PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/26/25 EST. NO. 002 TIME 08:37 AM R.E. NAME: AMIR ZAMANIAN 06-487404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 007 0001 3,200.14 E.W. @ F.A.(+) 063025 N 0001.1 0002 250.76 063025 N 0002.1 3,450.90 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 3,450.90 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/26/25 EST. NO. 002 TIME 08:37 AM R.E. NAME: AMIR ZAMANIAN 06-487404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 LOCATION PROGRESS ESTIMATE 06-TUL-99-35.8/37.1 ----------------- GRANITE CONSTRUCTION COMPANY TULARE COUNTY IN AND NEAR VISALIA FROM 0.6 2716 GRANITE COURT MILE SOUTH OF AVENUE 280 OVERCROSSING TO FRESNO CA 93706 0.7 MILE NORTH OF AVENUE 280 OVERCROSSING FED. AID NO. 6206-039 ( ) REPLACE BRIDGE STRUCTURES AND CONSTRUCT RO ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,500.0000 3,500.00 1.000 3,500.00 1.000 3,500 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 15,000.0000 15,000.00 1.000 15,000.00 1.000 15,000 003 TIME-RELATED OVERHEAD (WDAY) WDAY 9,450.0000 3,969,000.00 0.000 0 004 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 6,000.0000 54,000.00 1.000 6,000 005 HOURLY OFF-SITE HR 200.0000 7,200.00 2.000 400.00 2.000 400 DISPUTE-RESOLUTION-BOARD-RELATED TASKS 006 DEVELOP WATER SUPPLY LS 250,000.0000 250,000.00 0.000 0 007 CONSTRUCTION AREA SIGNS LS 31,500.0000 31,500.00 0.000 0 008 TRAFFIC CONTROL SYSTEM LS 310,000.0000 310,000.00 0.000 0 009 TYPE III BARRICADE EA 200.0000 6,800.00 0.000 0 010 TEMPORARY TRAFFIC STRIPE (PAINT) LF 1.2500 28,500.00 0.000 0 011 CHANNELIZER (SURFACE MOUNTED) EA 100.0000 9,000.00 0.000 0 012 PORTABLE RADAR SPEED FEEDBACK SIGN DAY 100.0000 36,000.00 0.000 0 SYSTEM 013 TEMPORARY PAVEMENT MARKER EA 10.0000 1,500.00 0.000 0 014 TEMPORARY BARRIER SYSTEM LF 16.0000 219,200.00 0.000 0 015 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS 10,000.0000 10,000.00 0.000 0 016 TEMPORARY CRASH CUSHION TL-3 EA 5,000.0000 30,000.00 0.000 0 017 TEMPORARY TRAFFIC SCREEN LF 7.0000 17,850.00 0.000 0 018 JOB SITE MANAGEMENT LS 50,000.0000 50,000.00 0.000 0 019 STORMWATER POLLUTION PREVENTION PLAN LS 4,500.0000 4,500.00 1.000 4,500.00 1.000 4,500 020 STORM WATER ANNUAL REPORT EA 2,000.0000 8,000.00 0.000 0 021 MOVE-IN/MOVE-OUT (TEMPORARY EROSION EA 1,290.0000 14,190.00 0.000 0 CONTROL) 022 TEMPORARY HYDRAULIC MULCH (BONDED FIBER SQYD 1.0500 72,135.00 0.000 0 MATRIX) PROGRAM CAS145 PAGE 2 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 TEMPORARY DRAINAGE INLET PROTECTION EA 375.0000 15,000.00 0.000 0 024 TEMPORARY FIBER ROLL LF 4.4700 225,288.00 0.000 0 025 TEMPORARY SILT FENCE LF 3.8800 128,040.00 0.000 0 026 TEMPORARY CONSTRUCTION ENTRANCE EA 6,500.0000 26,000.00 0.000 0 027 STREET SWEEPING LS 300,000.0000 