PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/22/06 EST. NO.02 TIME 01:00 PM R.E. NAME: LOPEZ, ALBERTO 06-4664U4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/22/06 EST. NO.02 TIME 01:00 PM R.E. NAME: LOPEZ, ALBERTO 06-4664U4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 02 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 02/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-4664U4 TIME 01:00 PM ESTIMATE NO. 02 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/06 R.E. NAME: LOPEZ, ALBERTO DATE OF THIS ESTIMATE 02/22/06 LOCATION PROGRESS ESTIMATE 06-FRE-180-124.4/ .0 ----------------- AGEE CONSTRUCTION CORP. IN FRESNO COUNTY ABOUT 12 KM NORTH P.O. BOX 629 OF WILSONIA AT VARIOUS LOCATIONS CLOVIS, CA FED. AID NO. N O N E CONSTRUCT GABIONS AND RESURFACE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,500.0000 1,500.00 0.750 1,125.00 PROGRAM 02 WATER POLLUTION CONTROL LS 5,500.0000 5,500.00 0.278 1,529.00 0.487 2,678.50 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 4,500.0000 4,500.00 1.000 4,500.00 1.000 4,500.00 04 CONSTRUCTION AREA SIGNS LS 3,000.0000 3,000.00 0.040 120.00 0.820 2,460.00 S) 05 TRAFFIC CONTROL SYSTEM LS 16,000.0000 16,000.00 0.480 7,680.00 0.480 7,680.00 S) 06 TYPE III BARRICADE EA 100.0000 800.00 12.000 1,200.00 S) 07 TEMPORARY RAILING (TYPE K) M 150.0000 11,700.00 0.000 0.00 08 REMOVE CULVERT M 850.0000 6,800.00 8.000 6,800.00 09 REMOVE HEADWALL EA 3,400.0000 3,400.00 1.000 3,400.00 10 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 18.0000 7,200.00 0.000 0.00 S) 11 CLEARING AND GRUBBING LS 3,000.0000 3,000.00 0.670 2,010.00 1.000 3,000.00 12 ROADWAY EXCAVATION M3 250.0000 50,000.00 59.000 14,750.00 13 STRUCTURE EXCAVATION (BRIDGE) M3 350.0000 4,200.00 12.000 4,200.00 F) 14 STRUCTURE BACKFILL (BRIDGE) M3 400.0000 2,800.00 5.000 2,000.00 5.000 2,000.00 F) 15 IMPORTED MATERIAL (SHOULDER BACKING) TONN 320.0000 4,800.00 0.000 0.00 16 EROSION CONTROL (TYPE D) M2 11.0000 2,640.00 0.000 0.00 17 PLANT (GROUP W) EA 40.0000 2,880.00 0.000 0.00 18 ASPHALT CONCRETE (TYPE A) TONN 160.0000 62,400.00 0.000 0.00 19 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 20.0000 540.00 0.000 0.00 20 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 20.0000 3,200.00 0.000 0.00 21 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 20.0000 180.00 0.000 0.00 22 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 5,450.0000 70,850.00 13.000 70,850.00 13.000 70,850.00 S) PILING PROGRAM CAS145 PAGE 2 DATE 02/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-4664U4 TIME 01:00 PM ESTIMATE NO. 02 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/06 R.E. NAME: LOPEZ, ALBERTO DATE OF THIS ESTIMATE 02/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 600 MM CAST-IN-DRILLED-HOLE CONCRETE M 5,600.0000 50,400.00 9.000 50,400.00 9.000 50,400.00 S) PILING 24 STRUCTURAL CONCRETE, BRIDGE M3 6,000.0000 48,000.00 0.000 0.00 F) 25 MINOR CONCRETE (MINOR STRUCTURE) M3 3,650.0000 8,760.00 0.000 0.00 F) 26 ARCHITECTURAL TREATMENT M2 275.0000 33,275.00 0.000 0.00 F) 27 DRILL AND BOND DOWEL M 250.0000 2,000.00 0.000 0.00 28 FURNISH PRECAST PRESTRESSED CONCRETE M2 585.0000 54,405.00 0.000 0.00 SF)SLAB (TYPE SIV) 29 ERECT PRECAST CONCRETE DECK UNIT EA 6,400.0000 38,400.00 0.000 0.00 S) 30 JOINT SEAL (ASPHALTIC PLUG) M 900.0000 7,200.00 0.000 0.00 S) 31 BAR REINFORCING STEEL (BRIDGE) KG 4.0000 5,908.00 0.000 0.00 SF) 32 PREPARE AND STAIN CONCRETE LS 9,000.0000 9,000.00 0.000 0.00 S) 33 600 MM CORRUGATED STEEL PIPE M 975.0000 12,675.00 7.000 6,825.00 7.000 6,825.00 (2.01 MM THICK) 34 ROCK SLOPE PROTECTION M3 585.0000 2,340.00 0.000 0.00 (BACKING NO. 2, METHOD B) 35 GABION M3 600.0000 36,600.00 23.000 13,800.00 23.000 13,800.00 36 MISCELLANEOUS IRON AND STEEL KG 3.5000 378.00 0.000 0.00 F) 37 DELINEATOR (CLASS 1) EA 100.0000 100.00 0.000 0.00 38 OBJECT MARKER EA 150.0000 750.00 0.000 0.00 39 TRANSITION RAILING (TYPE WB) EA 6,000.0000 12,000.00 0.000 0.00 S) 40 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,000.0000 5,000.00 0.000 0.00 S) 41 ALTERNATIVE FLARED TERMINAL SYSTEM EA 4,500.0000 4,500.00 0.000 0.00 S) 42 CONCRETE BARRIER (TYPE 732 MODIFIED) M 775.0000 27,900.00 0.000 0.00 F) 43 THERMOPLASTIC TRAFFIC STRIPE M 15.0000 5,400.00 0.000 0.00 S) (SPRAYABLE) PROGRAM CAS145 PAGE 3 DATE 02/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-4664U4 TIME 01:00 PM ESTIMATE NO. 02 BID OPENING 10/04/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/06 R.E. NAME: LOPEZ, ALBERTO DATE OF THIS ESTIMATE 02/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 159,714.00 195,668.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 159,714.00 195,668.50 44 MOBILIZATION LS 60,000.0000 60,000.00 0.450 27,000.00 0.950 57,000.00 ORIGINAL CONTRACT AMOUNT 692,881.00 TOTAL WORK COMPLETED 186,714.00 252,668.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -10,000.00 -10,000.00 TOTAL 176,714.00 242,668.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/14/05 115 11/29/05 11/29/05 04/20/06 56 28 0 0 37% 49% PROGRESS IS SATISFACTORY LOPEZ, ALBERTO RESIDENT ENGINEER PROGRAM CAS145 PAGE 13 DATE 02/22/06