRICAL SYSTEM LS 9,000.0000 9,000.00 0.509 4,581.00 PROGRAM CAS145 PAGE 4 DATE 03/22/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-350714 TIME 01:03 PM ESTIMATE NO. 11 BID OPENING 12/09/09 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/11 R.E. NAME: VONG, ALAN DATE OF THIS ESTIMATE 03/22/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 3,406.08 282,034.53 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 4,791.45 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 3,406.08 286,825.98 58 MOBILIZATION LS 48,000.0000 48,000.00 1.000 48,000.00 ORIGINAL CONTRACT AMOUNT 486,855.25 TOTAL WORK COMPLETED 3,406.08 334,825.98 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 3,406.08 334,825.98 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/19/10 905 03/15/10 03/15/10 10/25/13 254 3 13 0 67% 28% PROGRESS IS SATISFACTORY VONG, ALAN RESIDENT ENGINEER PROGRAM CAS145 DATE 03/22/11