300,000.00 0.000 0 028 TEMPORARY CONCRETE WASHOUT LS 50,000.0000 50,000.00 0.000 0 029 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 10.0000 7,000.00 0.000 0 STRIPE (HAZARDOUS WASTE) 030 TREATED WOOD WASTE LB 1.5500 10,850.00 0.000 0 031 CLEARING AND GRUBBING (LS) LS 400,000.0000 400,000.00 0.000 0 032 ROADWAY EXCAVATION CY 19.0000 292,600.00 0.000 0 033 STRUCTURE EXCAVATION (BRIDGE) CY 125.0000 493,125.00 0.000 0 (F) 034 STRUCTURE EXCAVATION (RETAINING WALL) CY 100.0000 662,400.00 0.000 0 (F) 035 STRUCTURE EXCAVATION (SOLDIER PILE WALL) CY 23.0000 3,910.00 0.000 0 (F) 036 STRUCTURE BACKFILL (BRIDGE) CY 170.0000 640,900.00 0.000 0 (F) 037 STRUCTURE BACKFILL (RETAINING WALL) CY 90.0000 865,800.00 0.000 0 (F) 038 STRUCTURE BACKFILL (SOLDIER PILE WALL) CY 30.0000 270.00 0.000 0 (F) 039 CONCRETE BACKFILL (SOLDIER PILE WALL) CY 950.0000 61,750.00 0.000 0 (F) 040 LEAN CONCRETE BACKFILL CY 385.0000 34,265.00 0.000 0 (F) 041 IMPORTED BORROW (CY) CY 27.2500 5,095,750.00 0.000 0 042 ROCK MULCH SQFT 12.0000 17,040.00 0.000 0 043 ROCK BLANKET SQFT 21.0000 770,700.00 0.000 0 044 8" CORRUGATED HIGH DENSITY POLYETHYLENE LF 38.0000 26,220.00 0.000 0 PIPE CONDUIT 045 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 046 BONDED FIBER MATRIX (SQFT) SQFT 0.1500 95,850.00 0.000 0 047 ROLLED EROSION CONTROL PRODUCT (NETTING) SQFT 0.7600 191,520.00 0.000 0 048 FIBER ROLLS LF 4.5800 229,000.00 0.000 0 049 COMPOST (CY) CY 68.0300 268,718.50 0.000 0 PROGRAM CAS145 PAGE 3 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 050 CLASS 2 AGGREGATE BASE (CY) CY 65.0000 1,430,000.00 0.000 0 051 HOT MIX ASPHALT (TYPE A) TON 114.0000 2,394,000.00 0.000 0 052 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 135.0000 445,500.00 0.000 0 053 PLACE HOT MIX ASPHALT DIKE (TYPE C) LF 3.5000 455.00 0.000 0 054 PLACE HOT MIX ASPHALT DIKE (TYPE E) LF 3.5000 19,075.00 0.000 0 055 PLACE HOT MIX ASPHALT DIKE (TYPE F) LF 3.5000 805.00 0.000 0 056 TACK COAT TON 1.0000 21.00 0.000 0 057 REMOVE ASPHALT CONCRETE PAVEMENT (SQFT) SQFT 0.6000 52,020.00 0.000 0 058 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.0000 7,800.00 0.000 0 059 JOINTED PLAIN CONCRETE PAVEMENT CY 450.0000 796,500.00 0.000 0 060 JOINTED PLAIN CONCRETE PAVEMENT (COLORED CY 750.0000 150,000.00 0.000 0 AND TEXTURED) 061 ISOLATION JOINT SEAL (ASPHALT RUBBER) LF 9.3200 30,662.80 0.000 0 062 GROUND ANCHOR (SUBHORIZONTAL) EA 8,700.0000 139,200.00 0.000 0 063 MECHANICALLY STABILIZED EMBANKMENT SQFT 165.0000 2,698,080.00 0.000 0 (F) 064 STEEL SOLDIER PILE (2 - HP 10 X 57) LF 128.0000 27,904.00 0.000 0 065 STEEL SOLDIER PILE (2 - W 12 X 106) LF 312.0000 29,640.00 0.000 0 066 STEEL SOLDIER PILE (2 - HP 12 X 84) LF 199.0000 36,616.00 0.000 0 067 36" DRILLED HOLE LF 115.0000 35,650.00 0.000 0 068 