PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/21/11 EST. NO.01 TIME 06:41 AM R.E. NAME: HADDADIN, HAIDAR 06-460004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/21/11 EST. NO.01 TIME 06:41 AM R.E. NAME: HADDADIN, HAIDAR 06-460004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 04/21/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-460004 TIME 06:41 AM ESTIMATE NO. 01 BID OPENING 01/04/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/11 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 04/21/11 LOCATION PROGRESS ESTIMATE 06-KER-43-16.1/25.1 ----------------- GRANITE CONSTRUCTION COMPANY IN KERN COUNTY IN SHAFTER AND WASCO P O BOX 50085 FROM 0.3 MILE NORTH OF LOS ANGELES WATSONVILLE CA 95076 STREET TO ROUTE 46 FED. AID NO. ACST-P043(38)E ,P-P043(38)E PLACE RUBBERIZED HOT MIX ASPHALT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 4,800.0000 4,800.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 250.0000 250.00 0.000 0.00 PROGRAM 03 CONSTRUCTION AREA SIGNS LS 4,900.0000 4,900.00 0.700 3,430.00 0.700 3,430.00 04 TRAFFIC CONTROL SYSTEM LS 32,294.0000 32,294.00 0.000 0.00 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 12,000.0000 12,000.00 0.100 1,200.00 0.100 1,200.00 06 REMOVE ASPHALT CONCRETE DIKE LF 0.0600 336.00 0.000 0.00 07 ADJUST FRAME AND GRATE TO GRADE EA 400.0000 9,200.00 0.000 0.00 08 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 1.5900 107,643.00 0.000 0.00 09 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 0.000 0.00 10 IMPORTED MATERIAL (SHOULDER BACKING) TON 14.0000 57,820.00 0.000 0.00 11 REPLACE ASPHALT CONCRETE SURFACING CY 138.0000 1,573,200.00 370.000 51,060.00 370.000 51,060.00 12 HOT MIX ASPHALT (TYPE A) TON 77.0000 569,030.00 0.000 0.00 13 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 86.5000 2,759,350.00 0.000 0.00 14 DATA CORE LS 19,000.0000 19,000.00 0.000 0.00 15 PLACE HOT MIX ASPHALT DIKE (TYPE A) LF 2.0000 11,200.00 0.000 0.00 16 TACK COAT TON 1.0000 170.00 0.000 0.00 17 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3500 59,150.00 0.000 0.00 18 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 6,980.00 0.000 0.00 19 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 19,950.00 0.000 0.00 20 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 28,530.00 0.000 0.00 (BROKEN 36-12) 21 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0500 14,884.00 0.000 0.00 22 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1.0000 1.00 0.000 0.00 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 2 DATE 04/21/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-460004 TIME 06:41 AM ESTIMATE NO. 01 BID OPENING 01/04/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/11 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 04/21/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 DETECTOR LOOP LS 11,500.0000 11,500.00 0.000 0.00 24 TRAFFIC MONITORING STATION LS 5,750.0000 5,750.00 0.000 0.00 25 MODIFY SIGNAL (LOCATION 1) LS 97,500.0000 97,500.00 0.000 0.00 26 MODIFY SIGNAL (LOCATION 2) LS 93,500.0000 93,500.00 0.000 0.00 27 MODIFY SIGNAL (LOCATION 3) LS 98,900.0000 98,900.00 0.152 15,032.80 0.152 15,032.80 PROGRAM CAS145 PAGE 3 DATE 04/21/11 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-460004 TIME 06:41 AM ESTIMATE NO. 01 BID OPENING 01/04/11 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/11 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 04/21/11 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 70,722.80 70,722.80 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 70,722.80 70,722.80 28 MOBILIZATION LS 59,000.0000 59,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 5,657,838.00 TOTAL WORK COMPLETED 70,722.80 70,722.80 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 70,722.80 70,722.80 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/16/11 40 04/07/11 04/07/11 07/13/11 8 2 0 0 1% 20% PROGRESS IS SATISFACTORY HADDADIN, HAIDAR RESIDENT ENGINEER PROGRAM CAS145 DATE 04/21/11