PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/18/02 EST. NO.03 TIME 07:03 AM R.E. NAME: BULLARD, BRENT 06-452604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/18/02 EST. NO.03 TIME 07:03 AM R.E. NAME: BULLARD, BRENT 06-452604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/18/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-452604 TIME 07:03 AM ESTIMATE NO. 03 BID OPENING 10/10/01 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/02 R.E. NAME: BULLARD, BRENT DATE OF THIS ESTIMATE 06/18/02 LOCATION PROGRESS ESTIMATE 06-FRE-41-R30.4/ .0 ----------------- GRANITE CONSTRUCTION CO. IN FRESNO COUNTY IN FRESNO ON 11280 AVE. 10 1/2 HERNDON AVENUE SOUTHBOUND LOOP HANFORD, CA 93230-6106 ON RAMP FED. AID NO. N O N E WIDEN ON RAMP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 CONSTRUCTION AREA SIGNS LS 1,520.0000 1,520.00 0.030 45.60 0.830 1,261.60 (S) 002 TRAFFIC CONTROL SYSTEM LS 15,324.0000 15,324.00 0.000 0.00 (S) 003 TEMPORARY TRAFFIC STRIPE (PAINT) M 18.0000 1,620.00 90.000 1,620.00 90.000 1,620.00 (S) 004 CHANNELIZER (SURFACE MOUNTED) EA 72.0000 1,512.00 21.000 1,512.00 21.000 1,512.00 (S) 005 PORTABLE CHANGEABLE MESSAGE SIGN EA 2,965.0000 2,965.00 0.000 0.00 (S) 006 REMOVE CULVERT AND FLARED END SECTION M 620.0000 4,960.00 8.000 4,960.00 007 REMOVE INLET EA 2,150.0000 2,150.00 1.000 2,150.00 008 RELOCATE ROADSIDE SIGN EA 268.0000 268.00 0.000 0.00 (STRAP AND SADDLE BRACKET METHOD) 009 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 25.0000 8,750.00 307.200 7,680.00 (S) (30 MM MAXIMUM) 010 REMOVE CONCRETE CURB AND SIDEWALK M3 130.0000 2,600.00 13.000 1,690.00 011 ROADWAY EXCAVATION M3 30.0000 3,600.00 120.000 3,600.00 012 HIGHWAY PLANTING LS 6,500.0000 6,500.00 1.000 6,500.00 1.000 6,500.00 (S) 013 TRANSPLANT TREE EA 1,300.0000 15,600.00 11.000 14,300.00 (S) (150 MM DIA OR SMALLER) 014 PLANT ESTABLISHMENT WORK LS 3,100.0000 3,100.00 0.200 620.00 0.650 2,015.00 (S) 015 IRRIGATION SYSTEM LS 6,800.0000 6,800.00 0.100 680.00 1.000 6,800.00 (S) 016 AGGREGATE BASE M3 25.0000 1,500.00 60.000 1,500.00 60.000 1,500.00 017 ASPHALT CONCRETE (TYPE A) TONN 155.0000 23,250.00 191.531 29,687.31 191.531 29,687.31 018 MINOR CONCRETE (MINOR STRUCTURE) M3 4,725.0000 8,505.00 1.800 8,505.00 1.800 8,505.00 (F) 019 ROADSIDE SIGN - ONE POST EA 450.0000 1,350.00 0.000 0.00 020 600 MM REINFORCED CONCRETE PIPE M 585.0000 16,965.00 29.000 16,965.00 021 600 MM CONCRETE FLARED END SECTION EA 455.0000 455.00 1.000 455.00 022 MINOR CONCRETE (MISCELLANEOUS M3 455.0000 9,100.00 21.100 9,600.50 CONSTRUCTION) PROGRAM CAS145 PAGE 2 DATE 06/18/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-452604 TIME 07:03 AM ESTIMATE NO. 03 BID OPENING 10/10/01 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/02 R.E. NAME: BULLARD, BRENT DATE OF THIS ESTIMATE 06/18/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 MISCELLANEOUS IRON AND STEEL KG 7.3000 1,241.00 170.000 1,241.00 024 THERMOPLASTIC TRAFFIC STRIPE M 8.0000 1,760.00 0.000 0.00 (S) 025 THERMOPLASTIC PAVEMENT MARKING M2 50.0000 1,850.00 0.000 0.00 (S) 026 PAVEMENT MARKER (RETROREFLECTIVE) EA 6.0000 180.00 0.000 0.00 (S) 027 MODIFY RAMP METERING SYSTEM LS 31,000.0000 31,000.00 0.150 4,650.00 0.950 29,450.00 (S) 028 MODIFY LIGHTING LS 13,500.0000 13,500.00 0.050 675.00 0.950 12,825.00 (S) PROGRAM CAS145 PAGE 3 DATE 06/18/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-452604 TIME 07:03 AM ESTIMATE NO. 03 BID OPENING 10/10/01 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/02 R.E. NAME: BULLARD, BRENT DATE OF THIS ESTIMATE 06/18/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 55,994.91 164,317.41 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 55,994.91 164,317.41 ORIGINAL CONTRACT AMOUNT 187,925.00 TOTAL WORK COMPLETED 55,994.91 164,317.41 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 55,994.91 164,317.41 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/07/01 85 11/22/01 04/15/02 06/22/02 45 3 0 18 PLANT ESTABLISHMENT PERI PROGRESS IS SATISFACTORY BULLARD, BRENT RESIDENT ENGINEER PROGRAM CAS145 PAGE 30 DATE 06/18/02