PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/26/02 EST. NO.01 TIME 12:33 PM R.E. NAME: TOUTOUNCHIAN, MOHAMMAD 07-115164 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/26/02 EST. NO.01 TIME 12:33 PM R.E. NAME: TOUTOUNCHIAN, MOHAMMAD 07-115164 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 09/26/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-115164 TIME 12:33 PM ESTIMATE NO. 01 BID OPENING 06/06/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/02 R.E. NAME: TOUTOUNCHIAN, MOHAMMAD DATE OF THIS ESTIMATE 09/26/02 LOCATION PROGRESS ESTIMATE 07-VEN-1-15.2/19.1 ----------------- GRANITE CONSTRUCTION COMPANY IN VENTURA COUNTY IN OXNARD FROM P O BOX 50085 0.3 KM NORTH OF PLEASANT VALLEY WATSONVILLE CA 950775085 ROAD TO ROBERT AVENUE FED. AID NO. ACST-P001(483)E ,P-P001(483)E REHABILITATE ROADWAY ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 12,000.0000 12,000.00 0.250 3,000.00 0.250 3,000.00 002 TIME-RELATED OVERHEAD WDAY 800.0000 200,000.00 39.000 31,200.00 39.000 31,200.00 003 CONSTRUCTION AREA SIGNS LS 17,000.0000 17,000.00 0.500 8,500.00 0.500 8,500.00 (S) 004 TRAFFIC CONTROL SYSTEM LS 142,334.5400 142,334.54 0.160 22,773.53 0.160 22,773.53 (S) 005 FLASHING ARROW SIGN EA 0.0100 0.04 0.000 0.00 (S) 006 TEMPORARY PAVEMENT MARKING (PAINT) M2 0.0100 0.50 0.000 0.00 (S) 007 TEMPORARY TRAFFIC STRIPE (PAINT) M 0.0100 93.10 0.000 0.00 008 CHANNELIZER (SURFACE MOUNTED) EA 0.0100 1.50 0.000 0.00 009 TEMPORARY PAVEMENT MARKER EA 0.0100 5.10 0.000 0.00 (S) 010 TEMPORARY RAILING (TYPE K) M 0.0100 58.80 0.000 0.00 011 TEMPORARY CRASH CUSHION MODULE EA 0.0100 0.42 0.000 0.00 (S) 012 REMOVE METAL BEAM GUARD RAILING M 45.0000 6,750.00 178.000 8,010.00 178.000 8,010.00 013 REMOVE PAINTED TRAFFIC STRIPE M 0.0100 62.10 0.000 0.00 014 REMOVE PAINTED PAVEMENT MARKING M2 0.0100 0.50 0.000 0.00 015 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 0.0100 2.10 0.000 0.00 016 REMOVE PAVEMENT MARKER EA 0.0100 66.30 0.000 0.00 017 REMOVE ROADSIDE SIGN EA 80.0000 1,760.00 0.000 0.00 018 REMOVE ROADSIDE SIGN EA 130.0000 1,170.00 0.000 0.00 (STRAP AND SADDLE BRACKET METHOD) 019 REMOVE ASPHALT CONCRETE DIKE M 32.0000 384.00 0.000 0.00 020 ADJUST MANHOLE TO GRADE EA 470.0000 10,810.00 0.000 0.00 021 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.5500 12,431.00 2,845.000 4,409.75 2,845.000 4,409.75 (S) (60 MM MAXIMUM) 022 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.1000 76,670.00 0.000 0.00 (S) (75 MM MAXIMUM) PROGRAM CAS145 PAGE 2 DATE 09/26/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-115164 TIME 12:33 PM ESTIMATE NO. 01 BID OPENING 06/06/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/02 R.E. NAME: TOUTOUNCHIAN, MOHAMMAD DATE OF THIS ESTIMATE 09/26/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.6500 37,125.00 0.000 0.00 (S) (105 MM MAXIMUM) 024 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 1.9000 50,540.00 0.000 0.00 (S) (150 MM MAXIMUM) 025 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.5500 30,345.00 9,360.000 23,868.00 9,360.000 23,868.00 (S) (210 MM MAXIMUM) 026 REMOVE CONCRETE M3 45.0000 17,550.00 0.000 0.00 027 REMOVE CONCRETE (CURB AND GUTTER) M 17.0000 4,080.00 53.000 901.00 53.000 901.00 028 REMOVE CONCRETE CURB AND SIDEWALK M2 12.0000 360.00 0.000 0.00 029 CLEARING AND GRUBBING LS 4,500.0000 4,500.00 0.000 0.00 030 ROADWAY EXCAVATION M3 21.0000 20,790.00 490.380 10,297.98 490.380 10,297.98 031 ROADWAY EXCAVATION (TYPE Y) M3 11.0000 23,320.00 1,074.180 11,815.98 1,074.180 11,815.98 (AERIALLY DEPOSITED LEAD) 032 LEAD COMPLIANCE PLAN LS 