42" DRILLED HOLE LF 120.0000 21,600.00 0.000 0 069 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 225.0000 5,856,300.00 0.000 0 070 60" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 1,500.0000 123,000.00 0.000 0 (SIGN FOUNDATION) 071 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 1,000.0000 1,000,000.00 0.000 0 (F) 072 STRUCTURAL CONCRETE, DEADMAN ANCHOR CY 2,200.0000 426,800.00 0.000 0 (F) 073 STRUCTURAL CONCRETE, BRIDGE CY 1,700.0000 4,284,000.00 0.000 0 (F) 074 STRUCTURAL CONCRETE, BRIDGE (POLYMER CY 1,200.0000 1,230,000.00 0.000 0 (F) FIBER) 075 STRUCTURAL CONCRETE, RETAINING WALL CY 1,400.0000 4,838,400.00 0.000 0 (F) 076 STRUCTURAL CONCRETE, WALL FACING CY 2,500.0000 200,000.00 0.000 0 (F) PROGRAM CAS145 PAGE 4 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 077 STRUCTURAL CONCRETE, BARRIER SLAB CY 1,550.0000 561,100.00 0.000 0 (F) 078 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE CY 1,600.0000 1,356,800.00 0.000 0 (F) N MODIFIED) 079 STRUCTURAL CONCRETE, DRAINAGE INLET CY 3,000.0000 370,200.00 0.000 0 (F) 080 CONCRETE SURFACE TEXTURE (WESTERN SQFT 19.0000 644,879.00 0.000 0 BASALT) 081 FURNISH PRECAST PRESTRESSED CONCRETE EA 34,980.0000 34,980.00 0.000 0 WIDE FLANGE GIRDER (70'-80') 082 FURNISH PRECAST PRESTRESSED CONCRETE EA 37,830.0000 567,450.00 0.000 0 WIDE FLANGE GIRDER (80'-90') 083 FURNISH PRECAST PRESTRESSED CONCRETE EA 40,270.0000 161,080.00 0.000 0 WIDE FLANGE GIRDER (90'-100') 084 FURNISH PRECAST PRESTRESSED CONCRETE EA 51,360.0000 667,680.00 0.000 0 WIDE FLANGE GIRDER (120'-130') 085 FURNISH PRECAST PRESTRESSED CONCRETE EA 53,230.0000 106,460.00 0.000 0 WIDE FLANGE GIRDER (130'-140') 086 FURNISH PRECAST PRESTRESSED CONCRETE EA 43,120.0000 86,240.00 0.000 0 WIDE FLANGE GIRDER (100'-110') 087 ERECT PRECAST PRESTRESSED CONCRETE EA 13,840.0000 512,080.00 0.000 0 GIRDER 088 JOINT SEAL (MR 1") LF 92.0000 52,164.00 0.000 0 089 BAR REINFORCING STEEL (WALL FACING) LB 1.9600 18,090.80 0.000 0 (F) 090 BAR REINFORCING STEEL (BRIDGE) LB 0.9500 1,262,455.00 0.000 0 (F) 091 BAR REINFORCING STEEL (RETAINING WALL) LB 1.7500 999,075.00 0.000 0 (F) 092 BAR REINFORCING STEEL (GALVANIZED) LB 5.0000 2,630.00 0.000 0 (F) 093 BAR REINFORCING STEEL (DEADMAN ANCHOR) LB 2.0500 30,862.75 0.000 0 (F) 094 FURNISH SIGN STRUCTURE (VERSATILE TRUSS) LB 6.0000 375,000.00 0.000 0 095 INSTALL SIGN STRUCTURE (VERSATILE TRUSS) LB 0.6000 37,500.00 0.000 0 096 ALUMINUM WALKWAY GRATING (VERSATILE SQFT 130.0000 15,600.00 0.000 0 TRUSS) 097 REMOVE SIGN STRUCTURE (EA) EA 10,000.0000 20,000.00 0.000 0 098 TIMBER LAGGING MFBM 11,200.0000 89,600.00 0.000 0 (F) 099 CLEAN AND PAINT STEEL SOLDIER PILING LS 88,000.0000 88,000.00 0.000 0 100 BRIDGE REMOVAL, LOCATION A LS 275,000.0000 275,000.00 0.000 0 101 BRIDGE REMOVAL, LOCATION B