PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/23/13 EST. NO.12 TIME 07:29 AM R.E. NAME: HAIDAR HADDADIN 06-416004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0062 690.16 E.W. @ F.A.(+) 062813 N 0132.0 0071 1,100.00 071613 N 0160.0 0072 2,200.00 071813 N 0161.0 0073 880.00 072313 N 0162.0 0075 857.21 080513 N 0168.0 0076 846.13 080613 N 0169.0 0077 184.15 080713 N 0170.0 0078 1,164.23 080813 N 0171.0 0079 645.13 080913 N 0172.0 0080 508.09 081213 N 0173.0 0081 612.55 081313 N 0174.0 0082 731.14 081413 N 0175.0 0083 942.33 081513 N 0176.0 0084 546.58 081613 N 0177.0 0085 608.84 073113 N 0163.1 0086 3,964.38 072813 N 0166.0 0087 3,219.63 072913 N 0167.0 003 0029 3,125.35 E.W. @ F.A.(+) 070913 N 0179.0 0030 7,240.77 071013 N 0180.0 0031 7,212.92 071113 N 0181.0 0032 2,341.53 072413 N 0183.0 0033 1,706.34 072513 N 0184.0 0034 3,487.25 072613 N 0185.0 009 0001 1,314.23 E.W. @ F.A.(+) 062013 N 0153.0 0003 52,772.37 062413 N 0155.0 0004 47,377.92 062413 N 0156.0 0005 9,675.55 062513 N 0157.0 0006 42,716.49 062513 N 0158.0 011 0001 621.30 E.W. @ F.A.(+) 072813 N 0166.1 0002 473.12 072913 N 0167.1 0003 256.10 072513 N 0194.0 0004 671.06 072613 N 0195.0 200,692.85 TOTAL THIS ESTIMATE 492,364.97 TOTAL PREVIOUS ESTIMATE 693,057.82 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/23/13 EST. NO.12 TIME 07:29 AM R.E. NAME: HAIDAR HADDADIN 06-416004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE FAILED SIEVE SAMPLES -2,250.00 10 JMF -3,000.00 10 0.00 -5,250.00 LABOR COMPLIANCE VIOLATION MISS PYRL -5,000.00 11 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -10,250.00 PROGRAM CAS145 PAGE 1 DATE 09/23/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-416004 TIME 07:29 AM ESTIMATE NO. 12 BID OPENING 03/20/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: HAIDAR HADDADIN DATE OF THIS ESTIMATE 09/23/13 LOCATION PROGRESS ESTIMATE 06-KIN-41-R42.1/R44.9 ----------------- TEICHERT CONSTRUCTION IN KINGS COUNTY NEAR LEMOORE FROM 4401 DULUTH AVE 0.1 MILE SOUTH OF HANDFORD-ARMONA ROSEVILLE CA 95678 ROAD TO 0.7 MILE NORTH OF GRANGEVILLE BOULEVARD FED. AID NO. NH-P041(122)E REHAB ROADWAY AND WIDEN SHOULDERS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 2,600.0000 2,600.00 0.750 1,950 002 TIME-RELATED OVERHEAD WDAY 140.0000 30,800.00 21.000 2,940.00 190.000 26,600 003 TEMPORARY FENCE (TYPE ESA) LF 6.5000 1,040.00 160.000 1,040 004 CONSTRUCTION SITE MANAGEMENT LS 13,000.0000 13,000.00 0.190 2,470.00 0.860 11,180 005 PREPARE STORM WATER POLLUTION LS 1,795.0000 1,795.00 0.038 68.21 0.845 1,516 PREVENTION PLAN 006 TEMPORARY FIBER ROLL LF 2.5000 97,000.00 15,650.000 39,125 007 TEMPORARY SILT FENCE LF 9.0000 639.00 0.000 0 008 TEMPORARY CONSTRUCTION ENTRANCE EA 4,300.0000 17,200.00 4.000 17,200 009 TEMPORARY CHECK DAM LF 53.0000 17,490.00 0.000 0 010 TEMPORARY DRAINAGE INLET PROTECTION EA 170.0000 4,420.00 16.000 2,720 011 STREET SWEEPING LS 25,000.0000 25,000.00 0.768 19,200 012 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 4,800.0000 4,800.00 0.500 2,400 013 TEMPORARY SOIL BINDER SQYD 0.1800 12,690.00 0.000 0 014 STORM WATER ANNUAL REPORT EA 2,000.0000 4,000.00 1.000 2,000 015 CONSTRUCTION AREA SIGNS LS 28,500.0000 28,500.00 0.800 22,800 016 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.092 4,600.00 0.860 43,000 017 TYPE III BARRICADE EA 70.0000 2,730.00 10.000 700.00 39.000 