PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 12/23/09 EST. NO.07 TIME 10:21 AM R.E. NAME: SHALVIRI, ALI 07-119734 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0002 121.06 E.W. @ F.A.(+) 072909 N 2 0 0007 90.79 091109 N 7 0 0022 201.95 091609 N 22 0 0040 151.32 100509 N 40 0 565.12 TOTAL THIS ESTIMATE 181.59 TOTAL PREVIOUS ESTIMATE 746.71 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 12/23/09 EST. NO.07 TIME 10:21 AM R.E. NAME: SHALVIRI, ALI 07-119734 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE LIQ DAMAGES -42,000.00 07 -42,000.00 -42,000.00 TOTAL DEDUCTIONS -42,000.00 -42,000.00 PROGRAM CAS145 PAGE 1 DATE 12/23/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-119734 TIME 10:21 AM ESTIMATE NO. 07 BID OPENING 12/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/09 R.E. NAME: SHALVIRI, ALI DATE OF THIS ESTIMATE 12/23/09 LOCATION PROGRESS ESTIMATE 07-LA-2-R25.5/29.1 ----------------- SOUTHLAND CONSTRUCTION IN LOS ANGELES COUNTY IN AND NEAR 3943 IRVINE BLVD., NO. 40 LA CANADA-FLINTRIDGE AND PASADENA IRVINE, CA 92602 AT VARIOUS LOCATIONS FROM LA CANADA ARCH BRIDGE TO SIDEHILL VIADUCT FED. AID NO. N O N E REPLACE AND UPGRADE BRIDGE RAILING ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 CONSTRUCTION SITE MANAGEMENT LS 5,000.0000 5,000.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 0.250 750.00 1.000 3,000.00 PROGRAM 03 TEMPORARY FIBER ROLL M 20.0000 5,600.00 0.000 0.00 04 TEMPORARY GRAVEL BAG BERM M 20.0000 2,200.00 20.000 400.00 110.000 2,200.00 05 TEMPORARY CONCRETE WASHOUT FACILITY EA 200.0000 800.00 3.000 600.00 4.000 800.00 06 TEMPORARY CONSTRUCTION ENTRANCE EA 3,000.0000 12,000.00 4.000 12,000.00 07 MOVE-IN/MOVE-OUT EA 5,000.0000 10,000.00 0.000 0.00 (TEMPORARY EROSION CONTROL) 08 TEMPORARY DRAINAGE INLET PROTECTION EA 300.0000 600.00 2.000 600.00 09 STREET SWEEPING LS 2,000.0000 2,000.00 0.000 0.00 10 CONSTRUCTION AREA SIGNS LS 1,000.0000 1,000.00 0.300 300.00 1.000 1,000.00 11 TRAFFIC CONTROL SYSTEM LS 1,000.0000 1,000.00 0.200 200.00 1.000 1,000.00 12 TEMPORARY TRAFFIC STRIPE (TAPE) M 10.0000 28,800.00 2,140.000 21,400.00 13 TEMPORARY PAVEMENT MARKING (TAPE) M2 100.0000 2,700.00 33.000 3,300.00 14 CHANNELIZER (SURFACE MOUNTED) EA 100.0000 22,000.00 163.000 16,300.00 15 TEMPORARY RAILING (TYPE K) M 100.0000 30,000.00 292.630 29,263.00 16 TEMPORARY CRASH CUSHION MODULE EA 500.0000 22,000.00 44.000 22,000.00 17 TEMPORARY CRASH CUSHION (ADIEM) EA 10,000.0000 30,000.00 3.000 30,000.00 18 REMOVE METAL BEAM GUARD RAILING M 30.0000 2,340.00 75.600 2,268.00 19 REMOVE YELLOW PAINTED TRAFFIC STRIPE M 10.0000 4,900.00 490.000 4,900.00 20 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 10.0000 6,300.00 898.000 8,980.00 STRIPE 21 REMOVE TRAFFIC STRIPE M 10.0000 4,200.00 546.000 5,460.00 22 REMOVE PAVEMENT MARKER EA 10.0000 2,000.00 164.000 1,640.00 PROGRAM CAS145 PAGE 2 DATE 12/23/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-119734 TIME 10:21 AM ESTIMATE NO. 07 BID OPENING 12/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/09 R.E. NAME: SHALVIRI, ALI DATE OF THIS ESTIMATE 12/23/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE ASPHALT CONCRETE DIKE M 30.0000 1,290.00 36.600 1,098.00 24 REMOVE ASPHALT CONCRETE SURFACING M2 20.0000 4,210.00 210.500 4,210.00 25 SALVAGE CONCRETE BARRIER (TYPE K) M 100.0000 3,700.00 37.000 3,700.00 26 REMOVE CRASH CUSHION EA 1,000.0000 2,000.00 2.000 2,000.00 27 BRIDGE