PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/08 EST. NO.18 TIME 06:57 AM R.E. NAME: SAMIMI, MOHAMMAD 06-431804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0042 682.88 E.W. @ F.A.(+) 061608 N 0042 0 0043 682.88 061808 N 0043 0 0044 682.88 062608 N 0044 0 0045 341.44 070308 N 0045 0 0046 341.44 070708 N 0046 0 0047 682.88 072108 N 0047 0 0048 682.88 072208 N 0048 0 4,097.28 TOTAL THIS ESTIMATE 154,046.55 TOTAL PREVIOUS ESTIMATE 158,143.83 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/08 EST. NO.18 TIME 06:57 AM R.E. NAME: SAMIMI, MOHAMMAD 06-431804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 03 MISS PYRL -10,000.00 04 RECD PYRL #3 & 4 20,000.00 05 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-431804 TIME 06:57 AM ESTIMATE NO. 18 BID OPENING 01/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: SAMIMI, MOHAMMAD DATE OF THIS ESTIMATE 08/22/08 LOCATION PROGRESS ESTIMATE 06-FRE-41-R22.5/R25.6 ----------------- 06-FRE-180-R58.3/R59.0 GOLD VALLEY CONSTRUCTION INC. IN FRESNO COUNTY IN FRESNO AT P.O. BOX 1535 VARIOUS LOCATIONS ROCKLIN, CA 95677 FED. AID NO. ACNH-X019(20)E PLANTING AND IRRIGATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 3,750.0000 3,750.00 0.750 2,812.50 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 50,000.0000 50,000.00 0.950 47,500.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,000.0000 2,000.00 2.000 2,000.00 04 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.960 14,400.00 S) 05 TRAFFIC CONTROL SYSTEM LS 275,000.0000 275,000.00 1.000 275,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 80,000.0000 80,000.00 1.000 80,000.00 S) 07 REMOVE ROADSIDE SIGN EA 200.0000 800.00 0.000 0.00 08 ROADWAY EXCAVATION M3 115.0000 73,600.00 570.000 65,550.00 09 ROADSIDE CLEARING LS 15,000.0000 15,000.00 1.000 15,000.00 10 PRUNE EXISTING PLANTS LS 10,000.0000 10,000.00 1.000 10,000.00 11 SOIL AMENDMENT M3 280.0000 13,160.00 47.000 13,160.00 12 MULCH M3 110.0000 19,800.00 180.000 19,800.00 13 COMMERCIAL FERTILIZER (PACKET) EA 0.2500 2,475.00 9,900.000 2,475.00 14 FIBER (EROSION CONTROL) KG 3.0000 4,500.00 0.000 0.00 15 STABILIZING EMULSION (EROSION CONTROL) KG 6.7500 6,750.00 0.000 0.00 16 PLANT (GROUP H) EA 2.0000 18,360.00 9,180.000 18,360.00 17 PLANT (GROUP A) EA 15.0000 51,450.00 3,430.000 51,450.00 18 PLANT (GROUP B) EA 50.0000 12,000.00 240.000 12,000.00 19 PLANT ESTABLISHMENT WORK LS 300,000.0000 300,000.00 0.080 24,000.00 0.480 144,000.00 20 MAINTAIN EXISTING IRRIGATION FACILITIES LS 50,000.0000 50,000.00 0.040 2,000.00 0.700 35,000.00 21 CONTROL AND NEUTRAL CONDUCTORS (ARMOR LS 385,000.0000 385,000.00 1.000 385,000.00 CLAD) 22 32 MM ELECTRIC REMOTE CONTROL VALVE EA 540.0000 2,160.00 4.000 2,160.00 PROGRAM CAS145 PAGE 2 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-431804 TIME 06:57 AM ESTIMATE NO. 18 BID OPENING 01/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: SAMIMI, MOHAMMAD DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 40 MM ELECTRIC REMOTE CONTROL VALVE EA 350.0000 34,650.00 99.000 34,650.00 24 50 MM ELECTRIC REMOTE CONTROL VALVE EA 375.0000 93,750.00 251.000 94,125.00 25 50 MM PRESSURE REDUCING VALVE EA 1,225.0000 3,675.00 3.000 3,675.00 26 40 MM FILTER ASSEMBLY UNIT EA 652.0000 9,780.00 15.000 9,780.00 27 50 MM FLOW SENSOR EA 1,600.0000 12,800.00 8.000 12,800.00 28 COMMUNICATION CABLE LS 1,000.0000 1,000.00 1.000 1,000.00 29 GROUNDING