PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/24/11 EST. NO.01 TIME 10:34 AM R.E. NAME: MARTINEZ, BLAS 06-446704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 002 0001 70,127.75 A.C. @ U.P.(+) 051911 N 1 0 70,127.75 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 70,127.75 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/24/11 EST. NO.01 TIME 10:34 AM R.E. NAME: MARTINEZ, BLAS 06-446704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 05/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-446704 TIME 10:34 AM ESTIMATE NO. 01 BID OPENING 10/05/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: MARTINEZ, BLAS DATE OF THIS ESTIMATE 05/24/11 LOCATION PROGRESS ESTIMATE 06-TUL-216-2.9/11.7 ----------------- W JAXON BAKER INC IN TULARE COUNTY IN AND NEAR P O BOX 994248 VISALIA FROM 0.4 MILE EAST OF REDDING CA 960994248 MCAULIFF STREET AVENUE 344 FED. AID NO. STP-P216(6)E PLACE RUBBERIZED HOT MIX ASPHALT ON ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 700.0000 700.00 0.420 294.00 0.420 294.00 02 PREPARE WATER POLLUTION CONTROL LS 750.0000 750.00 0.750 562.50 0.750 562.50 PROGRAM 03 CONSTRUCTION AREA SIGNS LS 4,500.0000 4,500.00 0.627 2,821.50 0.627 2,821.50 04 TRAFFIC CONTROL SYSTEM LS 149,000.0000 149,000.00 0.288 42,912.00 0.288 42,912.00 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 13,000.0000 13,000.00 0.288 3,744.00 0.288 3,744.00 06 REMOVE ASPHALT CONCRETE DIKE LF 0.2500 4,425.00 15,020.000 3,755.00 15,020.000 3,755.00 07 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.0000 36,800.00 40,723.866 40,723.87 40,723.866 40,723.87 08 LEAD COMPLIANCE PLAN LS 1,500.0000 1,500.00 0.710 1,065.00 0.710 1,065.00 09 IMPORTED MATERIAL (SHOULDER BACKING) TON 25.0000 34,750.00 0.000 0.00 10 CRACK TREATMENT LNMI 2,800.0000 50,400.00 15.638 43,786.40 15.638 43,786.40 11 HOT MIX ASPHALT (TYPE A) TON 80.0000 468,800.00 6,354.050 508,324.00 6,354.050 508,324.00 12 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 82.0000 1,271,000.00 0.000 0.00 13 DATA CORE LS 2,200.0000 2,200.00 0.000 0.00 14 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 7.0000 4,480.00 0.000 0.00 15 TACK COAT TON 1.0000 36.00 15.470 15.47 15.470 15.47 16 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2600 33,800.00 0.000 0.00 17 8" THERMOPLASTIC TRAFFIC STRIPE LF 0.6500 208.00 0.000 0.00 18 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 8,370.00 0.000 0.00 19 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.2000 7,060.00 0.000 0.00 (BROKEN 36-12) 20 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 6,510.00 0.000 0.00 21 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,500.0000 1,500.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 05/24/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-446704 TIME 10:34 AM ESTIMATE NO. 01 BID OPENING 10/05/10 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/11 R.E. NAME: MARTINEZ, BLAS DATE OF THIS ESTIMATE 05/24/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 648,003.74 648,003.74 ADJUSTMENT OF COMPENSATION 70,127.75 70,127.75 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 718,131.49 718,131.49 ORIGINAL CONTRACT AMOUNT 2,099,789.00 TOTAL WORK COMPLETED 718,131.49 718,131.49 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 718,131.49 718,131.49 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/20/10 45 05/02/11 04/25/11 06/24/11 20 76 0 0 32% 44% PROGRESS IS SATISFACTORY MARTINEZ, BLAS RESIDENT ENGINEER PROGRAM CAS145 DATE 05/24/11