PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/09/99 EST. NO.39 TIME 12:23 PM R.E. NAME: LATHAM, FRANK 07-125604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0295 267.37 E.W. @ F.A.(+) 020399 N 0005.0 0296 219.58 020499 N 0006.0 0297 315.93 020599 N 000007 0298 65.36 040298 N 318.00 0299 1,851.75 082198 N 000052 0300 3,008.49 VAR N 93.0 0 0301 554.72 070898 N 000017 0302 126.05 070898 N 000048 0303 427.37 012299 N 0004.0 0304 427.37 012999 N 0001.0 0305 1,607.02 020698 N 000012 0306 1,289.46 020798 N 0275.0 0307 148.03 021097 N 000049 0308 361.21 012899 N 0002.0 0309 114.25 081497 N 0374.0 0310 320.86 120198 N 000084 009 0079 590.69 E.W. @ F.A.(+) 121098 N 022.00 0082 94.67 010899 N 21.0A0 029 0004 710.19 E.W. @ F.A.(+) 020399 N 0006.0 0005 217.44 020599 N 0007.0 0006 1,071.08 020599 N 0008.0 0007 2,829.77 020299 N 49.0 0 0008 664.56 010799 N 12.0 0 0009 632.91 010899 N 13.0 0 0010 632.91 011199 N 0014.0 0011 632.91 011299 N 015.00 0012 632.91 011399 N 17.0 0 0013 632.91 011499 N 018.00 0014 632.91 011599 N 0019.0 0015 1,318.71 021699 N 26A 0 0016 519.93 021799 N 27A 0 0017 1,692.98 021899 N 0028.0 0018 1,360.34 021999 N 30.0 0 0019 143.88 020399 N 23.0 0 0020 632.62 020399 N 10.0 0 0021 124.48 020499 N 0035.0 0022 981.38 020499 N 0009.0 0023 13,573.68 020599 N 0012.0 0025 382.81 021199 N 0022.0 0026 1,125.92 021699 N 21A 0 0027 418.96 021699 N 0029.0 0028 3,348.95 021799 N 025.00 0030 6,676.45 021899 N 0029.0 0031 429.47 021999 N 032.00 0032 1,201.39 021099 N 0021.0 0033 3,430.69 110498 N 0088.0 0034 8,806.11 021199 N 0020.0 0035 10,595.75 021999 N 0036.0 0037 6,816.66 020799 N 0011.0 033 0001 660.58 E.W. @ F.A.(+) 080698 N 000000 0002 635.13 120998 N 000000 PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 2 DATE 03/09/99 EST. NO.39 TIME 12:23 PM R.E. NAME: LATHAM, FRANK 07-125604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 0003 317.57 121098 N 000000 0004 135.29 121798 N 001.00 0005 313.80 021898 N 0003.0 037 0002 226.12 E.W. @ F.A.(+) 040698 N 0043.0 0003 270.58 031398 N 44.0 0 038 0049-1 -3,143.78 E.W. @ F.A.(+) 110998 N 000000 DAO CORRECTING ENTRY 0049-2 3,300.97 110998 N 000000 DAO CORRECTING ENTRY 0067 726.64 112498 N 7.0 0 0119-1 -661.56 112098 N 000047 DAO CORRECTING ENTRY 0119-2 1,309.78 112098 N 000047 DAO CORRECTING ENTRY 0131 2,998.40 110698 N 76.0 0 0132 541.51 110998 N 57.0 0 0133 1,322.57 122198 N 77.0 0 0134 6,229.34 121498 N 51.0 0 0135 6,919.84 121498 N 0049.2 0136 6,397.16 121698 N 0053.0 0137 5,096.53 121698 N 0052.0 0138 7,159.85 121898 N 0054.0 0139 4,799.63 121898 N 0055.0 0140 8,727.29 122898 N 62.0 0 0141 6,061.52 122898 N 56.0 0 0142 5,740.85 122998 N 63.0 0 0143 5,750.43 122998 N 64.0 