PACKAGE LS 5,000.0000 5,000.00 1.000 5,000.00 30 DOUBLE IRRIGATION CONTROLLER EA 30,000.0000 90,000.00 3.000 90,000.00 31 20 MM PLASTIC PIPE (PR 200) M 6.5000 46,579.00 7,166.000 46,579.00 F) (SUPPLY LINE) 32 25 MM PLASTIC PIPE (PR 200) M 7.2500 74,783.75 10,315.000 74,783.75 F) (SUPPLY LINE) 33 32 MM PLASTIC PIPE (PR 200) M 7.5000 64,927.50 8,657.000 64,927.50 F) (SUPPLY LINE) 34 40 MM PLASTIC PIPE (PR 200) M 8.5000 36,915.50 4,343.000 36,915.50 F) (SUPPLY LINE) 35 50 MM PLASTIC PIPE (PR 200) M 9.2500 243,978.00 26,376.000 243,978.00 F) (SUPPLY LINE) 36 65 MM PLASTIC PIPE (PR 200) M 11.5000 33,580.00 2,920.000 33,580.00 F) (SUPPLY LINE) 37 75 MM PLASTIC PIPE (PR 200) M 20.0000 48,000.00 2,400.000 48,000.00 F) (SUPPLY LINE) 38 100 MM PLASTIC PIPE (PR 200) M 23.0000 20,493.00 891.000 20,493.00 F) (SUPPLY LINE) 39 75 MM PLASTIC PIPE (PR 315) M 30.0000 2,970.00 170.000 5,100.00 F) (SUPPLY LINE) 40 WATER METER EA 2,000.0000 6,000.00 3.000 6,000.00 41 BACKFLOW PREVENTER ASSEMBLY ENCLOSURE EA 2,200.0000 6,600.00 3.000 6,600.00 42 50 MM BACKFLOW PREVENTER ASSEMBLY EA 1,750.0000 5,250.00 3.000 5,250.00 43 SPRINKLER (TYPE A-1) EA 75.0000 69,000.00 913.000 68,475.00 44 SPRINKLER (TYPE A-3) EA 70.0000 69,300.00 984.000 68,880.00 45 SPRINKLER (TYPE B-1) EA 20.0000 13,800.00 683.000 13,660.00 46 SPRINKLER (TYPE C-3) EA 25.0000 33,750.00 1,345.000 33,625.00 47 50 MM GATE VALVE EA 250.0000 1,000.00 4.000 1,000.00 48 75 MM GATE VALVE EA 600.0000 18,600.00 31.000 18,600.00 49 CHECK VALVE EA 80.0000 10,400.00 127.000 10,160.00 PROGRAM CAS145 PAGE 3 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-431804 TIME 06:57 AM ESTIMATE NO. 18 BID OPENING 01/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: SAMIMI, MOHAMMAD DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 50 MM BALL VALVE EA 200.0000 9,000.00 61.000 12,200.00 51 40 MM BALL VALVE EA 200.0000 600.00 3.000 600.00 52 200 MM WELDED STEEL PIPE CONDUIT M 500.0000 49,500.00 97.670 48,835.00 (6.35 MM THICK) 53 BOOSTER PUMP SYSTEM EA 15,000.0000 45,000.00 3.000 45,000.00 54 MAINTENANCE VEHICLE PULLOUT EA 20,000.0000 20,000.00 1.000 20,000.00 55 ROADSIDE SIGN - ONE POST EA 350.0000 1,400.00 0.000 0.00 56 MINOR CONCRETE (TEXTURED PAVING) M3 950.0000 275,500.00 256.000 243,200.00 S) 57 ELECTRIC SERVICE (IRRIGATION) LS 133,000.0000 133,000.00 1.000 133,000.00 S) 58 BOOSTER PUMP ELECTRICAL SYSTEM LS 2,000.0000 2,000.00 1.000 2,000.00 S) 59 MODIFY RAMP METERING SYSTEM LS 11,000.0000 11,000.00 1.000 11,000.00 S) PROGRAM CAS145 PAGE 4 DATE 08/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-431804 TIME 06:57 AM ESTIMATE NO. 18 BID OPENING 01/03/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/08 R.E. NAME: SAMIMI, MOHAMMAD DATE OF THIS ESTIMATE 08/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 26,000.00 2,769,139.25 ADJUSTMENT OF COMPENSATION 0.00 1,845.35 EXTRA WORK 4,097.28 156,298.48 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 30,097.28 2,927,283.08 60 MOBILIZATION LS 326,000.0000 326,000.00 1.000 326,000.00 ORIGINAL CONTRACT AMOUNT 3,320,386.75 TOTAL WORK COMPLETED 30,097.28 3,253,283.08 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 30,097.28 3,253,283.08 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/09/07 610 02/26/07 02/26/07 08/19/08 362 11 0 0 PLANT ESTABLISHMENT PERI PROGRESS IS SATISFACTORY SAMIMI, MOHAMMAD RESIDENT ENGINEER PROGRAM CAS145 PAGE 24 DATE 08/22/08