PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/10/08 EST. NO.08 TIME 07:14 AM R.E. NAME: HADDADIN, HAIDAR 06-494604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0019 919.82 E.W. @ F.A.(+) 111407 N 0020.1 0022 944.92 102307 N 0004.2 0023 938.24 111507 N 0021.2 0024 920.66 110807 N 375303 006 0002 668.78 E.W. @ F.A.(+) 021108 N 0015.1 0004 53.50 060408 N 375300 4,445.92 TOTAL THIS ESTIMATE 35,793.02 TOTAL PREVIOUS ESTIMATE 40,238.94 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/10/08 EST. NO.08 TIME 07:14 AM R.E. NAME: HADDADIN, HAIDAR 06-494604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE OUT OF STATE INSPECT -5,000.00 03 MISS CEM 2402 -5,000.00 06 RECD CEM 2402 5,000.00 07 0.00 -5,000.00 TOTAL DEDUCTIONS 0.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 06/10/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-494604 TIME 07:14 AM ESTIMATE NO. 08 BID OPENING 06/12/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/05/08 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 06/10/08 LOCATION FINAL ESTIMATE 06-FRE-43-5.3/ .0 -------------- TEICHERT CONSTRUCTION IN FRESNO COUNTY NEAR SELMA FROM P.O. BOX 400 0.4 KM SOUTH OF CONEJO AVENUE TO KINGSBURG, CA 93631 0.3 KM NORTH OF CONEJO AVENUE FED. AID NO. ACST-P043(36)E ,PH-P043(36)E INSTALL TRAFFIC SIGNAL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 5,500.0000 5,500.00 1.000 5,500.00 02 PREPARE STORM WATER POLLUTION LS 1,900.0000 1,900.00 1.000 1,900.00 PREVENTION PLAN 03 TEMPORARY CONSTRUCTION ENTRANCE EA 5,300.0000 5,300.00 0.000 0.00 04 STREET SWEEPING LS 24,000.0000 24,000.00 1.000 24,000.00 05 TEMPORARY CONCRETE WASHOUT (PORTABLE) LS 600.0000 600.00 1.000 600.00 06 CONSTRUCTION AREA SIGNS LS 1,600.0000 1,600.00 1.000 1,600.00 S) 07 TRAFFIC CONTROL SYSTEM LS 51,355.0000 51,355.00 1.000 51,355.00 S) 08 PORTABLE CHANGEABLE MESSAGE SIGN LS 17,000.0000 17,000.00 1.000 17,000.00 S) 09 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 8.8000 6,424.00 423.823 3,729.64 S) STRIPE 10 REMOVE TRAFFIC STRIPE M 6.6000 5,346.00 178.000 1,174.80 S) 11 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 82.0000 1,148.00 9.840 806.88 S) 12 REMOVE ROADSIDE SIGN EA 100.0000 600.00 6.000 600.00 13 ADJUST MONUMENT TO GRADE EA 500.0000 500.00 1.000 500.00 14 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 16.0000 10,720.00 670.000 10,720.00 S) 15 CLEARING AND GRUBBING LS 2,500.0000 2,500.00 1.000 2,500.00 16 ROADWAY EXCAVATION M3 26.0000 51,480.00 1,980.000 51,480.00 17 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 1.000 2,500.00 18 IMPORTED MATERIAL (SHOULDER BACKING) TONN 45.0000 12,150.00 270.000 12,150.00 19 EROSION CONTROL (TYPE D) HA 9,500.0000 16,150.00 1.680 15,960.00 20 CLASS 2 AGGREGATE BASE M3 98.0000 94,080.00 960.000 94,080.00 21 ASPHALT CONCRETE (TYPE A) TONN 95.0000 312,550.00 2,916.470 277,064.65 22 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 40.0000 12,000.00 300.000 12,000.00 AREA) PROGRAM CAS145 PAGE 2 DATE 06/10/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-494604 TIME 07:14 AM ESTIMATE NO. 08 BID OPENING 06/12/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/05/08 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 06/10/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 80.0000 3,600.00 63.500 5,080.00 24 ASPHALTIC EMULSION (PAINT BINDER) TONN 300.0000 3,600.00 4.690 1,407.00 25 FURNISH SINGLE SHEET ALUMINUM SIGN M2 160.0000 2,080.00 12.240 1,958.40 S) (1.6 MM-UNFRAMED) 26 ROADSIDE SIGN - ONE POST EA 280.0000 560.00 2.000 560.00 27 THERMOPLASTIC PAVEMENT MARKING M2 55.0000 6,050.00 109.750 6,036.25 S) 28 THERMOPLASTIC TRAFFIC STRIPE M 1.7000 1,292.00 1,560.000 2,652.00 S) (SPRAYABLE) 29 100 MM THERMOPLASTIC TRAFFIC STRIPE M 2.2000 7,942.00 1,900.730 4,181.61 3,801.460 8,363.21 S) 30 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.3000 3,036.00 355.000 1,171.50 S) 31 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.5000 2,520.00 319.000 1,435.50 S) 32 SIGNAL AND LIGHTING LS 190,000.0000 190,000.00 1.000 190,000.00 S) PROGRAM CAS145 PAGE 3 DATE 06/10/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-494604 TIME 07:14 AM ESTIMATE NO. 08 BID OPENING 06/12/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/05/08 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 06/10/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,181.61 805,884.83 ADJUSTMENT OF COMPENSATION 0.00 15,835.95 EXTRA WORK 4,445.92 24,402.99 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 8,627.53 846,123.77 33 MOBILIZATION LS 80,000.0000 80,000.00 1.000 80,000.00 ORIGINAL CONTRACT AMOUNT 936,083.00 TOTAL WORK COMPLETED 8,627.53 926,123.77 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -5,000.00 TOTAL 8,627.53 921,123.77 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/31/07 70 10/09/07 10/09/07 03/05/08 75 24 10 0 100% 100% HADDADIN, HAIDAR RESIDENT ENGINEER PROGRAM CAS145 DATE 06/10/08