0 0144 82.49 123198 N 78.0 0 0145 6,767.10 010499 N 0079.0 0146 1,069.95 011499 N 38.0 0 0147 3,619.11 011599 N 000000 0148 2,857.03 011999 N 000000 0149 477.95 011999 N 70.0 0 0150 3,107.21 012199 N 000000 0151 4,146.18 012299 N 000000 0152 3,498.22 012799 N 000000 0153 5,658.98 012899 N 000000 0154 4,403.30 012999 N 000000 0155 1,931.60 020299 N 000000 0156 359.84 020299 N 0046.0 0157 297.18 020899 N 72.0 0 0158 396.83 012299 N 86.0 0 0159 10,067.16 010699 N 067.00 0160 4,261.81 011899 N 000000 0161 5,244.98 010499 N 68.0 0 0162 4,224.67 010699 N 0060.0 0163 80.44 110698 N 47.0 0 0164 632.91 120398 N 73.0 0 0165 632.91 120498 N 74.0 0 0166 724.46 121798 N 75A 0 0167 176.81 121898 N 94.0 0 0168 337.34 110498 N 89.0 0 0169 600.87 111898 N 90.0 0 0170 1,243.08 122998 N 000000 0171 1,441.36 010599 N 000000 PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 3 DATE 03/09/99 EST. NO.39 TIME 12:23 PM R.E. NAME: LATHAM, FRANK 07-125604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 0172 414.44 011999 N 710 0 0173 3,847.83 012099 N 000000 0174 3,791.69 020199 N 000000 0175 1,953.22 020399 N 000000 0176 1,542.37 021099 N 87.0 0 0177 1,317.92 021699 N 91.0 0 0178 7,720.28 111698 N 49A 0 0179 7,716.15 121198 N 48A 0 0180 5,072.09 121198 N 50.0 0 0181 6,977.38 123098 N 66.0 0 0182 5,767.36 123098 N 65.0 0 0183 476.52 111998 N 000000 0184 176.45 102698 N 000000 0185 414.44 011899 N 85.0 0 046 0005 1,414.86 E.W. @ F.A.(+) 121498 N 4.0 0 273,442.65 TOTAL THIS ESTIMATE 2,206,614.77 TOTAL PREVIOUS ESTIMATE 2,480,057.42 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/09/99 EST. NO.39 TIME 12:23 PM R.E. NAME: LATHAM, FRANK 07-125604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE NON-COMPL:LTG@AQ.DUL -10,000.00 09 NON COMPL.LTG@AQ.DUL 10,000.00 13 UNSAFE WORK PRAC/STR -20,000.00 15 UNACCEPT SAW JTS PCC -10,000.00 19 UNSAFE WORK PRAC/STR 10,000.00 19 SWPPP ORTIZ -10,000.00 20 UNACCEPT SAW JTS PCC 10,000.00 20 UNSAFE WORK PRAC/STR 10,000.00 20 SWPPP ORTIZ 10,000.00 21 PCCP SAWING DEFICIT -10,000.00 23 MBGR AT SAND CYN -10,000.00 25 PCCP SAWING DEFICIT 10,000.00 25 STRIPE MAINTENANCE -10,000.00 25 UNSAFE WORK -ORTIZ -20,000.00 25 MBGR AT SAND CYN 10,000.00 26 NON MATAINING ELEC -10,000.00 26 UNSAFE WORK -ORTIZ 20,000.00 26 DMG.EXIST.VEG.-ORTIZ -10,000.00 28 STRIPE MAINTENANCE 10,000.00 29 DAMAGE TO PAVE-ORTIZ -20,000.00 30 NON MATAINING ELEC 10,000.00 30 DAMAGE TO PAVE-ORTIZ 20,000.00 31 NON PERF.SOLEDAD OFF -50,000.00 31 NON PERF.SOLEDAD OFF 50,000.00 32 DMG.EXIST.VEG.