PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 01/24/05 EST. NO.15 TIME 02:36 PM R.E. NAME: CHOU, MICHAEL 07-002594 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0219 168.26 E.W. @ F.A.(+) 120604 N 0189 0 0220 168.26 120804 N 0190 0 0221 168.26 120904 N 0191 0 0222 168.26 121204 N 0192 0 0223 168.26 121304 N 0193 0 0224 168.26 121404 N 0194 0 0225 168.26 121504 N 0195 0 0226 168.26 121604 N 0196 0 0227 168.26 121904 N 0197 0 0228 168.26 122004 N 0198 0 003 0001 914.30 E.W. @ F.A.(+) 122203 N 0001 0 0005 977.02 020904 N 0005 0 0006 977.02 021004 N 0006 0 0007 1,885.76 021104 N 0007 0 0008 1,669.30 021204 N 0008 0 0009 1,063.64 021604 N 0009 0 0010 2,923.80 021704 N 0010 0 0011 457.15 012404 N 0003 0 007 0001-4 1,987.50 E.W. @ F.A.(+) 040104 N 0001 0 DAO CORRECTING ENTRY 0002-1 -660.00 070904 N 0002 0 DAO CORRECTING ENTRY 0002-2 600.00 070904 N 0002 0 DAO CORRECTING ENTRY 0006 1,262.50 070904 N 0003.2 0007 1,862.50 102904 N 0004.1 17,603.09 TOTAL THIS ESTIMATE 241,690.00 TOTAL PREVIOUS ESTIMATE 259,293.09 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 01/24/05 EST. NO.15 TIME 02:36 PM R.E. NAME: CHOU, MICHAEL 07-002594 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE 25% DUE UNAPPRVD CPM -148,043.85 03 25% DUE UNAPPRVD CPM 148,043.85 04 25% DUE TO LEAKOFCPM -173,718.75 14 0.00 -173,718.75 LABOR COMPLIANCE VIOLATION FEB PAYROLLS -10,000.00 05 FEB PAYROLLS 10,000.00 06 MAY -10,000.00 08 MAY 10,000.00 09 OCT -10,000.00 13 NOV -10,000.00 14 0.00 -20,000.00 TOTAL DEDUCTIONS 0.00 -193,718.75 PROGRAM CAS145 PAGE 1 DATE 01/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-002594 TIME 02:36 PM ESTIMATE NO. 15 BID OPENING 09/04/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/05 R.E. NAME: CHOU, MICHAEL DATE OF THIS ESTIMATE 01/24/05 LOCATION PROGRESS ESTIMATE 07-LA-101-13.2/14.9 ----------------- D.W. POWELL CONSTRUCTION, INC. IN LOS ANGELES COUNTY IN P.O. BOX 1406 LOS ANGELES AT VARIOUS LOCATIONS FONTANA, CA 92334-1406 FED. AID NO. ACNH-Q101(45)E SOUNDWALLS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,000.0000 3,000.00 0.650 1,950.00 02 TIME-RELATED OVERHEAD WDAY 3,800.0000 1,178,000.00 16.000 60,800.00 265.000 1,007,000.00 03 TEMPORARY FENCE (TYPE CL-1.8) M 20.0000 8,800.00 211.000 4,220.00 S) 04 PREPARE STORM WATER POLLUTION LS 1,000.0000 1,000.00 1.000 1,000.00 PREVENTION PLAN 05 WATER POLLUTION CONTROL LS 80,000.0000 80,000.00 0.050 4,000.00 0.810 64,800.00 06 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 0.850 12,750.00 S) 07 TRAFFIC CONTROL SYSTEM LS 250,000.0000 250,000.00 0.040 10,000.00 0.840 210,000.00 S) 08 TYPE III BARRICADE EA 100.0000 800.00 8.000 800.00 S) 09 TEMPORARY TRAFFIC STRIPE (TAPE) M 3.0000 22,140.00 7,502.220 22,506.66 S) 10 CHANNELIZER (SURFACE MOUNTED) EA 25.0000 