PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/19/23 EST. NO. 007 TIME 02:04 PM R.E. NAME: TOUTOUNCHIAN, SAM 07-0W1004 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 16,887.73 E.W. @ F.A.(+) 020323 N 0005.0 0002 255.02 020323 N 0005.1 17,142.75 TOTAL THIS ESTIMATE 8,652.78 TOTAL PREVIOUS ESTIMATE 25,795.53 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/19/23 EST. NO. 007 TIME 02:04 PM R.E. NAME: TOUTOUNCHIAN, SAM 07-0W1004 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W1004 TIME 02:04 PM ESTIMATE NO. 007 BID OPENING 06/23/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: TOUTOUNCHIAN, SAM DATE OF THIS ESTIMATE 06/19/23 LOCATION PROGRESS ESTIMATE 07-LA-5-31.8/42.6 ----------------- C. A. RASMUSSEN, INC. IN LOS ANGELES COUNTY IN LOS 28548 LIVINGSTON AVENUE; ANGELES FROM COHASSET STREET UNDER- VALENCIA CA 91355 CROSSING TO ROXFORD STREET UNDER-_ CROSSING FED. AID NO. N O N E REPLACE PCC SLABS,GRIND PCC ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,200.0000 2,200.00 1.000 2,200 002 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS 1,000.0000 1,000.00 0.500 500 003 TIME-RELATED OVERHEAD (WDAY) WDAY 2,200.0000 352,000.00 20.000 44,000.00 70.000 154,000 004 DISPUTE RESOLUTION ADVISOR ON-SITE EA 2,000.0000 8,000.00 0.000 0 MEETING 005 HOURLY OFF-SITE HR 200.0000 2,000.00 0.000 0 DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS 006 CONSTRUCTION AREA SIGNS LS 33,000.0000 33,000.00 0.570 18,810 007 TRAFFIC CONTROL SYSTEM LS 279,000.0000 279,000.00 0.125 34,875.00 0.369 102,951 008 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 590.0000 17,700.00 10.000 5,900 009 PORTABLE RADAR SPEED FEEDBACK SIGN EA 450.0000 2,700.00 21.000 9,450 SYSTEM DAY 010 MOBILE BARRIER SYSTEM DAY 3,100.0000 93,000.00 30.000 93,000 011 JOB SITE MANAGEMENT LS 4,500.0000 4,500.00 0.125 562.50 0.435 1,957 012 PREPARE WATER POLLUTION CONTROL PROGRAM LS 670.0000 670.00 1.000 670 013 TEMPORARY CONCRETE WASHOUT LS 1,000.0000 1,000.00 1.000 1,000 014 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 0.5100 26,214.00 1,259.000 642.09 1,259.000 642 STRIPE (HAZARDOUS WASTE) 015 REPLACE ASPHALT CONCRETE SURFACING CY 320.0000 1,158,400.00 1,582.000 506,240.00 2,986.000 955,520 016 RUBBERIZED HOT MIX ASPHALT (GAP GRADED) TON 150.0000 3,720,000.00 8,135.000 1,220,250.00 8,135.000 1,220,250 017 TACK COAT TON 710.0000 64,610.00 50.000 35,500.00 50.000 35,500 018 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 3.0000 591,000.00 84,127.000 252,381.00 84,127.000 252,381 019 DRILL AND BOND (DOWEL BAR) EA 32.0000 51,200.00 1,284.000 41,088 020 INDIVIDUAL SLAB REPLACEMENT (RSC) CY 930.0000 465,000.00 589.460 548,197 021 GRIND EXISTING CONCRETE SQYD 32.0000 64,000.00 0.000 0 PAVEMENT 022 REMOVE PAVEMENT MARKER EA 3.1000 496.00 -131.000 -406.10 29.000 89 PROGRAM CAS145 PAGE 2 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W1004 TIME 02:04 PM ESTIMATE NO. 007 BID OPENING 06/23/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: TOUTOUNCHIAN, SAM DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 PAVEMENT MARKER (RETROREFLECTIVE) EA 5.1000 12,903.00 0.000 0 024 6" THERMOPLASTIC TRAFFIC STRIPE LF 0.8600 102,340.00 0.000 0 025 THERMOPLASTIC PAVEMENT MARKING SQFT 6.1000 122,000.00 0.000 0 026 6" THERMOPLASTIC TRAFFIC STRIPE LF 10.1000 15,352.00 0.000 0 (BROKEN 36-12) 027 6" THERMOPLASTIC TRAFFIC STRIPE LF 1.6000 25,760.00 0.000 0 (BROKEN 17-7) 028 12" THERMOPLASTIC TRAFFIC STRIPE LF 3.1000 60,760.00 0.000 0 029 PAINT TRAFFIC STRIPE (1-COAT) LF 0.2000 22,000.00 0.000 0 030 REMOVE PAINTED TRAFFIC STRIPE LF 0.1000 152.00 0.000 0 031 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.1000 297.00 0.000 0 032 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 033 ITEM DELETED PER ADDENDUM LS 0.0000 0.00 0.000 0 034 MODIFYING SIGNAL AND LIGHTING LS 80,000.0000 80,000.00 0.000 0 SYSTEMS (CITY) 035 MODIFYING RAMP METERING SYSTEMS LS 195,000.0000 195,000.00 0.000 0 036 MAINTAINING EXISTING TRAFFIC MANAGEMENT LS 1,600.0000 1,600.00 0.000 0 SYSTEM ELEMENTS DURING CONSTRUCTION PROGRAM CAS145 PAGE 3 DATE 06/19/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W1004 TIME 02:04 PM ESTIMATE NO. 007 BID OPENING 06/23/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/23 R.E. NAME: TOUTOUNCHIAN, SAM DATE OF THIS ESTIMATE 06/19/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 2,094,044.49 3,444,107.29 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 17,142.75 25,795.53 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 2,111,187.24 3,469,902.82 037 MOBILIZATION LS 720,000.0000 720,000.00 0.200 144,000.00 0.950 684,000 ORIGINAL CONTRACT AMOUNT 8,295,854.00 TOTAL WORK COMPLETED 2,255,187.24 4,153,902.82 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 2,255,187.24 4,153,902.82 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/11/22 160 00/00/00 07/26/22 07/28/23 79 145 0 0 49% 49% PROGRESS IS SATISFACTORY TOUTOUNCHIAN, SAM RESIDENT ENGINEER