-ORTIZ 10,000.00 38 0.00 0.00 LABOR COMPLIANCE VIOLATION VAR PRS -10,000.00 16 VAR PRS 10,000.00 17 PAC.COAST A.C. -10,000.00 19 PAC.COAST A.C. 10,000.00 20 NORTHWEST SAVALA -10,000.00 25 NORTHWEST SAVALA 10,000.00 28 NORTHWEST -10,000.00 31 NORTHWEST 10,000.00 34 WESTCOAST -10,000.00 36 WESTCOAST 10,000.00 37 0.00 0.00 TOTAL DEDUCTIONS 0.00 0.00 PROGRAM CAS145 PAGE 1 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 LOCATION SUPPLEMENTAL PROGRESS ESTIMATE 07-LA-14-33.4/44.0 ------------------------------ FCI CONSTRUCTORS IN LOS ANGELES COUNTY IN AND NEAR P.O. BOX 33484 SANTA CLARITA FROM SAND CANYON GRANADA HILLS, CA 91344 ROAD OVERCROSSING TO 0.7 MILE NORTH OF ESCONDIDO CANYON ROAD OVERCROSSING FED. AID NO. CMLN-6207(14)Y ,STPL-6207(14)Y ,N-6207(14)Y WIDEN FREEWAY AND BRIDGES ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 001 PROGRESS SCHEDULE (CRITICAL PATH) LS 10,000.0000 10,000.00 0.920 9,200.00 002 TEMPORARY FENCE LF 5.0000 1,200.00 240.000 1,200.00 003 WATER POLLUTION CONTROL LS 35,000.0000 35,000.00 0.900 31,500.00 004 CONSTRUCTION AREA SIGNS LS 50,000.0000 50,000.00 0.920 46,000.00 005 TRAFFIC CONTROL SYSTEM LS 400,000.0000 400,000.00 0.890 356,000.00 006 TYPE III BARRICADE EA 100.0000 2,200.00 23.000 2,300.00 007 TEMPORARY TRAFFIC STRIPE (TAPE) LF 0.8000 546,400.00 598,949.000 479,159.20 008 TEMPORARY PAVEMENT MARKING (TAPE) SQFT 5.0000 3,350.00 1,840.300 9,201.50 009 CHANNELIZER (SURFACE MOUNTED) EA 22.0000 22,880.00 685.000 15,070.00 010 TEMPORARY PAVEMENT MARKER EA 2.0000 23,200.00 12,983.000 25,966.00 011 TEMPORARY RAILING (TYPE K) LF 4.5000 1003,500.00 237,980.000 1,070,910.00 012 TEMPORARY CRASH CUSHION MODULE EA 300.0000 237,000.00 883.000 264,900.00 013 REMOVE FENCE (TYPE BW) LF 2.0000 1,760.00 0.000 0.00 014 REMOVE CHAIN LINK FENCE LF 4.0000 1,000.00 0.000 0.00 015 REMOVE TRAFFIC STRIPE LF 0.5000 4,750.00 1,170.000 585.00 016 REMOVE PAINTED TRAFFIC STRIPE LF 0.4000 39,480.00 146,989.000 58,795.60 017 REMOVE PAVEMENT MARKING SQFT 3.0000 390.00 178.000 534.00 018 REMOVE THERMOPLASTIC TRAFFIC STRIPE AND SQFT 2.0000 2,700.00 226.000 452.00 PAVEMENT MARKING 019 REMOVE CONTRAST TREATMENT SQFT 0.5000 9,000.00 700.000 350.00 020 REMOVE PAVEMENT MARKER EA 0.6000 2,364.00 16,550.000 9,930.00 021 REMOVE ROADSIDE SIGN (WOOD POST) EA 100.0000 1,800.00 2.000 200.00 022 REMOVE ROADSIDE SIGN (METAL POST) EA 100.0000 700.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 023 REMOVE DRAINAGE FACILITIES LS 50,000.0000 50,000.00 1.000 50,000.00 024 SALVAGE DOUBLE THRIE BEAM BARRIER LF 4.5000 46,350.00 10,069.000 45,310.50 025 SALVAGE METAL BEAM GUARD RAILING LF 4.0000 4,800.00 625.000 2,500.00 026 RECONSTRUCT FENCE LF 3.0000 390.00 0.000 0.00 027 RECONSTRUCT DOUBLE THRIE BEAM BARRIER LF 11.0000 2,200.00 200.000 2,200.00 028 RECONSTRUCT METAL BEAM GUARD RAILING LF 11.0000 204,600.00 18,527.000 