PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/17/07 EST. NO.06 TIME 06:14 AM R.E. NAME: RIZWAN TANVIR 06-474804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0046 588.25 E.W. @ F.A.(+) 092407 N 4932 0 002 0003 6,797.78 E.W. @ F.A.(+) 072707 N 5321 0 0004 5,626.49 080707 N 8077 0 003 0001 433.14 A.C. @ F.A.(+) 052107 N 0015 0 0002 433.14 052207 N 0016 0 0003 248.00 052107 N 521070 0004 248.00 052207 N 522070 14,374.80 TOTAL THIS ESTIMATE 31,323.31 TOTAL PREVIOUS ESTIMATE 45,698.11 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/17/07 EST. NO.06 TIME 06:14 AM R.E. NAME: RIZWAN TANVIR 06-474804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PYRL -2,639.43 06 -2,639.43 -2,639.43 TOTAL DEDUCTIONS -2,639.43 -2,639.43 PROGRAM CAS145 PAGE 1 DATE 10/17/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474804 TIME 06:14 AM ESTIMATE NO. 06 BID OPENING 12/12/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/24/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 10/17/07 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 06-KIN-43-22.3/22.7 ---------------------------------- GRANITE CONSTRUCTION CO. IN KINGS COUNTY NEAR HANFORD FROM 2716 GRANITE COURT 0.3 KM SOUTH OF FLINT AVENUE TO FRESNO, CA 93706 0.3 KM NORTH OF FLINT AVENUE FED. AID NO. ACST-P043(35)E ,PHG-P043(35)E LEFT TURN LANE AND INSTALL SIGNAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 2,100.0000 2,100.00 0.250 525.00 1.000 2,100.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 10,200.0000 10,200.00 0.010 102.00 1.000 10,200.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 2,400.0000 2,400.00 0.100 240.00 1.000 2,400.00 04 CONSTRUCTION AREA SIGNS LS 3,050.0000 3,050.00 0.200 610.00 1.000 3,050.00 S) 05 TRAFFIC CONTROL SYSTEM LS 20,000.0000 20,000.00 0.990 19,800.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 8,740.0000 8,740.00 0.010 87.40 1.000 8,740.00 S) 07 REMOVE ROADSIDE SIGN EA 102.0000 408.00 0.000 0.00 08 RESET ROADSIDE SIGN EA 161.0000 161.00 0.000 0.00 09 RELOCATE FENCE M 83.0000 8,300.00 0.000 0.00 10 RELOCATE ROADSIDE SIGN-TWO POST EA 161.0000 161.00 0.000 0.00 11 ADJUST MONUMENT TO GRADE EA 1,370.0000 1,370.00 2.000 2,740.00 12 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 1.000 10,000.00 13 ROADWAY EXCAVATION M3 65.0000 69,550.00 1,070.000 69,550.00 14 IMPORTED BORROW M3 27.0000 4,860.00 1,029.800 27,804.60 15 STRAW (EROSION CONTROL) TONN 535.0000 4,280.00 8.000 4,280.00 8.000 4,280.00 S) 16 FIBER (EROSION CONTROL) KG 1.0000 1,770.00 1,995.810 1,995.81 1,995.810 1,995.81 S) 17 PURE LIVE SEED (EROSION CONTROL) KG 103.0000 3,708.00 35.640 3,670.92 35.640 3,670.92 S) 18 STABILIZING EMULSION (EROSION CONTROL) KG 2.5000 900.00 362.870 907.18 362.870 907.18 S) 19 CLASS 2 AGGREGATE BASE M3 58.0000 83,520.00 749.420 43,466.36 20 ASPHALT CONCRETE (TYPE A) TONN 90.0000 413,100.00 43.510 3,915.90 4,230.500 380,745.00 21 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 19.0000 3,040.00 158.240 3,006.56 AREA) 22 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 43.0000 4,730.00 103.000 4,429.00 PROGRAM CAS145 PAGE 2 DATE 10/17/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474804 TIME 06:14 AM ESTIMATE NO. 06 BID OPENING 12/12/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/24/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 10/17/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 4.00 4.770 4.77 24 FURNISH SINGLE SHEET ALUMINUM SIGN M2 260.0000 2,860.00 0.000 0.00 (1.6 MM-UNFRAMED) 25 ROADSIDE SIGN - ONE POST EA 241.0000 482.00 0.000 0.00 26 THERMOPLASTIC PAVEMENT MARKING M2 33.0000 3,960.00 76.350 2,519.55 108.090 3,566.97 S) 27 THERMOPLASTIC TRAFFIC STRIPE M 0.5000 1,710.00 3,836.000 1,918.00 S) (SPRAYABLE) 28 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 17,800.00 4,015.000 16,060.00 S) 29 PAVEMENT MARKER (RETROREFLECTIVE) EA 1.0000 730.00 472.000 472.00 S) 30 SIGNAL AND LIGHTING LS 203,800.0000 203,800.00 0.037 7,540.60 1.000 203,800.00 S) 31 TRAFFIC MONITORING STATION LS 9,570.0000 9,570.00 1.000 9,570.00 S) PROGRAM CAS145 PAGE 3 DATE 10/17/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474804 TIME 06:14 AM ESTIMATE NO. 06 BID OPENING 12/12/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/24/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 10/17/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 26,394.36 834,277.17 ADJUSTMENT OF COMPENSATION 1,362.28 1,362.28 EXTRA WORK 13,012.52 44,335.83 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 40,769.16 879,975.28 32 MOBILIZATION LS 15,000.0000 15,000.00 1.000 15,000.00 ORIGINAL CONTRACT AMOUNT 912,264.00 TOTAL WORK COMPLETED 40,769.16 894,975.28 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -2,639.43 -2,639.43 TOTAL 38,129.73 892,335.85 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/10/07 90 05/07/07 05/07/07 09/24/07 97 0 2 5 100% 100% RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 10/17/07