2,730 018 TEMPORARY PAVEMENT MARKING (PAINT) SQFT 2.0000 5,620.00 252.000 504.00 1,134.000 2,268 019 TEMPORARY TRAFFIC STRIPE (PAINT) LF 0.3000 15,990.00 1,465.000 439.50 32,161.000 9,648 020 CHANNELIZER (SURFACE MOUNTED) EA 25.0000 30,000.00 69.000 1,725.00 834.000 20,850 021 TEMPORARY PAVEMENT MARKER EA 3.0000 6,450.00 1,730.000 5,190 022 PORTABLE CHANGEABLE MESSAGE SIGN LS 22,000.0000 22,000.00 0.096 2,112.00 0.864 19,008 PROGRAM CAS145 PAGE 2 DATE 09/23/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-416004 TIME 07:29 AM ESTIMATE NO. 12 BID OPENING 03/20/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: HAIDAR HADDADIN DATE OF THIS ESTIMATE 09/23/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY RAILING (TYPE K) LF 14.0000 33,180.00 940.000 13,160 024 TEMPORARY CRASH CUSHION MODULE EA 246.0000 3,444.00 4.000 984.00 14.000 3,444 025 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.2000 21,960.00 15,744.000 18,892 STRIPE (HAZARDOUS WASTE) 026 OBLITERATE SURFACING SQYD 1.3000 69,680.00 61,696.000 80,204 027 REMOVE METAL BEAM GUARD RAILING LF 7.0000 7,560.00 1,062.500 7,437 028 REMOVE FLARED END SECTION EA 300.0000 1,200.00 6.000 1,800 029 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 5,790.00 4,318.000 1,295 030 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 2,850.00 456.000 1,368 031 REMOVE PAVEMENT MARKER EA 1.0000 580.00 1,872.000 1,872 032 REMOVE ROADSIDE SIGN EA 76.0000 608.00 0.000 0 033 REMOVE PIPE LF 24.0000 9,360.00 168.500 4,044 034 REMOVE INLET EA 960.0000 8,640.00 2.000 1,920 035 REMOVE HEADWALL EA 1,800.0000 1,800.00 1.000 1,800 036 RESET MAILBOX EA 165.0000 165.00 0.000 0 037 RELOCATE ROADSIDE SIGN EA 200.0000 4,600.00 0.000 0 038 REMOVE CONCRETE CY 135.0000 1,755.00 0.000 0 039 SHATTER CONCRETE SQYD 2.0000 8,380.00 4,190.000 8,380 040 CLEARING AND GRUBBING LS 23,000.0000 23,000.00 1.000 23,000 041 ROADWAY EXCAVATION CY 13.5000 341,550.00 24,000.000 324,000 042 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.300 450 043 IMPORTED BORROW CY 5.0000 287,000.00 57,000.000 285,000 044 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 500.0000 3,000.00 0.000 0 045 EROSION CONTROL (HYDROSEED) (SQFT) SQFT 0.0600 38,040.00 0.000 0 046 CLASS 2 AGGREGATE BASE CY 28.0000 893,200.00 31,330.000 877,240 047 HOT MIX ASPHALT TON 75.0000 2,752,500.00 1,544.650 115,848.75 32,435.830 2,432,687 048 DATA CORE LS 4,000.0000 4,000.00 1.000 4,000.00 1.000 4,000 049 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 27.0000 2,160.00 0.000 0 PROGRAM CAS145 PAGE 3 DATE 09/23/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-416004 TIME 07:29 AM ESTIMATE NO. 12 BID OPENING 03/20/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: HAIDAR HADDADIN DATE OF THIS ESTIMATE 09/23/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 PLACE HOT MIX ASPHALT SQYD 9.0000 30,240.00 0.000 0 (MISCELLANEOUS AREA) 051 TACK COAT TON 100.0000 3,400.00 4.030 403.00 17.780 1,778 052 PAVEMENT TRANSITION TAPER SQYD 45.0000 6,750.00 80.000 3,600 053 MINOR CONCRETE (MINOR STRUCTURE) CY 3,350.0000 74,035.00 4.530 15,175.50 15.830 53,030 (F) 054 FURNISH SIGN STRUCTURE (TRUSS) LB 3.3500 56,551.35 0.000 0 (F) 055 INSTALL SIGN STRUCTURE (TRUSS) LB 0.5000 8,440.50 0.000 0 (F) 056 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 10.0000 1,100.00 0.000 0 (0.080"-UNFRAMED) 057 