203,797.00 029 RELOCATE CONCRETE BARRIER (TYPE K) LF 3.0000 28,380.00 0.000 0.00 030 RELOCATE ROADSIDE SIGN EA 175.0000 5,775.00 11.000 1,925.00 031 RELOCATE ROADSIDE SIGN (METAL POST) EA 175.0000 350.00 1.000 175.00 032 ADJUST INLET TO GRADE EA 700.0000 70,000.00 112.000 78,400.00 033 ADJUST MANHOLE TO GRADE EA 900.0000 11,700.00 14.000 12,600.00 034 MODIFY BRIDGE MOUNTED SIGN STRUCTURE EA 1,500.0000 1,500.00 0.250 375.00 035 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 2.2500 16,942.50 4,277.610 9,624.62 (.15' MAXIMUM) 036 REMOVE CONCRETE CURB AND SIDEWALK CY 28.0000 20,160.00 719.610 20,149.08 037 REMOVE CONCRETE BARRIER LF 2.0000 59,400.00 29,625.000 59,250.00 038 CAP INLET EA 550.0000 32,450.00 60.500 33,275.00 039 CAP MANHOLE EA 2,000.0000 2,000.00 4.000 8,000.00 040 BRIDGE REMOVAL LS 70,000.0000 70,000.00 0.800 56,000.00 041 BRIDGE REMOVAL (PORTION), LOCATION A LS 23,000.0000 23,000.00 1.000 23,000.00 042 BRIDGE REMOVAL (PORTION), LOCATION B LS 28,000.0000 28,000.00 1.000 28,000.00 043 BRIDGE REMOVAL (PORTION), LOCATION C LS 39,000.0000 39,000.00 1.000 39,000.00 044 BRIDGE REMOVAL (PORTION), LOCATION D LS 25,000.0000 25,000.00 1.000 25,000.00 045 BRIDGE REMOVAL (PORTION), LOCATION E LS 28,000.0000 28,000.00 1.000 28,000.00 046 CLEARING AND GRUBBING LS 70,000.0000 70,000.00 0.900 63,000.00 047 ROADWAY EXCAVATION CY 6.2500 1568,750.00 238,643.600 1,491,522.50 048 ROCK EXCAVATION CY 40.0000 544,000.00 0.000 0.00 049 ROCK SCALING CY 3.0000 33,600.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 050 STRUCTURE EXCAVATION (BRIDGE) CY 20.0000 105,060.00 5,253.000 105,060.00 (F) 051 STRUCTURE EXCAVATION (RETAINING WALL) CY 30.0000 10,200.00 330.000 9,900.00 052 STRUCTURE BACKFILL (BRIDGE) CY 25.0000 87,500.00 3,500.000 87,500.00 (F) 053 STRUCTURE BACKFILL (RETAINING WALL) CY 25.0000 13,250.00 519.000 12,975.00 054 PERVIOUS BACKFILL MATERIAL (RETAINING CY 45.0000 2,250.00 30.000 1,350.00 WALL) 055 HIGHWAY PLANTING LS 15,000.0000 15,000.00 1.000 15,000.00 056 STRAW (EROSION CONTROL) TON 175.0000 2,975.00 5.540 969.50 057 SEED (EROSION CONTROL) LB 35.0000 7,700.00 132.180 4,626.30 058 COMMERCIAL FERTILIZER (EROSION CONTROL) LB 1.0000 850.00 569.000 569.00 059 PLANT (GROUP W) EA 20.0000 6,000.00 300.000 6,000.00 060 PLANT ESTABLISHMENT WORK LS 4,000.0000 4,000.00 0.900 3,600.00 061 CLASS 4 AGGREGATE SUBBASE CY 17.0000 18,700.00 1,604.000 27,268.00 062 CLASS 2 AGGREGATE BASE CY 20.0000 66,000.00 3,841.640 76,832.80 063 AGGREGATE BASE (APPROACH SLAB) CY 50.0000 4,750.00 0.000 0.00 064 CLASS 3 AGGREGATE BASE CY 9.0000 972,000.00 97,809.800 880,288.20 065 LEAN CONCRETE BASE CY 46.0000 1315,600.00 27,942.560 1,285,357.76 066 CEMENT TREATED