PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 10/25/06 EST. NO.05 TIME 08:55 AM R.E. NAME: WANG, PAUL 07-120934 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 814.00 E.W. @ F.A.(+) 082306 N 0009.0 0002 209.32 092006 N 0020.0 0003 995.89 081006 N 0002.0 0004 577.12 081506 N 0003.0 002 0001 602.45 E.W. @ F.A.(+) 081706 N 0005.0 0002 328.66 082106 N 0007.0 0003 173.45 082206 N 0008.0 004 0001 7,493.09 E.W. @ F.A.(+) 092706 N 0014.0 0002 7,711.77 092806 N 0015.0 0003 7,239.18 092906 N 0016.0 005 0001 517.92 E.W. @ F.A.(+) 100406 N 0018.0 0002 258.94 100406 N 0019.0 006 0001 509.40 E.W. @ F.A.(+) 090606 N 0011.0 007 0001 758.60 E.W. @ F.A.(+) 091506 N 0012.0 0002 1,302.09 092606 N 0013.0 0003 639.71 100206 N 0017.0 30,131.59 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 30,131.59 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 10/25/06 EST. NO.05 TIME 08:55 AM R.E. NAME: WANG, PAUL 07-120934 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE CPM NONCOMPLIANCE -51,285.00 02 0.00 -51,285.00 LABOR COMPLIANCE VIOLATION MARCH 06 -1,900.00 01 MARCH 06 1,900.00 02 JULY 06 -10,000.00 03 AUGUST 06 & MAY 06 -10,000.00 04 JULY 06 10,000.00 04 0.00 -10,000.00 TOTAL DEDUCTIONS 0.00 -61,285.00 PROGRAM CAS145 PAGE 1 DATE 10/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-120934 TIME 08:55 AM ESTIMATE NO. 05 BID OPENING 10/27/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/06 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 10/25/06 LOCATION PROGRESS ESTIMATE 07-LA-710-6.8/R9.4 ----------------- GOLDEN STATE UTILITY CO IN LOS ANGELES COUNTY IN LONG BEACH PO BOX 2968 FROM ROUTE 1 TO ROUTE 405 AND 710 TURLOCK, CA 95381-2968 SEPARATION FED. AID NO. ACNH-710 -1(787)E INSTALL COMMUNICATION SYSTEM ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH) LS 5,000.0000 5,000.00 0.200 1,000.00 02 PREPARE WATER POLLUTION CONTROL LS 6,000.0000 6,000.00 1.000 6,000.00 PROGRAM 03 WATER POLLUTION CONTROL LS 25,000.0000 25,000.00 0.250 6,250.00 0.300 7,500.00 04 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.700 7,000.00 S) 05 TRAFFIC CONTROL SYSTEM LS 50,000.0000 50,000.00 0.250 12,500.00 0.350 17,500.00 S) 06 REMOVE METAL BEAM GUARD RAILING M 235.0000 3,760.00 0.000 0.00 07 REMOVE CONCRETE CURB M 150.0000 4,800.00 0.000 0.00 08 CLEARING AND GRUBBING LS 5,000.0000 5,000.00 1.000 5,000.00 1.000 5,000.00 09 ROADWAY EXCAVATION (TYPE Z-2) M3 350.0000 29,050.00 0.000 0.00 (AERIALLY DEPOSITED LEAD) 10 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 11 ASPHALT CONCRETE (TYPE B) TONN 525.0000 47,775.00 0.000 0.00 12 GUARD RAILING DELINEATOR EA 195.0000 3,900.00 0.000 0.00 13 METAL BEAM GUARD RAILING (WOOD POST) M 250.0000 11,500.00 0.000 0.00 S) 14 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,450.0000 4,450.00 0.000 0.00 S) 15 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,485.0000 3,485.00 0.000 0.00 S) 16 TWO SIZE 103 CONDUITS M 88.0000 387,200.00 1,584.000 139,392.00 2,214.000 194,832.00 (TRENCH IN UNPAVED AREA) 17 TWO SIZE 103, TYPE 1, CONDUITS M 300.0000 30,000.00 123.000 36,900.00 123.000 36,900.00 (JACK BENEATH ROADWAY) 18 TWO SIZE 103, TYPE 1, CONDUITS M 250.0000 20,000.00 6.000 1,500.00 (TRENCH IN ASPHALT) 19 SIZE 25 INNERDUCT M 2.5000 92,500.00 0.000 0.00 20 12 SINGLEMODE FIBER OPTIC CABLE M 8.0000 8,000.00 0.000 0.00 21 48 SINGLEMODE FIBER OPTIC CABLE M 5.7500 89,125.00 0.000 0.00 22 FIBER OPTIC SPLICE CLOSURE EA 1,875.0000 24,375.