14,000.0000 14,000.00 1.000 14,000.00 1.000 14,000.00 033 SHOULDER BACKING STA 145.0000 7,685.00 0.000 0.00 034 CLASS 2 AGGREGATE BASE M3 62.0000 27,900.00 0.000 0.00 035 SEAL RANDOM CRACKS LNKM 500.0000 28,500.00 0.000 0.00 036 ASPHALT CONCRETE (TYPE B) TONN 48.5000 1,193,100.00 0.000 0.00 037 ASPHALT CONCRETE (LEVELING) TONN 49.5000 628,650.00 0.000 0.00 038 PAVING ASPHALT (BINDER-PAVEMENT TONN 650.0000 38,350.00 0.000 0.00 REINFORCING FABRIC) 039 PAVEMENT REINFORCING FABRIC M2 0.5000 24,550.00 0.000 0.00 040 ROADSIDE SIGN - ONE POST EA 220.0000 5,060.00 0.000 0.00 041 ROADSIDE SIGN - TWO POST EA 700.0000 2,100.00 0.000 0.00 042 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 110.0000 4,290.00 0.000 0.00 METHOD) 043 MINOR CONCRETE (MISCELLANEOUS M3 475.0000 15,675.00 0.000 0.00 (F) CONSTRUCTION) 044 DELINEATOR (CLASS 1) EA 30.0000 120.00 0.000 0.00 045 OBJECT MARKER EA 30.0000 30.00 0.000 0.00 046 METAL BEAM GUARD RAILING (WOOD POST) M 63.5000 27,940.00 0.000 0.00 047 TERMINAL SYSTEM (TYPE SRT) EA 2,000.0000 12,000.00 0.000 0.00 048 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 580.0000 2,320.00 0.000 0.00 049 CRASH CUSHION (REACT 9SCBS) EA 34,200.0000 68,400.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 3 DATE 09/26/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-115164 TIME 12:33 PM ESTIMATE NO. 01 BID OPENING 06/06/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/02 R.E. NAME: TOUTOUNCHIAN, MOHAMMAD DATE OF THIS ESTIMATE 09/26/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 CONCRETE BARRIER (TYPE 60) M 362.0000 14,118.00 0.000 0.00 051 CONCRETE BARRIER (TYPE 60E) M 454.0000 13,620.00 0.000 0.00 052 THERMOPLASTIC PAVEMENT MARKING M2 25.0000 25,000.00 0.000 0.00 (S) 053 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 17,500.00 0.000 0.00 (S) 054 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 6,500.00 0.000 0.00 (S) 055 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.5000 600.00 0.000 0.00 (S) (BROKEN 3.66 M - 0.92 M) 056 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.0000 360.00 0.000 0.00 (S) (BROKEN 1.83 M - 0.30 M) 057 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6000 3,702.00 0.000 0.00 (S) (BROKEN 10.98 M - 3.66 M) 058 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6000 4,140.00 0.000 0.00 (S) (BROKEN 5.18 M - 2.14 M) 059 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.0000 4,020.00 0.000 0.00 (S) 060 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.0000 5,840.00 0.000 0.00 (S) 061 MODIFY FLASHING BEACON LS 50,700.0000 50,700.00 0.000 0.00 (S) 062 INDUCTIVE LOOP DETECTOR EA 185.0000 30,710.00 0.000 0.00 (S) 063 MODIFY LIGHTING AND SIGN ILLUMINATION LS 15,715.0000 15,715.00 0.000 0.00 (S) PROGRAM CAS145 PAGE 4 DATE 09/26/02 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-115164 TIME 12:33 PM ESTIMATE NO. 01 BID OPENING 06/06/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/02 R.E. NAME: TOUTOUNCHIAN, MOHAMMAD DATE OF THIS ESTIMATE 09/26/02 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 138,776.24 138,776.24 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 138,776.24 138,776.24 064 MOBILIZATION LS 30,000.0000 30,000.00 0.500 15,000.00 0.500 15,000.00 ORIGINAL CONTRACT AMOUNT 2,993,405.00 TOTAL WORK COMPLETED 153,776.24 153,776.24 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 153,776.24 153,776.24 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/12/02 250 00/00/00 07/29/02 07/30/03 39 0 0 0 5% 16% PROGRESS IS SATISFACTORY TOUTOUNCHIAN, MOHAMMAD RESIDENT ENGINEER PROGRAM CAS145 DATE 09/26/02