PERMEABLE BASE CY 44.0000 1113,200.00 20,001.330 880,058.52 067 ASPHALT CONCRETE (TYPE B) TON 29.0000 316,100.00 12,731.340 369,208.86 068 PLACE ASPHALT CONCRETE (MISCELLANEOUS SQYD 9.0000 46,170.00 4,590.000 41,310.00 AREA) 069 PLACE ASPHALT CONCRETE DIKE (TYPE A) LF 0.6000 32,520.00 42,969.000 25,781.40 070 PLACE ASPHALT CONCRETE DIKE (TYPE B) LF 0.6000 4,560.00 122.000 73.20 071 PLACE ASPHALT CONCRETE DIKE (TYPE E) LF 0.6000 13,320.00 15,390.000 9,234.00 072 CONCRETE PAVEMENT CY 51.0000 5763,000.00 94,755.230 4,832,516.73 073 DRILL AND GROUT TIE BAR EA 5.0000 425,500.00 77,601.000 388,005.00 074 16" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 21.0000 8,820.00 322.000 6,762.00 075 24" CAST-IN-DRILLED-HOLE CONCRETE PILING LF 25.0000 57,750.00 2,290.000 57,250.00 (S) 076 16" CAST-IN-DRILLED-HOLE CONCRETE LF 18.0000 192,780.00 9,750.000 175,500.00 PILING (SOUND WALL) PROGRAM CAS145 PAGE 4 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 077 TIEDOWN ANCHOR EA 3,000.0000 144,000.00 48.000 144,000.00 (S) 078 STRUCTURAL CONCRETE, BRIDGE FOOTING CY 300.0000 338,700.00 1,129.000 338,700.00 (F) 079 STRUCTURAL CONCRETE, BRIDGE CY 465.0000 1808,850.00 3,852.000 1,791,180.00 (F) 080 STRUCTURAL CONCRETE, RETAINING WALL CY 275.0000 52,250.00 179.000 49,225.00 081 STRUCTURAL CONCRETE, SEISMIC APPROACH CY 300.0000 72,900.00 243.000 72,900.00 (F) SLAB (TYPE N) 082 STRUCTURAL CONCRETE, SEISMIC APPROACH CY 300.0000 114,000.00 402.000 120,600.00 SLAB (TYPE R) 083 STRUCTURAL CONCRETE, APPROACH SLAB CY 360.0000 270,360.00 751.000 270,360.00 (F) (TYPE N) 084 STRUCTURAL CONCRETE, APPROACH SLAB CY 330.0000 250,800.00 835.000 275,550.00 (TYPE R) 085 MINOR CONCRETE (MINOR STRUCTURE) CY 1,000.0000 403,000.00 401.360 401,360.00 086 MINOR CONCRETE (BACKFILL) CY 85.0000 4,675.00 67.730 5,757.05 087 PAVING NOTCH EXTENSION CY 1,800.0000 55,800.00 25.770 46,386.00 088 DRILL AND BOND DOWEL LF 15.0000 31,050.00 2,286.000 34,290.00 089 FURNISH PRECAST CONCRETE GIRDER EA 3,000.0000 42,000.00 14.000 42,000.00 (30'-40') 090 FURNISH PRECAST CONCRETE DECK UNIT EA 1,500.0000 58,500.00 39.000 58,500.00 (SLAB TYPE) (20'-30') 091 FURNISH PRECAST PRESTRESSED CONCRETE EA 4,500.0000 121,500.00 27.000 121,500.00 GIRDER (40'-50') 092 FURNISH PRECAST PRESTRESSED CONCRETE EA 5,500.0000 49,500.00 9.000 49,500.00 GIRDER (50'-60') 093 FURNISH PRECAST PRESTRESSED CONCRETE EA 7,000.0000 28,000.00 4.000 28,000.00 GIRDER (60'-70') 094 FURNISH PRECAST PRESTRESSED CONCRETE EA 7,000.0000 126,000.00 3.000 21,000.00 GIRDER (70'-80') 095 FURNISH PRECAST PRESTRESSED CONCRETE EA 12,000.0000 180,000.00 0.000 0.00 GIRDER (100'-110') 096 FURNISH PRECAST PRESTRESSED CONCRETE EA 2,500.0000 90,000.00 