PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/25/03 EST. NO.04 TIME 12:53 PM R.E. NAME: CAO, RUDY 07-066324 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/25/03 EST. NO.04 TIME 12:53 PM R.E. NAME: CAO, RUDY 07-066324 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 11/25/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-066324 TIME 12:53 PM ESTIMATE NO. 04 BID OPENING 06/12/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/03 R.E. NAME: CAO, RUDY DATE OF THIS ESTIMATE 11/25/03 LOCATION PROGRESS ESTIMATE 07-LA-10-38.5/38.9 ----------------- D W POWELL CONSTRUCTION INC IN LOS ANGELES COUNTY IN WEST P O BOX 1406 COVINA FROM GRAND AVENUE FONTANA CA 923341406 UNDERCROSSING TO 0.2 KM WEST OF HOLT AVENUE UNDERCROSSING FED. AID NO. ACIM-010 -1(770)E SOUNDWALLS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY FENCE (TYPE CL-1.8) M 20.0000 12,000.00 500.000 10,000.00 02 PREPARE STORM WATER POLLUTION LS 1,000.0000 1,000.00 0.500 500.00 1.000 1,000.00 PREVENTION PLAN 03 WATER POLLUTION CONTROL LS 5,000.0000 5,000.00 0.200 1,000.00 0.300 1,500.00 04 CONSTRUCTION AREA SIGNS LS 4,500.0000 4,500.00 0.100 450.00 0.700 3,150.00 S) 05 TRAFFIC CONTROL SYSTEM LS 65,000.0000 65,000.00 0.300 19,500.00 0.500 32,500.00 S) 06 TEMPORARY TRAFFIC STRIPE (TAPE) M 10.0000 1,600.00 160.000 1,600.00 S) 07 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 660.00 22.000 660.00 S) 08 TEMPORARY PAVEMENT MARKER EA 10.0000 390.00 37.000 370.00 S) 09 TEMPORARY RAILING (TYPE K) M 30.0000 33,300.00 1,110.000 33,300.00 S) 10 TEMPORARY CRASH CUSHION MODULE EA 300.0000 12,600.00 42.000 12,600.00 S) 11 REMOVE CHAIN LINK FENCE M 10.0000 5,400.00 535.000 5,350.00 S) 12 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 15.0000 2,400.00 160.000 2,400.00 S) STRIPE 13 REMOVE PAVEMENT MARKER EA 2.0000 78.00 45.000 90.00 S) 14 REMOVE ROADSIDE SIGN EA 100.0000 100.00 1.000 100.00 15 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.0000 9,140.00 0.000 0.00 S) (50 MM MAXIMUM) 16 REMOVE CONCRETE CURB M 30.0000 13,500.00 443.400 13,302.00 17 CLEARING AND GRUBBING LS 40,000.0000 40,000.00 1.000 40,000.00 18 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 19 STRUCTURE EXCAVATION, RETAINING WALL M3 30.0000 39,000.00 520.000 15,600.00 (SOUND WALL ) 20 STRUCTURE EXCAVATION (TYPE Y) M3 35.0000 40,250.00 800.000 28,000.00 F) (AERIALLY DEPOSITED LEAD) 21 STRUCTURE BACKFILL, RETAINING WALL M3 40.0000 98,000.00 0.000 0.00 F) (SOUND WALL ) 22 HIGHWAY PLANTING LS 20,000.0000 20,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 11/25/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-066324 TIME 12:53 PM ESTIMATE NO. 04 BID OPENING 06/12/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/03 R.E. NAME: CAO, RUDY DATE OF THIS ESTIMATE 11/25/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PLANT ESTABLISHMENT WORK LS 8,000.0000 8,000.00 0.000 0.00 S) 24 IRRIGATION SYSTEM LS 40,000.0000 40,000.00 0.000 0.00 S) 25 ASPHALT CONCRETE (TYPE B) TONN 60.0000 33,000.00 0.000 0.00 26 STRUCTURAL CONCRETE, RETAINING WALL M3 350.0000 336,000.00 115.200 40,320.00 115.200 40,320.00 F) 27 MINOR CONCRETE (MINOR STRUCTURE) M3 2,000.0000 9,000.00 4.000 8,000.00 F) 28 FRACTURED RIB TEXTURE M2 80.0000 10,400.00 0.000 0.00 29 SOUND WALL (BARRIER) (MASONRY BLOCK) M2 120.0000 185,040.00 0.000 0.00 F) 30 SOUND WALL (MASONRY BLOCK) M2 120.0000 90,960.00 0.000 0.00 F) 31 BAR REINFORCING STEEL (RETAINING WALL) KG 1.5000 101,977.50 16,996.250 25,494.38 16,996.250 25,494.38 SF) 32 920 MM CAST-IN-DRILLED-HOLE M 700.0000 7,000.00 0.000 0.00 S) CONCRETE PILE (SIGN FOUNDATION) 33 METAL (WALL MOUNTED SIGN) EA 100.0000 100.00 0.000 0.00 34 MINOR CONCRETE (CURB) M3 300.0000 22,500.00 0.000 0.00 35 MISCELLANEOUS IRON AND STEEL KG 2.0000 296.00 0.000 0.00 SF) 36 CONCRETE BARRIER (TYPE 736A MOD) M 200.0000 72,000.00 0.000 0.00 37 100 MM THERMOPLASTIC TRAFFIC STRIPE M 4.0000 2,120.00 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 38 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.0000 195.00 0.000 0.00 S) 39 MODIFY LIGHTING AND SIGN ILLUMINATION LS 15,000.0000 15,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 11/25/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-066324 TIME 12:53 PM ESTIMATE NO. 04 BID OPENING 06/12/03 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/03 R.E. NAME: CAO, RUDY DATE OF THIS ESTIMATE 11/25/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 87,264.38 280,336.38 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 87,264.38 280,336.38 40 MOBILIZATION LS 140,000.0000 140,000.00 0.750 105,000.00 ORIGINAL CONTRACT AMOUNT 1,482,506.50 TOTAL WORK COMPLETED 87,264.38 385,336.38 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 87,264.38 385,336.38 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/10/03 265 07/25/03 07/25/03 03/19/04 72 0 0 8 26% 37% PROGRESS IS SATISFACTORY CAO, RUDY RESIDENT ENGINEER PROGRAM CAS145 DATE 11/25/03