3,000.00 120.000 3,000.00 S) 11 TEMPORARY PAVEMENT MARKER EA 2.0000 9,820.00 4,265.000 8,530.00 S) 12 TEMPORARY RAILING (TYPE K) M 22.0000 135,960.00 2,469.000 54,318.00 5,522.000 121,484.00 S) 13 TEMPORARY CRASH CUSHION MODULE EA 300.0000 36,000.00 112.000 33,600.00 S) 14 ABANDON CULVERT M 50.0000 1,350.00 27.000 1,350.00 15 REMOVE CHAIN LINK FENCE M 10.0000 1,200.00 262.000 2,620.00 S) 16 REMOVE METAL BEAM GUARD RAILING M 20.0000 24,800.00 1,231.000 24,620.00 S) 17 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 3.0000 9,720.00 3,182.710 9,548.13 S) STRIPE 18 REMOVE TRAFFIC STRIPE M 1.0000 6,780.00 3,596.680 3,596.68 S) 19 REMOVE PAVEMENT MARKER EA 1.0000 4,910.00 4,092.000 4,092.00 S) 20 REMOVE ROADSIDE SIGN EA 50.0000 500.00 10.000 500.00 21 REMOVE SIGN STRUCTURE EA 4,000.0000 8,000.00 2.000 8,000.00 22 REMOVE PIPE M 150.0000 12,450.00 4.500 675.00 PROGRAM CAS145 PAGE 2 DATE 01/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-002594 TIME 02:36 PM ESTIMATE NO. 15 BID OPENING 09/04/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/05 R.E. NAME: CHOU, MICHAEL DATE OF THIS ESTIMATE 01/24/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE INLET EA 600.0000 7,800.00 0.000 0.00 24 REMOVE RETAINING WALL M 300.0000 27,900.00 93.000 27,900.00 25 RELOCATE ROADSIDE SIGN EA 200.0000 600.00 0.000 0.00 26 ADJUST INLET EA 800.0000 800.00 0.000 0.00 27 REMOVE CONCRETE BARRIER M 70.0000 7,700.00 110.000 7,700.00 28 ACCESS OPENING, SOFFIT EA 1,000.0000 2,000.00 2.000 2,000.00 29 CAP INLET EA 800.0000 8,000.00 2.000 1,600.00 8.000 6,400.00 30 BRIDGE REMOVAL (PORTION), LOCATION A LS 40,000.0000 40,000.00 1.000 40,000.00 31 BRIDGE REMOVAL (PORTION), LOCATION B LS 18,000.0000 18,000.00 1.000 18,000.00 32 BRIDGE REMOVAL (PORTION), LOCATION C LS 15,000.0000 15,000.00 1.000 15,000.00 33 BRIDGE REMOVAL (PORTION), LOCATION D LS 25,000.0000 25,000.00 1.000 25,000.00 34 JACKING SUPERSTRUCTURE, LOCATION A LS 15,000.0000 15,000.00 1.000 15,000.00 35 JACKING SUPERSTRUCTURE, LOCATION B LS 10,000.0000 10,000.00 1.000 10,000.00 36 CLEARING AND GRUBBING LS 90,000.0000 90,000.00 0.900 81,000.00 37 ROADWAY EXCAVATION M3 40.0000 81,200.00 68.000 2,720.00 128.000 5,120.00 38 ROADWAY EXCAVATION (TYPE Z-2) M3 120.0000 183,600.00 1,524.000 182,880.00 (AERIALLY DEPOSITED LEAD) 39 LEAD COMPLIANCE PLAN LS 9,000.0000 9,000.00 1.000 9,000.00 40 STRUCTURE EXCAVATION (TYPE D) M3 100.0000 11,100.00 111.000 11,100.00 F) 41 STRUCTURE EXCAVATION, RETAINING WALL M3 40.0000 136,920.00 3,423.000 136,920.00 F) (SOUND WALL ) 42 STRUCTURE EXCAVATION (TYPE Z-2) M3 130.0000 410,800.00 3,160.000 410,800.00 F) (AERIALLY DEPOSITED LEAD) 43 STRUCTURE BACKFILL (BRIDGE) M3 100.0000 18,800.00 176.000 17,600.00 F) 44 STRUCTURE BACKFILL M3 350.0000 23,450.00 67.000 23,450.00 F) (COLUMN