36.000 90,000.00 DECK UNIT (SLAB TYPE) (30'-40') 097 ERECT PRECAST CONCRETE GIRDER EA 500.0000 7,000.00 14.000 7,000.00 (S) 098 ERECT PRECAST CONCRETE DECK UNIT EA 600.0000 23,400.00 39.000 23,400.00 (S) 099 ERECT PRECAST PRESTRESSED CONCRETE EA 600.0000 43,800.00 43.000 25,800.00 (S) GIRDER 100 ERECT PRECAST PRESTRESSED CONCRETE DECK EA 600.0000 21,600.00 36.000 21,600.00 (S) UNIT 101 REFINISH BRIDGE DECK SQFT 25.0000 11,750.00 396.000 9,900.00 102 SOUND WALL (BARRIER) SQFT 22.0000 30,162.00 1,169.000 25,718.00 (F) (CAST-IN-PLACE CONCRETE) 103 SOUND WALL (MASONRY BLOCK) SQFT 6.7500 390,150.00 0.000 0.00 PROGRAM CAS145 PAGE 5 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 104 WATERSTOP LF 10.0000 160.00 16.000 160.00 105 JOINT SEAL (MR 1/2") LF 20.0000 16,400.00 0.000 0.00 (S) 106 JOINT SEAL (TYPE B-MR 1") LF 22.0000 18,920.00 841.500 18,513.00 (S) 107 BAR REINFORCING STEEL (BRIDGE) LB 0.4600 578,450.00 1,257,500.000 578,450.00 (SF) 108 BAR REINFORCING STEEL (RETAINING WALL) LB 0.5000 5,000.00 9,620.000 4,810.00 109 FURNISH SIGN STRUCTURE LB 2.0000 56,400.00 0.000 0.00 (TUBULAR MODIFIED) 110 INSTALL SIGN STRUCTURE LB 0.4000 11,280.00 0.000 0.00 (TUBULAR MODIFIED) 111 FURNISH SIGN STRUCTURE (LIGHTWEIGHT) LB 2.0000 10,150.00 0.000 0.00 112 INSTALL SIGN STRUCTURE (LIGHTWEIGHT) LB 0.5000 2,537.50 0.000 0.00 113 FURNISH SIGN STRUCTURE (TRUSS) LB 2.0000 11,400.00 40,612.000 81,224.00 114 INSTALL SIGN STRUCTURE (TRUSS) LB 0.2500 1,425.00 40,612.000 10,153.00 115 FURNISH SIGN STRUCTURE (BRIDGE MOUNTED LB 5.0000 1,650.00 0.000 0.00 WITHOUT WALKWAY) 116 INSTALL SIGN STRUCTURE (BRIDGE MOUNTED LB 3.0000 990.00 0.000 0.00 WITHOUT WALKWAY) 117 30" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 200.0000 24,000.00 85.000 17,000.00 (SIGN FOUNDATION) 118 36" CAST-IN-DRILLED-HOLE CONCRETE PILE LF 250.0000 8,000.00 74.000 18,500.00 (SIGN FOUNDATION) 119 METAL (RAIL MOUNTED SIGN) LB 7.0000 15,120.00 1,862.000 13,034.00 120 ROADSIDE SIGN - ONE POST EA 200.0000 2,800.00 0.000 0.00 121 ROADSIDE SIGN - TWO POST EA 350.0000 3,150.00 0.000 0.00 122 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 100.0000 600.00 1.000 100.00 METHOD) 123 INSTALL SIGN OVERLAY SQFT 15.0000 2,100.00 0.000 0.00 124 INSTALL SIGN PANEL ON EXISTING FRAME SQFT 8.0000 2,240.00 0.000 0.00 125 INSTALL ROADSIDE SIGN EA 1,100.0000 14,300.00 0.000 0.00 (LAMINATED WOOD BOX POST) 126 18" ALTERNATIVE PIPE CULVERT LF 45.0000 32,850.00 622.000 27,990.00 127 24" ALTERNATIVE PIPE CULVERT LF 60.0000 25,800.00 640.000 38,400.00 128 12" PLASTIC PIPE LF 30.0000 14,100.00 476.000 14,280.00 129 18" REINFORCED CONCRETE PIPE LF 50.0000 50,500.00 1,012.000 50,600.00 130 24" REINFORCED CONCRETE