LS 175,000.0000 175,000.00 0.000 0 102 24" ALTERNATIVE PIPE CULVERT LF 150.0000 459,000.00 0.000 0 103 18" REINFORCED CONCRETE PIPE LF 150.0000 46,500.00 0.000 0 PROGRAM CAS145 PAGE 5 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 104 24" REINFORCED CONCRETE PIPE LF 250.0000 127,500.00 0.000 0 105 12" DOWNDRAIN SLIP JOINT EA 1,100.0000 4,400.00 0.000 0 106 12" ALTERNATIVE PIPE DOWNDRAIN LF 100.0000 6,200.00 0.000 0 107 12" STEEL FLARED END SECTION EA 750.0000 3,000.00 0.000 0 108 24" ALTERNATIVE FLARED END SECTION EA 900.0000 14,400.00 0.000 0 109 REMOVE CULVERT (LF) LF 125.0000 27,500.00 0.000 0 110 REMOVE DOWNDRAIN (EA) EA 700.0000 700.00 0.000 0 111 REMOVE INLET EA 1,000.0000 2,000.00 0.000 0 112 REMOVE HEADWALL EA 1,500.0000 3,000.00 0.000 0 113 REMOVE FLARED END SECTION (EA) EA 1,000.0000 6,000.00 0.000 0 114 ADJUST INLET EA 3,500.0000 10,500.00 0.000 0 115 CONCRETE (CONCRETE APRON) CY 800.0000 3,200.00 0.000 0 116 ROCK SLOPE PROTECTION (60 LB, CLASS II, CY 250.0000 32,500.00 0.000 0 METHOD B) (CY) 117 ROCK SLOPE PROTECTION FABRIC (CLASS 8) SQYD 3.0000 1,080.00 0.000 0 118 MINOR CONCRETE (CURB) (CY) CY 1,331.9100 306,339.30 0.000 0 119 MINOR CONCRETE (GUTTER) (LF) LF 114.8500 43,757.85 0.000 0 120 DETECTABLE WARNING SURFACE SQFT 40.6000 13,398.00 0.000 0 121 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 122 MINOR CONCRETE (CURB AND GUTTER) CY 880.0000 264,000.00 0.000 0 123 MINOR CONCRETE (DRIVEWAY) CY 1,265.0000 7,590.00 0.000 0 124 MINOR CONCRETE (SIDEWALK) CY 750.0000 607,500.00 0.000 0 125 MINOR CONCRETE (TEXTURED PAVING) CY 1,050.0000 640,500.00 0.000 0 126 MINOR CONCRETE (CURB RAMP) CY 3,100.0000 68,200.00 0.000 0 127 REMOVE CONCRETE SIDEWALK (SQYD) SQYD 9.0000 11,070.00 0.000 0 128 REMOVE CONCRETE ISLAND (PORTIONS) (SQYD) SQYD 21.0000 30,870.00 0.000 0 129 REMOVE CONCRETE (CURB AND GUTTER) LF 10.0000 9,500.00 0.000 0 130 MISCELLANEOUS IRON AND STEEL LB 1.0000 9,321.00 0.000 0 (F) PROGRAM CAS145 PAGE 6 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 131 MISCELLANEOUS METAL (BRIDGE) LB 15.0000 69,360.00 0.000 0 (F) 132 MISCELLANEOUS METAL (TIE ROD) LB 15.0000 276,225.00 0.000 0 (F) 133 SURVEY MONUMENT (TYPE A) EA 3,000.0000 3,000.00 0.000 0 134 PREPARE AND STAIN CONCRETE SQFT 300.0000 32,100.00 0.000 0 135 FENCE (TYPE BW, METAL POST) LF 16.5000 107,085.00 0.000 0 136 8' WIRE MESH GATE EA 2,100.0000 4,200.00 0.000 0 137 REMOVE FENCE LF 6.0000 32,220.00 0.000 0 138 REMOVE PAVEMENT MARKER EA 2.0000 800.00 0.000 0 139 DELINEATOR (CLASS 1) EA 85.0000 1,700.00 0.000 0 140 PAVEMENT MARKER (RETROREFLECTIVE) EA 8.0000 5,760.00 0.000 0 141 REMOVE ROADSIDE SIGN (WOOD POST) EA 135.0000 270.00 0.000 0 142 FURNISH LAMINATED PANEL SIGN (1"-TYPE A) SQFT 31.0000 9,920.00 0.000 0 143 FURNISH LAMINATED PANEL SIGN (1"-TYPE