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 700.0000 15,400.00 0.000 0 (SIGN FOUNDATION) 058 ROADSIDE SIGN - ONE POST EA 35.0000 175.00 0.000 0 059 18" REINFORCED CONCRETE PIPE LF 40.0000 76,800.00 1,863.700 74,548 060 24" REINFORCED CONCRETE PIPE LF 55.0000 43,450.00 404.100 22,225 061 JACKED 24" REINFORCED CONCRETE PIPE LF 415.0000 58,100.00 0.000 0 (CLASS V) 062 18" CONCRETE FLARED END SECTION EA 800.0000 36,800.00 46.000 36,800 063 24" CONCRETE FLARED END SECTION EA 1,000.0000 3,000.00 3.000 3,000 064 36" PRECAST CONCRETE PIPE INLET LF 55.0000 2,420.00 22.810 1,254 065 ROCK SLOPE PROTECTION (LIGHT, METHOD B) CY 160.0000 7,840.00 0.000 0 066 ROCK SLOPE PROTECTION CY 220.0000 5,500.00 0.000 0 (NO. 3, METHOD B) 067 ROCK SLOPE PROTECTION FABRIC SQYD 16.5000 2,145.00 0.000 0 068 MINOR CONCRETE (CURB, SIDEWALK AND CY 1,000.0000 21,500.00 3.900 3,900 (F) CURB RAMP) 069 MISCELLANEOUS IRON AND STEEL LB 2.1000 7,459.20 1,894.000 3,977 (F) 070 DELINEATOR (CLASS 1) EA 40.0000 3,880.00 0.000 0 071 METAL BEAM GUARD RAILING (STEEL POST) LF 27.0000 6,210.00 0.000 0 072 END ANCHOR ASSEMBLY (TYPE SFT) EA 815.0000 815.00 0.000 0 073 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,550.0000 2,550.00 0.000 0 074 ALTERNATIVE CRASH CUSHION SYSTEM EA 22,000.0000 22,000.00 1.000 22,000.00 1.000 22,000 075 CONCRETE BARRIER (TYPE 60) LF 250.0000 12,000.00 48.000 12,000.00 48.000 12,000 076 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3600 29,448.00 27,471.000 9,889.56 27,471.000 9,889 PROGRAM CAS145 PAGE 4 DATE 09/23/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-416004 TIME 07:29 AM ESTIMATE NO. 12 BID OPENING 03/20/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: HAIDAR HADDADIN DATE OF THIS ESTIMATE 09/23/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 1,995.50 706.000 458.90 706.000 458 078 THERMOPLASTIC PAVEMENT MARKING SQFT 2.6500 11,395.00 1,287.000 3,410.55 1,287.000 3,410 079 PAVEMENT MARKER (RETROREFLECTIVE) EA 1.9000 2,926.00 343.000 651.70 343.000 651 080 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 5,000.0000 5,000.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION 081 CHANGEABLE MESSAGE SIGN SYSTEM LS 25,000.0000 25,000.00 0.200 5,000.00 0.500 12,500 082 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 170,000.0000 170,000.00 0.104 17,680.00 0.900 153,000 083 MODIFY SIGNAL AND LIGHTING (LOCATION 2) LS 239,000.0000 239,000.00 0.182 43,498.00 0.750 179,250 PROGRAM CAS145 PAGE 5 DATE 09/23/13 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-416004 TIME 07:29 AM ESTIMATE NO. 12 BID OPENING 03/20/12 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/13 R.E. NAME: HAIDAR HADDADIN DATE OF THIS ESTIMATE 09/23/13 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 266,558.67 4,939,696.49 ADJUSTMENT OF COMPENSATION 0.00 25,277.66 EXTRA WORK 200,692.85 667,780.16 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 467,251.52 5,632,754.31 084 MOBILIZATION LS 581,850.0000 581,850.00 1.000 581,850 ORIGINAL CONTRACT AMOUNT 6,496,441.55 TOTAL WORK COMPLETED 467,251.52 6,214,604.31 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -10,250.00 TOTAL 467,251.52 6,204,354.31 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/27/12 220 07/09/12 04/30/12 12/24/13 190 111 33 0 88% 75% PROGRESS IS SATISFACTORY HAIDAR HADDADIN RESIDENT ENGINEER PROGRAM CAS145 DATE 09/23/13