PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/24/04 EST. NO.01 TIME 06:50 AM R.E. NAME: JACK COLLINS 06-476904 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/24/04 EST. NO.01 TIME 06:50 AM R.E. NAME: JACK COLLINS 06-476904 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/24/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-476904 TIME 06:50 AM ESTIMATE NO. 01 BID OPENING 02/03/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/04 R.E. NAME: JACK COLLINS DATE OF THIS ESTIMATE 08/24/04 LOCATION PROGRESS ESTIMATE 06-KER-223-20.5/20.7 ----------------- GRANITE CONSTRUCTION COMPANY IN KERN COUNTY IN ARVIN AT CAMPUS P O BOX 50085 DRIVE WATSONVILLE CA 950775085 FED. AID NO. ACST-P223(9)E ,PHG-P223(9)E INSTALL SIGNAL AND WHEELCHAIR RAMP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 650.0000 650.00 0.750 487.50 0.750 487.50 PROGRAM 02 WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 0.500 1,500.00 0.500 1,500.00 03 CONSTRUCTION AREA SIGNS LS 1,500.0000 1,500.00 0.500 750.00 0.500 750.00 S) 04 TRAFFIC CONTROL SYSTEM LS 6,000.0000 6,000.00 0.500 3,000.00 0.500 3,000.00 S) 05 PORTABLE CHANGEABLE MESSAGE SIGN LS 2,400.0000 2,400.00 0.500 1,200.00 0.500 1,200.00 S) 06 REMOVE PAVEMENT MARKER M2 30.0000 960.00 0.000 0.00 07 REMOVE ROADSIDE SIGN EA 71.0000 710.00 0.000 0.00 08 REMOVE INLET EA 968.0000 968.00 0.000 0.00 09 REMOVE CONCRETE M3 430.0000 12,900.00 18.790 8,079.70 18.790 8,079.70 10 ROADWAY EXCAVATION M3 56.0000 15,120.00 269.000 15,064.00 269.000 15,064.00 11 HIGHWAY PLANTING LS 9,100.0000 9,100.00 0.000 0.00 S) 12 ROCK BLANKET M2 150.0000 8,250.00 0.000 0.00 S) 13 TRANSPLANT TREE EA 950.0000 18,050.00 15.000 14,250.00 15.000 14,250.00 14 IRRIGATION SYSTEM LS 8,300.0000 8,300.00 0.000 0.00 S) 15 EXTEND 100 MM IRRIGATION CONDUIT M 660.0000 2,640.00 0.000 0.00 S) 16 CLASS 2 AGGREGATE BASE M3 50.0000 4,000.00 0.000 0.00 17 ASPHALT CONCRETE (TYPE A) TONN 91.0000 13,650.00 0.000 0.00 18 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 10.0000 410.00 0.000 0.00 AREA) 19 MINOR CONCRETE (MINOR STRUCTURE) M3 4,000.0000 8,000.00 0.000 0.00 20 ROADSIDE SIGN - ONE POST EA 267.0000 1,068.00 0.000 0.00 21 MINOR CONCRETE (MISCELLANEOUS M3 700.0000 35,000.00 0.000 0.00 CONSTRUCTION) 22 FRAME AND GRATE EA 1,430.0000 1,430.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 08/24/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-476904 TIME 06:50 AM ESTIMATE NO. 01 BID OPENING 02/03/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/04 R.E. NAME: JACK COLLINS DATE OF THIS ESTIMATE 08/24/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 THERMOPLASTIC PAVEMENT MARKING M2 52.0000 4,992.00 0.000 0.00 S) 24 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 880.00 0.000 0.00 S) 25 200 MM THERMOPLASTIC TRAFFIC STRIPE M 5.0000 2,300.00 0.000 0.00 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.0000 280.00 0.000 0.00 S) 27 MODIFY SIGNAL AND LIGHTING (LOCATION 1) LS 142,417.0000 142,417.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/24/04 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-476904 TIME 06:50 AM ESTIMATE NO. 01 BID OPENING 02/03/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/04 R.E. NAME: JACK COLLINS DATE OF THIS ESTIMATE 08/24/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS 44,331.20 44,331.20 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED 44,331.20 44,331.20 ORIGINAL CONTRACT AMOUNT 304,975.00 TOTAL WORK COMPLETED 44,331.20 44,331.20 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 44,331.20 44,331.20 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/25/04 135 05/01/04 00/00/00 02/11/05 72 0 0 57 14% 11% PROGRESS IS SATISFACTORY JACK COLLINS RESIDENT ENGINEER PROGRAM CAS145 PAGE 31 DATE 08/24/04