PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/22/06 EST. NO.06 TIME 06:29 AM R.E. NAME: HADDADIN, HAIDAR 06-497404 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0050 460.92 E.W. @ F.A.(+) 040706 N 050 0 0052-1 -25.61 051006 N 052 0 DAO CORRECTING ENTRY 0055 254.38 062706 N 055 0 005 0001 31,938.85 A.C. @ U.P.(+) 082106 N 1-ABC0 32,628.54 TOTAL THIS ESTIMATE 55,240.78 TOTAL PREVIOUS ESTIMATE 87,869.32 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/22/06 EST. NO.06 TIME 06:29 AM R.E. NAME: HADDADIN, HAIDAR 06-497404 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- LABOR COMPLIANCE VIOLATION MISS PYRL -10,000.00 04 MISS PYRL -10,000.00 05 RECD PYRL #4 & 5 20,000.00 06 20,000.00 0.00 TOTAL DEDUCTIONS 20,000.00 0.00 PROGRAM CAS145 PAGE 1 DATE 08/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-497404 TIME 06:29 AM ESTIMATE NO. 06 BID OPENING 07/06/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 08/22/06 LOCATION PROGRESS ESTIMATE 06-FRE-198-14.9/26.8 ----------------- LEE'S PAVING INC. IN FRESNO COUNTY NEAR HARRIS RANCH 1212 N. PLAZA DRIVE ABOUT 22 KM EAST COALINGA AT ROUTE VISALIA, CA 93291 5 AND 198 SEPARATION FED. AID NO. ACST-X019(19)N ,PH-X019(19)N CONSTRUCT TWO LOOP ON RAMP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 1,850.0000 1,850.00 0.750 1,387.50 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 100,000.0000 100,000.00 0.317 31,700.00 0.925 92,500.00 03 TEMPORARY CONCRETE WASHOUT FACILITY EA 2,700.0000 2,700.00 2.000 5,400.00 2.166 5,848.20 04 TEMPORARY CONSTRUCTION ENTRANCE EA 41,000.0000 82,000.00 3.000 123,000.00 05 CONSTRUCTION AREA SIGNS LS 13,432.0000 13,432.00 0.750 10,074.00 S) 06 TRAFFIC CONTROL SYSTEM LS 150,000.0000 150,000.00 0.292 43,800.00 0.900 135,000.00 S) 07 TYPE III BARRICADE EA 100.0000 600.00 0.000 0.00 S) 08 TEMPORARY TRAFFIC STRIPE (TAPE) M 6.8800 18,438.40 2,390.000 16,443.20 S) 09 CHANNELIZER (SURFACE MOUNTED) EA 60.0000 3,720.00 42.000 2,520.00 S) 10 TEMPORARY PAVEMENT MARKER EA 7.0400 1,126.40 158.000 1,112.32 S) 11 PORTABLE CHANGEABLE MESSAGE SIGN LS 36,000.0000 36,000.00 0.292 10,512.00 0.900 32,400.00 S) 12 TEMPORARY RAILING (TYPE K) M 55.0000 119,900.00 2,189.200 120,406.00 13 TEMPORARY CRASH CUSHION MODULE EA 175.0000 3,850.00 22.000 3,850.00 S) 14 ABANDON CULVERT EA 1,850.0000 3,700.00 2.000 3,700.00 15 OBLITERATE SURFACING M2 12.0000 5,760.00 0.000 0.00 16 REMOVE FLARED END SECTION EA 700.0000 4,200.00 3.000 2,100.00 17 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 11.5800 13,085.40 1,144.000 13,247.52 S) STRIPE 18 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 3.1500 1,165.50 286.000 900.90 S) 19 REMOVE THERMOPLASTIC PAVEMENT MARKING M2 26.3195 107.91 0.000 0.00 S) 20 REMOVE PAVEMENT MARKER EA 1.8300 292.80 158.000 289.14 S) 21 REMOVE ROADSIDE SIGN EA 125.0000 750.00 0.000 0.00 22 REMOVE ASPHALT CONCRETE DIKE M 17.0000 7,820.00 283.150 4,813.55 432.620 7,354.54 PROGRAM CAS145 PAGE 2 DATE 08/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-497404 