PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/23/08 EST. NO.03 TIME 06:15 AM R.E. NAME: RIZWAN TANVIR 06-432004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 394.43 E.W. @ F.A.(+) 012308 N 002 0 0003 394.43 012408 N 3 0 0004 394.43 012508 N 4 0 0006 394.43 012708 N 6 0 0007 394.43 012808 N 360419 0009 394.43 012608 N 9 0 2,366.58 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 2,366.58 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/23/08 EST. NO.03 TIME 06:15 AM R.E. NAME: RIZWAN TANVIR 06-432004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-432004 TIME 06:15 AM ESTIMATE NO. 03 BID OPENING 11/28/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/23/08 LOCATION RERUN PROGRESS ESTIMATE 06-TUL-99-51.9/ .0 ----------------------- GRANITE CONSTRUCTION COMPANY IN TULARE COUNTY NEAR KINGSBURG AT 2716 GRANITE COURT DODGE AVENUE AT WARLOW SAFETY FRESNO, CA 93706 ROADSIDE REST AREA FED. AID NO. ACST-P099(497)E ,PHG-P099(497)E RECONSTRUCT SAFETY ROADSIDE REST ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE ESA) LF 5.0000 3,550.00 956.000 4,780.00 S) 02 CONSTRUCTION SITE MANAGEMENT LS 2,000.0000 2,000.00 0.086 172.00 0.247 494.00 03 PREPARE WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 0.750 2,250.00 PROGRAM 04 TEMPORARY FIBER ROLL LF 5.0000 5,900.00 1,121.000 5,605.00 05 TEMPORARY CONCRETE WASHOUT FACILITY EA 4,000.0000 4,000.00 0.300 1,200.00 0.300 1,200.00 06 STREET SWEEPING LS 5,000.0000 5,000.00 0.086 430.00 0.247 1,235.00 07 CONSTRUCTION AREA SIGNS LS 4,000.0000 4,000.00 0.017 68.00 0.746 2,984.00 S) 08 TRAFFIC CONTROL SYSTEM LS 8,000.0000 8,000.00 0.086 688.00 0.247 1,976.00 S) 09 TYPE III BARRICADE EA 100.0000 600.00 6.000 600.00 S) 10 PORTABLE CHANGEABLE MESSAGE SIGN LS 1,000.0000 1,000.00 0.086 86.00 0.247 247.00 S) 11 REMOVE CHAIN LINK FABRIC LF 1.5000 5,760.00 0.000 0.00 12 REMOVE TRAFFIC STRIPE LF 2.0000 1,040.00 0.000 0.00 13 REMOVE PAVEMENT MARKING SQFT 3.0000 141.00 0.000 0.00 14 RESET ROADSIDE SIGN EA 350.0000 700.00 0.000 0.00 15 REMOVE CONCRETE CY 50.0000 13,500.00 198.730 9,936.50 16 REMOVE TRASH RECEPTACLE EA 125.0000 1,875.00 17.000 2,125.00 17 REMOVE PICNIC TABLE EA 150.0000 1,800.00 12.000 1,800.00 18 REMOVE ENTRANCE SIGN EA 300.0000 300.00 1.000 300.00 19 RELOCATE BLUE STAR MEMORIAL SIGN EA 1,500.0000 1,500.00 0.500 750.00 20 CLEARING AND GRUBBING LS 180,000.0000 180,000.00 0.950 171,000.00 21 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 0.086 86.00 0.247 247.00 22 HIGHWAY PLANTING LS 46,000.0000 46,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 04/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-432004 TIME 06:15 AM ESTIMATE NO. 03 BID OPENING 11/28/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLANT ESTABLISHMENT WORK LS 22,000.0000 22,000.00 0.000 0.00 S) 24 MAINTAIN EXISTING IRRIGATION FACILITIES LS 22,000.0000 22,000.00 0.086 1,892.00 0.247 5,434.00 S) 25 IRRIGATION SYSTEM LS 