B) SQFT 32.0000 3,840.00 0.000 0 144 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.0000 8,190.00 0.000 0 (0.063"-UNFRAMED) 145 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 13.5000 5,130.00 0.000 0 (0.080"-UNFRAMED) 146 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 21.7500 1,957.50 0.000 0 (0.063"-FRAMED) 147 FURNISH SINGLE SHEET ALUMINUM SIGN SQFT 22.5000 1,732.50 0.000 0 (0.080"-FRAMED) 148 ROADSIDE SIGN - ONE POST EA 715.0000 60,060.00 0.000 0 149 ROADSIDE SIGN - TWO POST EA 1,075.0000 7,525.00 0.000 0 150 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 95.0000 665.00 0.000 0 METHOD) 151 INSTALL ROADSIDE SIGN (LAMINATED WOOD EA 2,025.0000 2,025.00 0.000 0 BOX POST) 152 FURNISH LAMINATED WOOD BOX POST (TYPE M) EA 3,300.0000 6,600.00 0.000 0 153 MIDWEST GUARDRAIL SYSTEM (STEEL POST) LF 67.0000 14,070.00 0.000 0 154 VEGETATION CONTROL (MINOR CONCRETE) SQYD 140.0000 19,600.00 0.000 0 155 CHAIN LINK RAILING (TYPE 3) LF 315.0000 203,805.00 0.000 0 156 TUBULAR BICYCLE RAILING LF 210.0000 248,010.00 0.000 0 (F) 157 CABLE RAILING LF 65.0000 40,430.00 0.000 0 (F) PROGRAM CAS145 PAGE 7 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 158 TRANSITION RAILING (TYPE AGT) EA 5,800.0000 5,800.00 0.000 0 159 END ANCHOR ASSEMBLY (TYPE SFT-M) EA 1,700.0000 1,700.00 0.000 0 160 ALTERNATIVE IN-LINE TERMINAL TL-3 EA 5,000.0000 10,000.00 0.000 0 161 ALTERNATIVE CRASH CUSHION TL-3 EA 40,850.0000 81,700.00 0.000 0 162 CONCRETE BARRIER (TYPE 60MD) LF 275.0000 141,625.00 0.000 0 163 CONCRETE BARRIER (TYPE 60MGF) LF 350.0000 87,500.00 0.000 0 164 CONCRETE BARRIER (TYPE 732SW) LF 700.0000 171,010.00 0.000 0 (F) 165 CONCRETE BARRIER (TYPE 732SW MODIFIED) LF 575.0000 653,200.00 0.000 0 (F) 166 CONCRETE BARRIER (TYPE 842A MODIFIED) LF 275.0000 296,450.00 0.000 0 (F) 167 CONCRETE BARRIER (TYPE 836A MODIFIED) LF 300.0000 16,800.00 0.000 0 (F) 168 CONCRETE BARRIER (TYPE 836B) LF 325.0000 65,650.00 0.000 0 (F) 169 CONCRETE BARRIER (TYPE 836 MODIFIED) LF 275.0000 195,250.00 0.000 0 (F) 170 CONCRETE BARRIER TRANSITION LF 325.0000 16,250.00 0.000 0 171 CONCRETE BARRIER (TYPE 842B) LF 325.0000 190,125.00 0.000 0 (F) 172 REMOVE GUARDRAIL LF 21.0000 9,450.00 0.000 0 173 REMOVE CONCRETE BARRIER LF 45.0000 13,500.00 0.000 0 174 THERMOPLASTIC PAVEMENT MARKING (ENHANCED SQFT 8.0000 49,760.00 0.000 0 WET NIGHT VISIBILITY) 175 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 650.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 6-1) 176 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 5,490.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7) 177 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 2,600.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12) 178 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 56,250.