ISOLATION CASING) 45 STRUCTURE BACKFILL (RETAINING WALL) M3 100.0000 85,000.00 850.000 85,000.00 F) 46 STRUCTURE BACKFILL, RETAINING WALL M3 75.0000 237,075.00 3,161.000 237,075.00 F) (SOUND WALL ) 47 HIGHWAY PLANTING LS 50,000.0000 50,000.00 0.000 0.00 S) 48 PLANT ESTABLISHMENT WORK LS 7,000.0000 7,000.00 0.000 0.00 S) 49 IRRIGATION SYSTEM LS 110,000.0000 110,000.00 0.050 5,500.00 0.100 11,000.00 S) PROGRAM CAS145 PAGE 3 DATE 01/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-002594 TIME 02:36 PM ESTIMATE NO. 15 BID OPENING 09/04/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/05 R.E. NAME: CHOU, MICHAEL DATE OF THIS ESTIMATE 01/24/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 NPS 2.5 SUPPLY LINE (BRIDGE) M 150.0000 7,350.00 10.000 1,500.00 51 NPS 3 SUPPLY LINE (BRIDGE) M 170.0000 17,000.00 0.000 0.00 52 AGGREGATE BASE (APPROACH SLAB) M3 100.0000 1,600.00 0.000 0.00 53 ASPHALT CONCRETE (TYPE B) TONN 50.0000 381,500.00 0.000 0.00 54 PLACE ASPHALT CONCRETE DIKE M 20.0000 2,800.00 0.000 0.00 55 FURNISH STEEL PILING (HP 360 X 174) M 85.0000 138,550.00 1,630.000 138,550.00 56 DRIVE STEEL PILE (HP 360 X 174) EA 2,200.0000 204,600.00 93.000 204,600.00 S) 57 750 MM CAST-IN-DRILLED-HOLE CONCRETE M 310.0000 63,550.00 205.000 63,550.00 S) PILING 58 1.8 M CAST-IN-DRILLED-HOLE CONCRETE M 4,000.0000 144,000.00 36.000 144,000.00 S) PILING 59 FURNISH PILING (CLASS 625) M 50.0000 2,300.00 46.000 2,300.00 60 DRIVE PILE (CLASS 625) EA 2,500.0000 10,000.00 4.000 10,000.00 S) 61 450 MM CAST-IN-DRILLED-HOLE CONCRETE M 90.0000 561,600.00 6,249.750 562,477.50 S) PILING (BARRIER) 62 2.1 M PERMANENT STEEL CASING M 1,500.0000 9,000.00 6.000 9,000.00 S) 63 PRESTRESSING CAST-IN-PLACE CONCRETE LS 18,000.0000 18,000.00 1.000 18,000.00 S) 64 THREADED PRESTRESS BAR ASSEMBLIES LS 5,000.0000 5,000.00 0.500 2,500.00 65 STRUCTURAL CONCRETE, BRIDGE FOOTING M3 1,000.0000 87,000.00 87.000 87,000.00 F) 66 STRUCTURAL CONCRETE, BRIDGE M3 1,000.0000 525,000.00 450.000 450,000.00 F) 67 STRUCTURAL CONCRETE, RETAINING WALL M3 450.0000 135,000.00 300.000 135,000.00 F) 68 STRUCTURAL CONCRETE, APPROACH SLAB M3 850.0000 55,250.00 0.000 0.00 F) (TYPE N) 69 STRUCTURAL CONCRETE, APPROACH SLAB M3 850.0000 13,600.00 0.000 0.00 F) (TYPE R) 70 CLASS 2 CONCRETE (RETAINING WALL) M3 320.0000 425,600.00 1,330.000 425,600.00 F) 71 MINOR CONCRETE (MINOR STRUCTURE) M3 1,500.0000 93,000.00 3.680 5,520.00 12.790 19,185.00 F) 72 STRUCTURAL CONCRETE, PILE CAP M3 520.0000 35,880.00 21.000 10,920.00 90.000 46,800.00 F) 73 PAVING NOTCH EXTENSION M3 3,500.0000 3,500.00 0.000 0.00 74 DRILL AND BOND DOWEL M 90.0000 8,010.00 84.000 7,560.00 75 FURNISH PRECAST CONCRETE GIRDER EA 13,000.0000 26,000.00 0.000 0.00 S) (10 M - 15 M) 76 FURNISH PRECAST PRESTRESSED CONCRETE EA 16,000.0000 16,000.00 