85,000.0000 85,000.00 0.078 6,630.00 0.078 6,630.00 S) 26 12" CORRUGATED HIGH DENSITY LF 45.0000 3,600.00 0.000 0.00 POLYETHYLENE PIPE CONDUIT 27 CLASS 2 AGGREGATE BASE CY 100.0000 20,000.00 0.000 0.00 28 12" X 12" DRAIN INLET EA 1,000.0000 6,000.00 3.000 3,000.00 3.000 3,000.00 29 MINOR CONCRETE (SEAT WALL) CY 3,000.0000 45,000.00 0.000 0.00 F) 30 CEDAR SPLIT RAIL ENTRANCE SIGN EA 1,500.0000 1,500.00 0.000 0.00 31 SITE SIGN EA 535.0000 1,605.00 0.000 0.00 32 INSTALL SIGN OVERLAY SQFT 7.0000 2,520.00 349.700 2,447.90 33 6" PLASTIC PIPE (DRAINLINE) LF 55.0000 9,900.00 146.000 8,030.00 146.000 8,030.00 34 3" PLASTIC PIPE (DRAINLINE) LF 45.0000 2,250.00 50.000 2,250.00 50.000 2,250.00 35 5" AREA DRAIN EA 850.0000 1,700.00 0.000 0.00 36 CHANNEL DRAIN ASSEMBLY LF 300.0000 36,000.00 0.000 0.00 37 MINOR CONCRETE (COLORED AGGREGATE) CY 2,000.0000 58,000.00 0.000 0.00 S) 38 MINOR CONCRETE (COLORED) CY 800.0000 88,000.00 0.000 0.00 S) 39 MINOR CONCRETE (STAINED) CY 1,250.0000 65,000.00 0.000 0.00 S) 40 MINOR CONCRETE (NATURAL GRAY) CY 700.0000 70,000.00 0.000 0.00 S) 41 FRAME AND GRATE EA 190.0000 1,520.00 0.000 0.00 42 WIRE MESH FENCE LF 7.0000 12,740.00 0.000 0.00 S) 43 CHAIN LINK FABRIC LF 8.0000 16,080.00 0.000 0.00 44 CEDAR SPLIT RAIL FENCE LF 125.0000 75,000.00 0.000 0.00 S) 45 16' METAL GATE EA 3,500.0000 7,000.00 2.000 7,000.00 46 PAINT TRAFFIC STRIPE (2-COAT) LF 1.0000 600.00 0.000 0.00 47 PARKING BUMPER (PRECAST CONCRETE) EA 85.0000 2,210.00 0.000 0.00 48 PRECAST CONCRETE NEWSPAPER RACK EA 2,800.0000 8,400.00 0.000 0.00 49 PRECAST CONCRETE PICNIC TABLE EA 1,800.0000 14,400.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 04/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-432004 TIME 06:15 AM ESTIMATE NO. 03 BID OPENING 11/28/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 PRECAST CONCRETE TRASH CONTAINER EA 1,300.0000 18,200.00 0.000 0.00 51 PRECAST CONCRETE RECYCLE CONTAINER EA 1,400.0000 4,200.00 0.000 0.00 52 HYDRANT EA 12,500.0000 50,000.00 2.000 25,000.00 2.000 25,000.00 S) 53 BUILDING WORK LS 1703,500.0000 1,703,500.00 0.047 80,064.50 0.143 243,600.50 PROGRAM CAS145 PAGE 4 DATE 04/23/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-432004 TIME 06:15 AM ESTIMATE NO. 03 BID OPENING 11/28/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/08 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 04/23/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 129,596.50 510,921.90 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 2,366.58 2,366.58 SUBTOTAL AMOUNT EARNED 131,963.08 513,288.48 ORIGINAL CONTRACT AMOUNT 2,744,591.00 TOTAL WORK COMPLETED 131,963.08 513,288.48 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 131,963.08 513,288.48 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/17/07 320 01/28/08 00/00/00 12/29/08 57 0 0 0 19% 25% PROGRESS IS SATISFACTORY RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 PAGE 6 DATE 04/23/08