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 10/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-120934 TIME 08:55 AM ESTIMATE NO. 05 BID OPENING 10/27/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/06 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 10/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 CABLE NODE (LOCATION LB068) LS 30,257.5000 30,257.50 0.000 0.00 24 DATA NODE (LOCATION LB095) LS 50,878.7500 50,878.75 0.000 0.00 25 VIDEO NODE (LOCATION LB095) LS 67,208.7500 67,208.75 0.000 0.00 26 CCTV CAMERA (LOCATION LB068) LS 37,087.7500 37,087.75 0.000 0.00 27 CCTV CAMERA (LOCATION LB073) LS 52,410.0000 52,410.00 0.000 0.00 28 CCTV CAMERA (LOCATION LB080) LS 36,410.0000 36,410.00 0.000 0.00 29 CCTV CAMERA (LOCATION LB095) LS 42,028.7500 42,028.75 0.000 0.00 30 TRAFFIC MONITORING STATION LS 47,872.5000 47,872.50 0.000 0.00 (LOCATION 2205) 31 TRAFFIC MONITORING STATION LS 40,065.0000 40,065.00 0.000 0.00 (LOCATION 2206) 32 TRAFFIC MONITORING STATION LS 152,060.0000 152,060.00 0.000 0.00 (LOCATION 2315) 33 TRAFFIC MONITORING STATION LS 60,078.7500 60,078.75 0.000 0.00 (LOCATION 2314) 34 RAMP METERING SYSTEM LS 98,552.5000 98,552.50 0.030 2,956.58 0.450 44,348.63 (LOCATION 0690) 35 RAMP METERING SYSTEM LS 118,323.7500 118,323.75 0.040 4,732.95 0.400 47,329.50 (LOCATION 0714) 36 RAMP METERING SYSTEM LS 129,796.2500 129,796.25 0.040 5,191.85 0.040 5,191.85 (LOCATION 0691) 37 RAMP METERING SYSTEM LS 111,621.2500 111,621.25 0.180 20,091.83 (LOCATION 0713) 38 RAMP METERING SYSTEM LS 109,248.7500 109,248.75 0.150 16,387.31 0.400 43,699.50 (LOCATION 0692) 39 RAMP METERING SYSTEM LS 135,767.5000 135,767.50 0.140 19,007.45 0.560 76,029.80 (LOCATION 0712) 40 RAMP METERING SYSTEM LS 99,098.7500 99,098.75 0.050 4,954.94 0.410 40,630.49 (LOCATION 0693) 41 RAMP METERING SYSTEM LS 145,087.5000 145,087.50 0.010 1,450.88 0.240 34,821.00 (LOCATION 0711) 42 RAMP METERING SYSTEM LS 164,110.0000 164,110.00 0.000 0.00 (LOCATION 0086) 43 MODIFY CABLE NODE LS 39,945.0000 39,945.00 0.000 0.00 (LOCATION SD076) 44 COMMUNICATION PULL BOX EA 1,800.0000 27,000.00 2.000 3,600.00 45 SPLICE VAULT EA 6,000.0000 78,000.00 1.000 6,000.00 2.000 12,000.00 46 SYSTEM TESTING AND DOCUMENTATION LS 30,000.0000 30,000.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 10/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-120934 TIME 08:55 AM ESTIMATE NO. 05 BID OPENING 10/27/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 10/20/06 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 10/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 260,723.96 609,974.60 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 30,131.59 30,131.59 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 290,855.55 640,106.19 47 MOBILIZATION LS 215,000.0000 215,000.00 0.200 43,000.00 0.950 204,250.00 ORIGINAL CONTRACT AMOUNT 2,983,829.00 TOTAL WORK COMPLETED 333,855.55 844,356.19 MATERIALS ON HAND ON SITE 124,023.55 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -61,285.00 TOTAL 333,855.55 907,094.74 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/29/05 350 12/14/05 00/00/00 06/04/07 192 16 0 0 27% 55% PROGRESS IS SATISFACTORY WANG, PAUL RESIDENT ENGINEER PROGRAM CAS145 PAGE 4 DATE 10/25/06