REMOVAL (PORTION), LOCATION A LS 10,000.0000 10,000.00 1.000 10,000.00 28 BRIDGE REMOVAL (PORTION), LOCATION B LS 10,000.0000 10,000.00 1.000 10,000.00 29 BRIDGE REMOVAL (PORTION), LOCATION C LS 10,000.0000 10,000.00 1.000 10,000.00 30 CLEARING AND GRUBBING LS 10,000.0000 10,000.00 0.250 2,500.00 1.000 10,000.00 31 ROADWAY EXCAVATION M3 100.0000 300.00 3.000 300.00 32 LEAD COMPLIANCE PLAN (STRIPE REMOVAL) LS 5,000.0000 5,000.00 1.000 5,000.00 33 REPLACE ASPHALT CONCRETE SURFACING M3 100.0000 2,700.00 19.180 1,918.00 27.000 2,700.00 34 HOT MIX ASPHALT (TYPE B) TONN 1,000.0000 26,900.00 13.625 13,625.00 38.625 38,625.00 35 PLACE HOT MIX ASPHALT DIKE (TYPE C) M 100.0000 2,900.00 0.000 0.00 36 STRUCTURAL CONCRETE, BRIDGE M3 1,000.0000 45,000.00 45.000 45,000.00 F) 37 DRILL AND BOND DOWEL M 100.0000 4,100.00 41.000 4,100.00 38 CARBON FIBER REINFORCED POLYMER STRIPS M 40.0000 15,880.00 397.160 15,886.40 39 BAR REINFORCING STEEL (BRIDGE) KG 20.0000 84,640.00 1,058.000 21,160.00 5,290.000 105,800.00 40 MINOR CONCRETE (CURB RAMP) M3 2,000.0000 2,000.00 1.000 2,000.00 1.000 2,000.00 41 METAL BEAM GUARD RAILING (STEEL POST) M 200.0000 2,400.00 12.000 2,400.00 12.000 2,400.00 42 METAL BEAM GUARD RAILING (WOOD POST) M 200.0000 800.00 4.000 800.00 4.000 800.00 43 TUBULAR HANDRAILING M 1,000.0000 57,000.00 54.000 54,000.00 54.000 54,000.00 F) 44 TUBULAR BICYCLE RAILING M 500.0000 72,000.00 116.000 58,000.00 116.000 58,000.00 F) 45 CONCRETE BARRIER (TYPE 26 MODIFIED) M 1,000.0000 51,000.00 34.000 34,000.00 F) 46 CONCRETE BARRIER (TYPE 27B MODIFIED) M 1,000.0000 56,000.00 2.000 2,000.00 58.000 58,000.00 47 TRANSITION RAILING (TYPE WB) EA 5,000.0000 15,000.00 2.000 10,000.00 3.000 15,000.00 48 END CAP (TYPE TC) EA 2,000.0000 6,000.00 1.000 2,000.00 49 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000.00 PROGRAM CAS145 PAGE 3 DATE 12/23/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-119734 TIME 10:21 AM ESTIMATE NO. 07 BID OPENING 12/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/09 R.E. NAME: SHALVIRI, ALI DATE OF THIS ESTIMATE 12/23/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 CRASH CUSHION (REACT 9SCBS) EA 15,000.0000 15,000.00 0.950 14,250.00 0.950 14,250.00 51 CONCRETE BARRIER (TYPE 80 MODIFIED) M 1,000.0000 144,000.00 29.100 29,100.00 144.000 144,000.00 F) 52 PAINT TRAFFIC STRIPE (2-COAT) M 10.0000 18,000.00 1,233.000 12,330.00 1,233.000 12,330.00 53 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 4,100.00 94.000 940.00 94.000 940.00 PROGRAM CAS145 PAGE 4 DATE 12/23/09 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-119734 TIME 10:21 AM ESTIMATE NO. 07 BID OPENING 12/11/08 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 12/20/09 R.E. NAME: SHALVIRI, ALI DATE OF THIS ESTIMATE 12/23/09 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 232,273.00 837,250.40 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 565.12 746.71 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 232,838.12 837,997.11 54 MOBILIZATION LS 1,000.0000 1,000.00 1.000 1,000.00 ORIGINAL CONTRACT AMOUNT 886,360.00 TOTAL WORK COMPLETED 232,838.12 838,997.11 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -42,000.00 -42,000.00 TOTAL 190,838.12 796,997.11 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 01/27/09 135 02/11/09 00/00/00 12/30/09 176 24 5 27 88% 100% PROGRESS IS SATISFACTORY SHALVIRI, ALI RESIDENT ENGINEER PROGRAM CAS145 PAGE 5 DATE 12/23/09