PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/17/23 EST. NO. 001 TIME 01:12 PM R.E. NAME: HONG, HAI 07-0W3804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/17/23 EST. NO. 001 TIME 01:12 PM R.E. NAME: HONG, HAI 07-0W3804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 02/17/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W3804 TIME 01:12 PM ESTIMATE NO. 001 BID OPENING 11/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/23 R.E. NAME: HONG, HAI DATE OF THIS ESTIMATE 02/17/23 LOCATION PROGRESS ESTIMATE 07-LA-210-R46.3 ----------------- PETERSON-CHASE GENERAL LOS ANGELES COUNTY IN SAN DIMAS AT ENGINEERING CONSTRUCTION, INC. METROPOLITAN WATER DISTRICT PIPELINE 16351 CONSTRUCTION CIRCLE WES UNDERCROSSING IRVINE CA 92606 FED. AID NO. N O N E FURNISH AND PLACE POLYESTER CONCRETE OVERL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 2,500.0000 2,500.00 0.750 1,875.00 0.750 1,875 002 TIME-RELATED OVERHEAD (WDAY) WDAY 630.0000 56,700.00 18.000 11,340.00 18.000 11,340 003 CONSTRUCTION AREA SIGNS LS 6,600.0000 6,600.00 0.500 3,300.00 0.500 3,300 004 TRAFFIC CONTROL SYSTEM LS 59,000.0000 59,000.00 0.200 11,800.00 0.200 11,800 005 PORTABLE RADAR SPEED FEEDBACK SIGN EA 186.0000 6,324.00 0.000 0 SYSTEM DAY 006 MOBILE BARRIER SYSTEM DAY 610.0000 9,150.00 0.000 0 007 JOB SITE MANAGEMENT LS 640.0000 640.00 0.200 128.00 0.200 128 008 PREPARE WATER POLLUTION CONTROL PROGRAM LS 940.0000 940.00 0.500 470.00 0.500 470 009 TEMPORARY CONCRETE WASHOUT LS 880.0000 880.00 0.000 0 010 HOT MIX ASPHALT (TYPE A) TON 1,200.0000 21,600.00 0.000 0 011 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 17.7000 2,832.00 0.000 0 012 GRIND EXISTING BRIDGE DECK SQYD 96.0000 79,680.00 886.600 85,113.60 886.600 85,113 013 CLEAN EXPANSION JOINT LF 28.4000 9,315.20 0.000 0 014 JOINT SEAL (MR 1") LF 29.0000 9,512.00 0.000 0 015 PUBLIC SAFETY PLAN LS 1,050.0000 1,050.00 0.250 262.50 0.250 262 016 RAPID SETTING CONCRETE (PATCH) CF 39.0000 8,190.00 11.700 456.30 11.700 456 017 REMOVE UNSOUND CONCRETE CF 27.0000 5,670.00 11.700 315.90 11.700 315 018 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.2600 9,204.00 0.000 0 019 FURNISH POLYESTER CONCRETE OVERLAY CF 120.0000 424,800.00 0.000 0 020 PLACE POLYESTER CONCRETE OVERLAY SQFT 2.3600 83,544.00 0.000 0 (F) 021 REMOVE PAVEMENT MARKER EA 1.1800 101.48 0.000 0 022 PAVEMENT MARKER (RETROREFLECTIVE) EA 11.8000 1,014.80 0.000 0 PROGRAM CAS145 PAGE 2 DATE 02/17/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W3804 TIME 01:12 PM ESTIMATE NO. 001 BID OPENING 11/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/23 R.E. NAME: HONG, HAI DATE OF THIS ESTIMATE 02/17/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 2.3600 5,947.20 3,189.000 7,526.04 3,189.000 7,526 024 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 7.1000 7,171.00 0.000 0 (WARRANTY) 025 6" TRAFFIC STRIPE TAPE WITH CONTRAST LF 3.5400 3,575.40 0.000 0 (WARRANTY) (BROKEN 36-12) 026 8" TRAFFIC STRIPE TAPE WITH CONTRAST LF 11.8000 11,918.00 0.000 0 (WARRANTY) PROGRAM CAS145 PAGE 3 DATE 02/17/23 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-0W3804 TIME 01:12 PM ESTIMATE NO. 001 BID OPENING 11/01/22 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/23 R.E. NAME: HONG, HAI DATE OF THIS ESTIMATE 02/17/23 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 122,587.34 122,587.34 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 122,587.34 122,587.34 027 MOBILIZATION LS 58,000.0000 58,000.00 0.750 43,500.00 0.750 43,500 ORIGINAL CONTRACT AMOUNT 885,859.08 TOTAL WORK COMPLETED 166,087.34 166,087.34 MATERIALS ON HAND ON SITE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 166,087.34 166,087.34 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 12/14/22 90 02/03/23 12/29/22 06/06/23 18 18 0 0 19% 20% PROGRESS IS SATISFACTORY HONG, HAI RESIDENT ENGINEER