0.000 0.00 S) GIRDER (25 M - 30 M) PROGRAM CAS145 PAGE 4 DATE 01/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-002594 TIME 02:36 PM ESTIMATE NO. 15 BID OPENING 09/04/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/05 R.E. NAME: CHOU, MICHAEL DATE OF THIS ESTIMATE 01/24/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 ERECT PRECAST CONCRETE GIRDER EA 6,000.0000 12,000.00 0.000 0.00 S) 78 ERECT PRECAST PRESTRESSED CONCRETE EA 6,000.0000 6,000.00 0.000 0.00 S) GIRDER 79 REFINISH BRIDGE DECK M2 160.0000 9,280.00 0.000 0.00 80 CORE CONCRETE (0 - 50 MM) M 130.0000 260.00 0.000 0.00 S) 81 CORE CONCRETE (51 MM - 100 MM) M 150.0000 600.00 0.000 0.00 S) 82 CORE CONCRETE (101 MM - 150 MM) M 200.0000 1,400.00 0.000 0.00 S) 83 CORE CONCRETE (201 MM - 250 MM) M 400.0000 400.00 1.000 400.00 S) 84 SOUND WALL (BARRIER) (MASONRY BLOCK) M2 150.0000 1,120,050.00 6,515.000 977,250.00 SF) 85 PTFE SPHERICAL BEARING EA 9,000.0000 18,000.00 0.000 0.00 86 JOINT SEAL (TYPE A) M 120.0000 1,440.00 0.000 0.00 S) 87 JOINT SEAL (TYPE AL) M 25.0000 1,175.00 0.000 0.00 S) 88 JOINT SEAL (MR 30 MM) M 150.0000 4,050.00 0.000 0.00 S) 89 JOINT SEAL ASSEMBLY (MR 60 MM) M 1,100.0000 5,500.00 0.000 0.00 S) 90 JOINT SEAL (MR 40 MM) M 250.0000 1,250.00 0.000 0.00 S) 91 BAR REINFORCING STEEL (BRIDGE) KG 1.2000 158,904.00 114,221.000 137,065.20 SF) 92 BAR REINFORCING STEEL (RETAINING WALL) KG 1.5000 215,815.50 143,877.000 215,815.50 SF) 93 FURNISH STRUCTURAL STEEL (BRIDGE) KG 2.8000 455,000.00 0.000 0.00 SF) 94 ERECT STRUCTURAL STEEL (BRIDGE) KG 0.8000 130,000.00 0.000 0.00 SF) 95 FURNISH SIGN STRUCTURE (TRUSS) KG 5.0000 76,550.00 0.000 0.00 F) 96 INSTALL SIGN STRUCTURE (TRUSS) KG 0.8000 15,579.20 0.000 0.00 SF) 97 920 MM CAST-IN-DRILLED-HOLE M 1,200.0000 19,200.00 27.000 32,400.00 S) CONCRETE PILE (SIGN FOUNDATION) 98 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 99 METAL (WALL MOUNTED SIGN) EA 1,400.0000 8,400.00 0.000 0.00 00 MOUNT (SIGN PANEL ON SOUND WALL) EA 100.0000 400.00 0.000 0.00 01 INSTALL ROADSIDE SIGN PANEL ON EA 200.0000 200.00 0.000 0.00 EXISTING POST 02 TIMBER CATWALK M 75.0000 7,875.00 0.000 0.00 SF) 03 CLEAN AND PAINT STRUCTURAL STEEL LS 75,000.0000 75,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 5 DATE 01/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-002594 TIME 02:36 PM ESTIMATE NO. 15 BID OPENING 09/04/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/05 R.E. NAME: CHOU, MICHAEL DATE OF THIS ESTIMATE 01/24/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 600 MM REINFORCED CONCRETE PIPE M 400.0000 44,000.00 2.900 1,160.00 27.900 11,160.00 05 FRAME AND GRATE EA 250.0000 5,750.00 2.000 500.00 8.000 2,000.00 S) 06 MISCELLANEOUS METAL (BRIDGE) KG 3.0000 17,100.00 4,275.000 12,825.00 SF) 07 MISCELLANEOUS METAL (RESTRAINER) KG 10.0000 9,600.00 0.000 0.00 SF) 08 METAL BEAM GUARD RAILING (WOOD POST) M 90.0000 14,400.00 0.000 0.00 S) 09 PIPE HANDRAILING M 230.0000 3,450.00 0.000 0.00 SF) 10 TERMINAL SYSTEM (TYPE ET) EA 2,500.0000 5,000.00 0.000 0.00 S) 11 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 600.0000 2,400.00 0.000 0.00 S) 12 CONCRETE BARRIER (736 SV) M 370.0000 695,600.00 1,880.000 695,600.00 13 CONCRETE BARRIER (736 A MODIFIED) M 250.0000 145,000.00 573.000 143,250.00 14 CONCRETE BARRIER (TYPE 736 MODIFIED) M 220.0000 64,460.00 103.000 22,660.00 F) 15 CONCRETE BARRIER TYPE 736 SV (MOD) M 550.0000 36,850.00 67.000 36,850.00 F) 16 THERMOPLASTIC PAVEMENT MARKING M2 35.0000 1,470.00 0.000 0.00 S) 17 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 6,740.00 0.000 0.00 S) 18 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.0000 810.00 0.000 0.00 S) 19 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 11,400.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 20 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 600.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 21 PAVEMENT MARKER (REFLECTIVE-SPECIAL EA 3.0000 120.00 0.000 0.00 S) TYPE C) 22 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.5000 4,635.00 0.000 0.00 S) 23 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.0000 5,550.00 0.000 0.00 S) 24 LIGHTING (TEMPORARY) LS 65,000.0000 65,000.00 0.050 3,250.00 0.900 58,500.00 S) 25 MODIFY COMMUNICATION SYSTEM ROUTING LS 130,000.0000 130,000.00 0.790 102,700.00 S) 26 103 MM COMMUNICATION CONDUIT (BRIDGE) M 125.0000 89,625.00 350.000 43,750.00 SF) 27 MODIFY LIGHTING AND SIGN ILLUMINATION LS 80,000.0000 80,000.00 0.150 12,000.00 0.890 71,200.00 S) 28 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0.00 29 1524 MM CAST-IN-DRILLED-HOLE CONCRETE M 1,500.0000 15,000.00 0.000 0.00 PILE (SIGN FOUNDATION) PROGRAM CAS145 PAGE 6 DATE 01/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-002594 TIME 02:36 PM ESTIMATE NO. 15 BID OPENING 09/04/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/20/05 R.E. NAME: CHOU, MICHAEL DATE OF THIS ESTIMATE 01/24/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 172,288.00 7,815,635.67 ADJUSTMENT OF COMPENSATION 0.00 67,894.97 EXTRA WORK 17,603.09 191,398.12 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 189,891.09 8,074,928.76 30 MOBILIZATION LS 950,000.0000 950,000.00 1.000 950,000.00 ORIGINAL CONTRACT AMOUNT 11,184,553.70 TOTAL WORK COMPLETED 189,891.09 9,024,928.76 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -193,718.75 TOTAL 189,891.09 8,831,210.01 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/04/03 430 11/19/03 11/19/03 09/22/05 264 31 0 0 78% 85% PROGRESS IS SATISFACTORY CHOU, MICHAEL RESIDENT ENGINEER PROGRAM CAS145 PAGE 4 DATE 01/24/05