TIME 06:29 AM ESTIMATE NO. 06 BID OPENING 07/06/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 08/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE DOWNDRAIN EA 550.0000 2,200.00 3.000 1,650.00 24 SALVAGE METAL BEAM GUARD RAILING M 26.0000 16,640.00 331.470 8,618.22 617.220 16,047.72 S) 25 RESET ROADSIDE SIGN EA 225.0000 1,350.00 0.000 0.00 26 RELOCATE ROADSIDE SIGN EA 225.0000 900.00 0.000 0.00 27 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 43.5000 8,700.00 58.500 2,544.75 28 CLEARING AND GRUBBING LS 4,000.0000 4,000.00 1.000 4,000.00 29 ROADWAY EXCAVATION M3 30.5000 329,400.00 430.500 13,130.25 9,065.500 276,497.75 30 LEAD COMPLIANCE PLAN LS 1,000.0000 1,000.00 1.000 1,000.00 31 SAND BACKFILL M3 65.0000 2,015.00 29.053 1,888.45 32 DITCH EXCAVATION M3 25.0000 3,000.00 0.000 0.00 33 IMPORTED BORROW M3 19.0000 1,031,700.00 50,128.810 952,447.39 34 EROSION CONTROL (BLANKET) M2 3.2000 2,240.00 0.000 0.00 S) 35 STRAW (EROSION CONTROL) TONN 460.0000 5,060.00 0.000 0.00 S) 36 FIBER (EROSION CONTROL) KG 1.0000 3,870.00 0.000 0.00 S) 37 FIBER ROLLS M 7.8000 5,616.00 0.000 0.00 S) 38 PURE LIVE SEED (EROSION CONTROL) KG 80.0000 1,680.00 0.000 0.00 S) (TYPE 1) 39 PURE LIVE SEED (EROSION CONTROL) KG 136.0000 4,488.00 0.000 0.00 S) (TYPE 2) 40 COMMERCIAL FERTILIZER (EROSION CONTROL) KG 1.0000 930.00 0.000 0.00 S) 41 STABILIZING EMULSION (EROSION CONTROL) KG 3.0000 2,790.00 0.000 0.00 S) 42 CLASS 2 AGGREGATE SUBBASE M3 52.0000 203,320.00 50.000 2,600.00 3,861.650 200,805.80 43 CLASS 2 AGGREGATE BASE M3 54.0000 316,980.00 200.000 10,800.00 5,557.980 300,130.92 44 ASPHALT CONCRETE (TYPE A) TONN 70.0000 714,000.00 4,992.460 349,472.20 8,394.413 587,608.91 45 PLACE ASPHALT CONCRETE DIKE M 4.2500 6,375.00 0.000 0.00 46 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 132.0000 4,620.00 0.000 0.00 AREA) 47 ASPHALTIC EMULSION (PAINT BINDER) TONN 755.0000 10,570.00 1.680 1,268.40 1.925 1,453.38 48 ROADSIDE SIGN - ONE POST EA 225.0000 8,100.00 0.000 0.00 49 ROADSIDE SIGN - TWO POST EA 500.0000 1,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 08/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-497404 TIME 06:29 AM ESTIMATE NO. 06 BID OPENING 07/06/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 08/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 600 MM REINFORCED CONCRETE PIPE M 244.0000 16,836.00 2.000 488.00 69.000 16,836.00 51 750 MM REINFORCED CONCRETE PIPE M 307.0000 10,745.00 32.700 10,038.90 52 JACKED 750 MM REINFORCED CONCRETE PIPE M 1,345.0000 59,180.00 -0.800 -1,076.00 43.200 58,104.00 53 150 MM CORRUGATED STEEL PIPE DOWNDRAIN M 175.0000 5,950.00 0.000 0.00 (2.01 MM THICK) 54 300 MM CORRUGATED STEEL PIPE DOWNDRAIN M 200.0000 2,800.00 0.000 0.00 (2.01 MM THICK) 55 300 MM ENTRANCE TAPER EA 300.0000 600.00 0.000 0.00 56 300 MM STEEL FLARED END SECTION EA 300.0000 600.00 0.000 0.00 57 600 MM CONCRETE FLARED END SECTION EA 500.0000 3,000.00 6.000 3,000.00 6.000 3,000.00 58 750 MM CONCRETE FLARED