PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/09/05 EST. NO.04 TIME 07:14 AM R.E. NAME: SHELLEY MAGGARD 06-474604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/09/05 EST. NO.04 TIME 07:14 AM R.E. NAME: SHELLEY MAGGARD 06-474604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 02 MISS PYRL -10,000.00 03 MISS PYRL RECD 20,000.00 04 20,000.00 0.00 OTHER OUTSTANDING DOCUMENTS MISS CEM2402, FHWA47 -10,000.00 03 0.00 -10,000.00 TOTAL DEDUCTIONS 20,000.00 -10,000.00 PROGRAM CAS145 PAGE 1 DATE 09/09/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474604 TIME 07:14 AM ESTIMATE NO. 04 BID OPENING 03/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/09/05 R.E. NAME: SHELLEY MAGGARD DATE OF THIS ESTIMATE 09/09/05 LOCATION SEMI-FINAL ESTIMATE 06-TUL-99-30.6/33.9 ------------------- MODERN ALLOYS, INC IN TULARE COUNTY IN AND NEAR TULARE 11172 WESTERN AVE FROM PROSPERITY AVENUE OVERCROSSING STANTON, CA 90680 TO TAGUS AVENUE OVERCROSSING FED. AID NO. ACST-P099(488)E ,PHG-P099(488)E CONSTRUCT MEDIAN BARRIER ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 2,100.0000 2,100.00 1.000 2,100.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 19,600.0000 19,600.00 1.000 19,600.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 1,540.0000 1,540.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 4,350.0000 4,350.00 1.000 4,350.00 S) 05 TRAFFIC CONTROL SYSTEM LS 63,200.0000 63,200.00 1.000 63,200.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 22,800.0000 22,800.00 1.000 22,800.00 S) 07 REMOVE FLARED END SECTION EA 265.0000 1,325.00 5.000 1,325.00 08 SALVAGE METAL BEAM GUARD RAILING M 40.0000 6,000.00 167.500 6,700.00 09 RECONSTRUCT SINGLE THRIE BEAM BARRIER M 94.5000 2,929.50 0.000 0.00 10 RESET ROADSIDE SIGN EA 160.0000 320.00 2.000 320.00 11 REMOVE CRASH CUSHION EA 2,330.0000 9,320.00 4.000 9,320.00 12 CLEARING AND GRUBBING LS 7,000.0000 7,000.00 1.000 7,000.00 13 IMPORTED BORROW M3 54.3000 288,876.00 368.660 20,018.24 4,801.080 260,698.64 14 FIBER (EROSION CONTROL) KG 5.0000 5,500.00 952.600 4,763.00 S) 15 STABILIZING EMULSION (EROSION CONTROL) KG 5.1000 5,610.00 952.600 4,858.26 S) 16 ASPHALT CONCRETE TONN 135.0000 472.50 2.760 372.60 17 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 300.0000 4,200.00 11.470 3,441.00 AREA) 18 MINOR CONCRETE (MINOR STRUCTURE) M3 1,310.0000 655.00 0.500 655.00 F) 19 600 MM CORRUGATED STEEL PIPE M 1,150.0000 3,450.00 3.000 3,450.00 (2.77 MM THICK) 20 900 MM CORRUGATED STEEL PIPE M 1,260.0000 3,528.00 2.800 3,528.00 (2.77 MM THICK) 21 1200 MM CORRUGATED STEEL PIPE INLET M 5,200.0000 9,360.00 1.800 9,360.00 (3.51 MM THICK) 22 DEBRIS RACK EA 1,040.0000 3,120.00 2.000 2,080.00 PROGRAM CAS145 PAGE 2 DATE 09/09/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474604 TIME 07:14 AM ESTIMATE NO. 04 BID OPENING 03/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/09/05 R.E. NAME: SHELLEY MAGGARD DATE OF THIS ESTIMATE 09/09/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MISCELLANEOUS IRON AND STEEL KG 2.2000 209.00 95.000 209.00 F) 24 SINGLE THRIE BEAM BARRIER (STEEL POST) M 72.2500 717,442.50 9,868.000 712,963.00 25 TERMINAL SYSTEM (TYPE CAT) EA 5,100.0000 5,100.00 1.000 5,100.00 26 TERMINAL SYSTEM (TYPE CAT) BACKUP EA 520.0000 520.00 1.000 520.00 27 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 765.0000 2,295.00 3.000 2,295.00 PROGRAM CAS145 PAGE 3 DATE 09/09/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474604 TIME 07:14 AM ESTIMATE NO. 04 BID OPENING 03/22/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/09/05 R.E. NAME: SHELLEY MAGGARD DATE OF THIS ESTIMATE 09/09/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 20,018.24 1,151,008.50 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 20,018.24 1,151,008.50 28 MOBILIZATION LS 29,700.0000 29,700.00 1.000 29,700.00 ORIGINAL CONTRACT AMOUNT 1,220,522.50 TOTAL WORK COMPLETED 20,018.24 1,180,708.50 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 20,000.00 -10,000.00 TOTAL 40,018.24 1,170,708.50 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/22/05 60 05/23/05 05/13/05 08/09/05 61 0 0 1 100% 100% SHELLEY MAGGARD RESIDENT ENGINEER PROGRAM CAS145 DATE 09/09/05