PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/15/08 EST. NO.04 TIME 12:58 PM R.E. NAME: JIM BURFORD 06-418714 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/15/08 EST. NO.04 TIME 12:58 PM R.E. NAME: JIM BURFORD 06-418714 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE MISS CEM 4401 -10,000.00 04 -10,000.00 -10,000.00 LABOR COMPLIANCE VIOLATION MISS PYRL -4,712.80 04 -4,712.80 -4,712.80 OTHER OUTSTANDING DOCUMENTS MISS CEM 2402 -10,000.00 04 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -24,712.80 -24,712.80 PROGRAM CAS145 PAGE 1 DATE 05/15/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-418714 TIME 12:58 PM ESTIMATE NO. 04 BID OPENING 01/09/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/30/08 R.E. NAME: JIM BURFORD DATE OF THIS ESTIMATE 05/15/08 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 06-KER-5-3.0/3.6 ---------------------------------- CRUCO CONSTRUTION GROUP INC. IN KERN COUNTY NEAR LEBEC FROM 0.1 2443 FOUNDRY PARK AVE KM NORTH OF CRESSEY CATTLEPASS FRESNO, CA 93706 BRIDGE TO 0.7 KM SOUTH OF LEBEC 2443 FOUNDRY PARK AVE ROAD OVERCROSSING FRESNO, CA 93706 FED. AID NO. N O N E REMOVE BRAKE INSPECTION AREA ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 3,500.0000 3,500.00 0.100 350.00 1.000 3,500.00 02 PREPARE STORM WATER POLLUTION LS 1,500.0000 1,500.00 1.000 1,500.00 S) PREVENTION PLAN 03 TEMPORARY FIBER ROLL M 7.2500 725.00 100.000 725.00 04 TEMPORARY CONSTRUCTION ENTRANCE EA 2,500.0000 2,500.00 1.000 2,500.00 05 TEMPORARY DRAINAGE INLET PROTECTION EA 500.0000 500.00 1.000 500.00 06 STREET SWEEPING LS 7,500.0000 7,500.00 0.100 750.00 1.000 7,500.00 07 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 1,500.0000 1,500.00 1.000 1,500.00 08 CONSTRUCTION AREA SIGNS LS 2,500.0000 2,500.00 0.100 250.00 1.000 2,500.00 S) 09 TRAFFIC CONTROL SYSTEM LS 25,000.0000 25,000.00 0.100 2,500.00 1.000 25,000.00 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 5,500.0000 5,500.00 0.100 550.00 1.000 5,500.00 S) 11 ABANDON INLET EA 900.0000 900.00 1.000 900.00 12 ABANDON WATER WELL EA 1,500.0000 6,000.00 4.000 6,000.00 13 REMOVE FENCE (TYPE BW) M 50.0000 1,500.00 30.000 1,500.00 14 REMOVE ROADSIDE SIGN EA 100.0000 300.00 2.000 200.00 2.000 200.00 15 REMOVE ELECTROLIER FOUNDATION EA 1,200.0000 3,600.00 3.000 3,600.00 16 REMOVE PIPE M 325.0000 1,625.00 5.000 1,625.00 17 REMOVE INLET EA 850.0000 850.00 1.000 850.00 18 CLEARING AND GRUBBING LS 7,500.0000 7,500.00 1.000 7,500.00 19 ROADWAY EXCAVATION M3 28.0000 118,720.00 306.520 8,582.56 4,542.200 127,181.60 20 ROADWAY EXCAVATION (CONTAMINATED SOIL) M3 250.0000 17,500.00 73.500 18,375.00 21 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 22 IMPORTED BORROW M3 50.0000 142,000.00 248.110 12,405.50 3,088.110 154,405.50 PROGRAM CAS145 PAGE 2 DATE 05/15/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-418714 TIME 12:58 PM ESTIMATE NO. 04 BID OPENING 01/09/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/30/08 R.E. NAME: JIM BURFORD DATE OF THIS ESTIMATE 05/15/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 EROSION CONTROL (TYPE D) M2 1.2500 18,125.00 14,500.000 18,125.00 14,500.000 18,125.00 S) 24 ASPHALT CONCRETE TONN 525.0000 7,350.00 14.000 7,350.00 25 MINOR CONCRETE (MINOR STRUCTURE) M3 2,500.0000 3,750.00 1.500 3,750.00 F) 26 FURNISH SINGLE SHEET ALUMINUM SIGN M2 135.0000 1,215.00 9.000 1,215.00 9.000 1,215.00 (1.6 MM-UNFRAMED) 27 ROADSIDE SIGN - ONE POST EA 275.0000 2,200.00 8.000 2,200.00 8.000 2,200.00 28 FRAME AND GRATE EA 425.0000 425.00 1.000 425.00 S) 29 FENCE (TYPE BW, METAL POST) M 18.7500 11,062.50 584.000 10,950.00 S) 30 4.6 M WIRE MESH GATE EA 2,100.0000 2,100.00 1.000 2,100.00 S) PROGRAM CAS145 PAGE 3 DATE 05/15/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-418714 TIME 12:58 PM ESTIMATE NO. 04 BID OPENING 01/09/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/30/08 R.E. NAME: JIM BURFORD DATE OF THIS ESTIMATE 05/15/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 47,128.06 420,977.10 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 47,128.06 420,977.10 ORIGINAL CONTRACT AMOUNT 399,447.50 TOTAL WORK COMPLETED 47,128.06 420,977.10 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -24,712.80 -24,712.80 TOTAL 22,415.26 396,264.30 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/08/08 45 03/03/08 03/04/08 04/30/08 45 8 0 0 100% 100% JIM BURFORD RESIDENT ENGINEER PROGRAM CAS145 DATE 05/15/08