END SECTION EA 600.0000 5,400.00 9.000 5,400.00 9.000 5,400.00 59 ROCK SLOPE PROTECTION (LIGHT, METHOD B) M3 450.0000 9,000.00 0.000 0.00 60 ROCK SLOPE PROTECTION FABRIC M2 4.0000 272.00 0.000 0.00 61 MINOR CONCRETE (CURB) M 45.0000 3,015.00 0.000 0.00 62 MINOR CONCRETE (TEXTURED PAVING) M2 50.0000 6,000.00 0.000 0.00 63 DELINEATOR (CLASS 1) EA 50.0000 7,000.00 0.000 0.00 64 OBJECT MARKER (TYPE K) EA 50.0000 300.00 0.000 0.00 65 METAL BEAM GUARD RAILING (STEEL POST) EA 63.0000 24,570.00 361.950 22,802.85 361.950 22,802.85 S) 66 TRANSITION RAILING (TYPE WB) EA 2,650.0000 10,600.00 2.000 5,300.00 2.000 5,300.00 S) 67 TERMINAL SYSTEM (TYPE ET) EA 2,400.0000 4,800.00 0.000 0.00 S) 68 TERMINAL SYSTEM (TYPE SRT) EA 2,200.0000 11,000.00 0.000 0.00 S) 69 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 600.0000 3,000.00 4.000 2,400.00 4.000 2,400.00 S) 70 CRASH CUSHION (TYPE CAT) EA 5,400.0000 10,800.00 2.000 10,800.00 2.000 10,800.00 S) 71 CRASH CUSHION (TYPE CAT) BACKUP EA 400.0000 800.00 2.000 800.00 2.000 800.00 S) 72 THERMOPLASTIC PAVEMENT MARKING M2 85.2000 7,242.00 0.000 0.00 S) 73 THERMOPLASTIC TRAFFIC STRIPE M 0.7600 5,190.80 0.000 0.00 S) (SPRAYABLE) 74 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.4800 542.40 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 75 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.5000 195.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 76 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.4600 4,177.60 0.000 0.00 S) PROGRAM CAS145 PAGE 4 DATE 08/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-497404 TIME 06:29 AM ESTIMATE NO. 06 BID OPENING 07/06/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 08/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 SIGNAL AND LIGHTING (LOCATION 1) LS 147,225.0000 147,225.00 0.550 80,973.75 0.550 80,973.75 S) 78 SIGNAL AND LIGHTING (LOCATION 2) LS 151,700.0000 151,700.00 0.550 83,435.00 0.550 83,435.00 S) 79 MODIFY LIGHTING LS 135,427.0000 135,427.00 0.150 20,314.05 0.650 88,027.55 S) PROGRAM CAS145 PAGE 5 DATE 08/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 06-497404 TIME 06:29 AM ESTIMATE NO. 06 BID OPENING 07/06/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/06 R.E. NAME: HADDADIN, HAIDAR DATE OF THIS ESTIMATE 08/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 716,752.27 3,306,126.44 ADJUSTMENT OF COMPENSATION 31,938.85 31,938.85 EXTRA WORK 689.69 55,930.47 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 749,380.81 3,393,995.76 80 MOBILIZATION LS 250,000.0000 250,000.00 1.000 250,000.00 ORIGINAL CONTRACT AMOUNT 4,161,010.21 TOTAL WORK COMPLETED 749,380.81 3,643,995.76 MATERIALS ON HAND ON SITE 62,828.51 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 20,000.00 0.00 TOTAL 769,380.81 3,706,824.27 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/15/05 120 03/13/06 01/18/06 09/26/06 98 50 4 0 84% 79% PROGRESS IS SATISFACTORY HADDADIN, HAIDAR RESIDENT ENGINEER PROGRAM CAS145 PAGE 26 DATE 08/22/06