PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/24/25 EST. NO. 008 TIME 04:50 PM R.E. NAME: SHALVIRI, ALI 07-0W3704 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/24/25 EST. NO. 008 TIME 04:50 PM R.E. NAME: SHALVIRI, ALI 07-0W3704 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W3704 TIME 04:50 PM ESTIMATE NO. 008 BID OPENING 11/02/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/23/24 R.E. NAME: SHALVIRI, ALI DATE OF THIS ESTIMATE 02/24/25 LOCATION FINAL ESTIMATE 07-VAR -------------- PETERSON-CHASE GENERAL LOS ANGELES COUNTY AT VARIOUS LOCATIONS ENGINEERING CONSTRUCTION, INC. 16351 CONSTRUCTION CIRCLE WES IRVINE CA 92606 FED. AID NO. N O N E STRUCTURAL CONCRETE SLAB, FURNISH & PLACE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000 002 TIME-RELATED OVERHEAD (WDAY) WDAY 650.0000 58,500.00 90.000 58,500 003 CONSTRUCTION AREA SIGNS LS 15,000.0000 15,000.00 1.000 15,000 004 TRAFFIC CONTROL SYSTEM LS 120,000.0000 120,000.00 1.000 120,000 005 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 500.0000 15,000.00 11.000 5,500 006 PORTABLE RADAR SPEED FEEDBACK SIGN EA 70.0000 2,100.00 0.000 0 SYSTEM DAY 007 END OF QUEUE MONITORING AND WARNING WITH EA 1,500.0000 7,500.00 0.000 0 TRUCK MOUNTED CHANGEABLE MESSAGE SIGN DAY 008 JOB SITE MANAGEMENT LS 5,000.0000 5,000.00 1.000 5,000 009 WATER POLLUTION CONTROL PROGRAM LS 1,500.0000 1,500.00 1.000 1,500 010 TEMPORARY CONCRETE WASHOUT LS 2,000.0000 2,000.00 1.000 2,000 011 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 17.0000 10,540.00 552.000 9,384 STRIPE (HAZARDOUS WASTE) 012 GRIND EXISTING BRIDGE DECK SQYD 92.0000 27,600.00 343.290 31,582 013 STRUCTURAL CONCRETE, APPROACH SLAB (TYPE CY 2,500.0000 375,000.00 4.418 11,045.00 152.388 380,970 R) 014 PAVING NOTCH EXTENSION CF 220.0000 14,960.00 82.620 18,176 015 JOINT SEAL (MR 1") LF 80.0000 7,280.00 82.000 6,560 016 PUBLIC SAFETY PLAN LS 10,000.0000 10,000.00 1.000 10,000 017 RAPID SETTING CONCRETE (PATCH) CF 150.0000 7,200.00 31.000 4,650 018 REMOVE UNSOUND CONCRETE CF 150.0000 7,200.00 31.000 4,650 019 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.7500 14,865.75 20,610.000 15,457 020 FURNISH POLYESTER CONCRETE OVERLAY CF 180.0000 104,940.00 741.170 133,410 021 PLACE POLYESTER CONCRETE OVERLAY SQFT 14.0000 81,662.00 -789.000 -11,046.00 5,833.000 81,662 (F) PROGRAM CAS145 PAGE 2 DATE 02/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W3704 TIME 04:50 PM ESTIMATE NO. 008 BID OPENING 11/02/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/23/24 R.E. NAME: SHALVIRI, ALI DATE OF THIS ESTIMATE 02/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 022 TREAT BRIDGE DECK SQFT 1.1000 15,386.80 13,988.000 15,386 (F) 023 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 82.0000 14,350.00 135.000 11,070 024 REMOVE PAVEMENT MARKER EA 11.0000 880.00 80.000 880 025 PAVEMENT MARKER (RETROREFLECTIVE) EA 55.0000 1,100.00 20.000 1,100 026 THERMOPLASTIC PAVEMENT MARKING SQFT 28.0000 5,040.00 179.500 5,026 027 6" THERMOPLASTIC TRAFFIC STRIPE LF 28.0000 2,800.00 0.000 0 (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3) 028 REMOVE PAINTED TRAFFIC STRIPE LF 6.0000 840.00 0.166 1.00 140.166 841 029 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 6.0000 8,400.00 1,227.000 7,362 030 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 12.0000 2,160.00 100.000 1,200 031 12" TRAFFIC STRIPE TAPE (WARRANTY) LF 45.0000 11,700.00 148.000 6,660 032 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 24.0000 27,600.00 1,305.000 31,320 033 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 24.0000 3,120.00 54.250 1,302 (BROKEN 36-12) 034 6" TRAFFIC STRIPE TAPE (WARRANTY) LF 24.0000 1,824.00 0.000 0 (BROKEN 8-4) 035 8" TRAFFIC STRIPE TAPE (WARRANTY) LF 35.0000 1,400.00 54.510 1,907 036 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 45.0000 6,300.00 140.330 6,314 (WARRANTY) PROGRAM CAS145 PAGE 3 DATE 02/24/25 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W3704 TIME 04:50 PM ESTIMATE NO. 008 BID OPENING 11/02/23 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/23/24 R.E. NAME: SHALVIRI, ALI DATE OF THIS ESTIMATE 02/24/25 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 997,373.68 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 0.00 997,373.68 037 MOBILIZATION LS 80,000.0000 80,000.00 1.000 80,000 ORIGINAL CONTRACT AMOUNT 1,073,748.55 TOTAL WORK COMPLETED 0.00 1,077,373.68 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 0.00 1,077,373.68 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/23/24 90 02/13/24 02/13/24 10/23/24 90 86 0 0 100% 100% SHALVIRI, ALI RESIDENT ENGINEER