PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/06/07 EST. NO.07 TIME 09:00 AM R.E. NAME: RIZWAN TANVIR 06-474804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 005 0001 5,683.00 E.W. @ U.P (+) 082207 N 001 0 006 0001 8,368.14 A.C. @ U.P.(+) 110107 N 001 0 007 0001 12,695.00 A.C. @ L.S.(+) 110107 N 214554 26,746.14 TOTAL THIS ESTIMATE 45,698.11 TOTAL PREVIOUS ESTIMATE 72,444.25 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/06/07 EST. NO.07 TIME 09:00 AM R.E. NAME: RIZWAN TANVIR 06-474804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PYRL -2,639.43 06 0.00 -2,639.43 TOTAL DEDUCTIONS 0.00 -2,639.43 PROGRAM CAS145 PAGE 1 DATE 11/06/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474804 TIME 09:00 AM ESTIMATE NO. 07 BID OPENING 12/12/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/24/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 11/06/07 LOCATION SEMI-FINAL ESTIMATE 06-KIN-43-22.3/22.7 ------------------- GRANITE CONSTRUCTION CO. IN KINGS COUNTY NEAR HANFORD FROM 2716 GRANITE COURT 0.3 KM SOUTH OF FLINT AVENUE TO FRESNO, CA 93706 0.3 KM NORTH OF FLINT AVENUE FED. AID NO. ACST-P043(35)E ,PHG-P043(35)E LEFT TURN LANE AND INSTALL SIGNAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 2,100.0000 2,100.00 1.000 2,100.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 10,200.0000 10,200.00 1.000 10,200.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 2,400.0000 2,400.00 1.000 2,400.00 04 CONSTRUCTION AREA SIGNS LS 3,050.0000 3,050.00 1.000 3,050.00 S) 05 TRAFFIC CONTROL SYSTEM LS 20,000.0000 20,000.00 0.010 200.00 1.000 20,000.00 S) 06 PORTABLE CHANGEABLE MESSAGE SIGN LS 8,740.0000 8,740.00 1.000 8,740.00 S) 07 REMOVE ROADSIDE SIGN EA 102.0000 408.00 4.000 408.00 4.000 408.00 08 RESET ROADSIDE SIGN EA 161.0000 161.00 3.000 483.00 3.000 483.00 09 RELOCATE FENCE M 83.0000 8,300.00 0.000 0.00 10 RELOCATE ROADSIDE SIGN-TWO POST EA 161.0000 161.00 0.000 0.00 11 ADJUST MONUMENT TO GRADE EA 1,370.0000 1,370.00 2.000 2,740.00 12 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 1.000 10,000.00 13 ROADWAY EXCAVATION M3 65.0000 69,550.00 1,070.000 69,550.00 14 IMPORTED BORROW M3 27.0000 4,860.00 1,029.800 27,804.60 15 STRAW (EROSION CONTROL) TONN 535.0000 4,280.00 8.000 4,280.00 S) 16 FIBER (EROSION CONTROL) KG 1.0000 1,770.00 1,995.810 1,995.81 S) 17 PURE LIVE SEED (EROSION CONTROL) KG 103.0000 3,708.00 35.640 3,670.92 S) 18 STABILIZING EMULSION (EROSION CONTROL) KG 2.5000 900.00 362.870 907.18 S) 19 CLASS 2 AGGREGATE BASE M3 58.0000 83,520.00 749.420 43,466.36 20 ASPHALT CONCRETE (TYPE A) TONN 90.0000 413,100.00 4,230.500 380,745.00 21 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 19.0000 3,040.00 158.240 3,006.56 AREA) 22 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 43.0000 4,730.00 103.000 4,429.00 PROGRAM CAS145 PAGE 2 DATE 11/06/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474804 TIME 09:00 AM ESTIMATE NO. 07 BID OPENING 12/12/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/24/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 11/06/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 ASPHALTIC EMULSION (PAINT BINDER) TONN 1.0000 4.00 4.770 4.77 24 FURNISH SINGLE SHEET ALUMINUM SIGN M2 260.0000 2,860.00 10.440 2,714.40 10.440 2,714.40 (1.6 MM-UNFRAMED) 25 ROADSIDE SIGN - ONE POST EA 241.0000 482.00 2.000 482.00 2.000 482.00 26 THERMOPLASTIC PAVEMENT MARKING M2 33.0000 3,960.00 108.090 3,566.97 S) 27 THERMOPLASTIC TRAFFIC STRIPE M 0.5000 1,710.00 3,836.000 1,918.00 S) (SPRAYABLE) 28 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 17,800.00 4,015.000 16,060.00 S) 29 PAVEMENT MARKER (RETROREFLECTIVE) EA 1.0000 730.00 472.000 472.00 S) 30 SIGNAL AND LIGHTING LS 203,800.0000 203,800.00 1.000 203,800.00 S) 31 TRAFFIC MONITORING STATION LS 9,570.0000 9,570.00 1.000 9,570.00 S) PROGRAM CAS145 PAGE 3 DATE 11/06/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-474804 TIME 09:00 AM ESTIMATE NO. 07 BID OPENING 12/12/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/24/07 R.E. NAME: RIZWAN TANVIR DATE OF THIS ESTIMATE 11/06/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,287.40 838,564.57 ADJUSTMENT OF COMPENSATION 21,063.14 22,425.42 EXTRA WORK 5,683.00 50,018.83 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 31,033.54 911,008.82 32 MOBILIZATION LS 15,000.0000 15,000.00 1.000 15,000.00 ORIGINAL CONTRACT AMOUNT 912,264.00 TOTAL WORK COMPLETED 31,033.54 926,008.82 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -2,639.43 TOTAL 31,033.54 923,369.39 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/10/07 90 05/07/07 05/07/07 09/24/07 97 0 2 5 100% 100% RIZWAN TANVIR RESIDENT ENGINEER PROGRAM CAS145 DATE 11/06/07