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 179 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 240.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 8-4) 180 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.0000 6,360.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 181 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 3,300.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) PROGRAM CAS145 PAGE 8 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 182 12" THERMOPLASTIC TRAFFIC STRIPE LF 3.0000 6,630.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) 183 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 1.5000 11,745.00 0.000 0 184 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 10.0000 2,000.00 0.000 0 185 LIGHTING SYSTEM LS 1,310,000.0000 1,310,000.00 0.000 0 186 RAMP METERING SYSTEM LS 141,200.0000 141,200.00 0.000 0 187 CHANGEABLE MESSAGE SIGN SYSTEM LS 301,700.0000 301,700.00 0.000 0 188 CAMERA SYSTEMS LS 30,100.0000 30,100.00 0.000 0 189 MODIFYING LIGHTING SYSTEMS LS 193,300.0000 193,300.00 0.000 0 190 MODIFYING SIGNAL AND LIGHTING SYSTEMS LS 365,500.0000 365,500.00 0.000 0 191 MODIFYING CHANGEABLE MESSAGE SIGN LS 38,900.0000 38,900.00 0.000 0 SYSTEMS 192 REMOVING LIGHTING SYSTEMS LS 56,800.0000 56,800.00 0.000 0 193 REMOVING TRAFFIC MONITORING STATIONS LS 3,000.0000 3,000.00 0.000 0 194 REMOVING CHANGEABLE MESSAGE SIGN SYSTEMS LS 5,175.0000 5,175.00 0.000 0 195 4" CONDUIT (BRIDGE) LS 125,900.0000 125,900.00 0.000 0 196 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 197 12" RUMBLE STRIP (ASPHALT CONCRETE STA 1,000.0000 4,000.00 0.000 0 PAVEMENT) 198 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 199 END OF QUEUE MONITORING AND WARNING WITH EA 1,315.0000 3,945.00 0.000 0 TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY PROGRAM CAS145 PAGE 9 DATE 08/26/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-487404 TIME 08:37 AM ESTIMATE NO. 002 BID OPENING 11/14/24 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/25 R.E. NAME: AMIR ZAMANIAN DATE OF THIS ESTIMATE 08/26/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 23,400.00 29,400.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 3,450.90 3,450.90 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 26,850.90 32,850.90 200 MOBILIZATION LS 6,720,000.0000 6,720,000.00 0.000 0 ORIGINAL CONTRACT AMOUNT 66,170,188.00 TOTAL WORK COMPLETED 26,850.90 32,850.90 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 26,850.90 32,850.90 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 200 MOBILIZATION 6,617,018.80 6,720,000.00 102,981.20 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 02/12/25 420 00/00/00 00/00/00 04/29/27 0 0 0 0 0% 0% PROGRESS IS SATISFACTORY AMIR ZAMANIAN RESIDENT ENGINEER