PIPE LF 60.0000 199,800.00 3,300.000 198,000.00 PROGRAM CAS145 PAGE 6 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 131 27" REINFORCED CONCRETE PIPE LF 60.0000 480.00 8.000 480.00 132 18" SLOTTED CORRUGATED STEEL PIPE LF 60.0000 15,000.00 214.000 12,840.00 (.079" THICK) 133 3" PLASTIC PIPE (EDGE DRAIN) LF 4.2500 429,250.00 91,358.950 388,275.54 134 3" PLASTIC PIPE (EDGE DRAIN OUTLET) LF 37.0000 166,500.00 5,077.500 187,867.50 135 ENTRANCE TAPER EA 400.0000 2,000.00 5.000 2,000.00 136 18" ALTERNATIVE PIPE DOWNDRAIN LF 60.0000 27,000.00 736.000 44,160.00 137 24" ALTERNATIVE PIPE DOWNDRAIN LF 60.0000 7,800.00 126.000 7,560.00 138 ROCK SLOPE PROTECTION CY 125.0000 5,000.00 27.300 3,412.50 (FACING, METHOD B) 139 SLOPE PAVING (CONCRETE) CY 330.0000 23,100.00 0.000 0.00 (F) 140 MINOR CONCRETE (CURB, GUTTER, SIDEWALK CY 150.0000 43,500.00 319.740 47,961.00 AND DRIVEWAY) 141 MINOR CONCRETE (GUTTER) CY 200.0000 1,800.00 9.500 1,900.00 142 MISCELLANEOUS IRON AND STEEL LB 1.0000 45,900.00 45,065.000 45,065.00 143 MISCELLANEOUS METAL (BRIDGE) LB 3.0000 1,590.00 530.000 1,590.00 (SF) 144 CHAIN LINK FENCE (MODIFIED) LF 7.0000 29,610.00 0.000 0.00 145 CHAIN LINK FENCE (TYPE CL-6) LF 7.0000 2,800.00 0.000 0.00 146 GROUND ANCHOR (TYPE A) EA 900.0000 18,900.00 21.000 18,900.00 147 WIRE MESH SQYD 40.0000 68,000.00 1,700.000 68,000.00 148 INSTALL MEDIAN MILEAGE PANEL EA 50.0000 4,900.00 74.000 3,700.00 149 METAL BEAM GUARD RAILING (WOOD POST) LF 15.0000 274,500.00 15,800.000 237,000.00 150 CHAIN LINK RAILING (TYPE 7) LF 30.0000 14,370.00 479.000 14,370.00 (SF) 151 CONCRETE BARRIER (TYPE 25) LF 40.0000 60,160.00 1,367.000 54,680.00 (F) 152 CONCRETE BARRIER (TYPE 26) LF 90.0000 43,110.00 479.000 43,110.00 (F) 153 CONCRETE BARRIER (TYPE 27SV) LF 50.0000 182,500.00 3,529.000 176,450.00 154 CONCRETE BARRIER (TYPE 27 MODIFIED) LF 45.0000 5,445.00 109.000 4,905.00 (F) 155 CONCRETE BARRIER (TYPE 50W MODIFIED) LF 43.0000 1075,000.00 28,140.000 1,210,020.00 156 CONCRETE BARRIER (TYPE 50) LF 16.0000 190,400.00 12,608.000 201,728.00 157 CONCRETE BARRIER (TYPE 50A) LF 16.0000 15,424.00 963.000 15,408.00 (F) PROGRAM CAS145 PAGE 7 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 158 CONCRETE BARRIER (TYPE 50C) LF 18.0000 166,320.00 8,300.000 149,400.00 159 CONCRETE BARRIER (TYPE 50D) LF 30.0000 8,400.00 0.000 0.00 160 CONCRETE BARRIER (TYPE 50E) LF 90.0000 18,900.00 800.000 72,000.00 161 CONCRETE BARRIER (TYPE 50F) LF 100.0000 52,000.00 0.000 0.00 162 CABLE RAILING LF 15.0000 5,550.00 0.000 0.00 (F) 163 BURIED POST ANCHOR EA 150.0000 2,700.00 15.000 2,250.00 164 CABLE ANCHOR ASSEMBLY EA 600.0000 19,200.00 6.000 3,600.00 (BREAKAWAY, TYPE A) 165 CABLE ANCHOR ASSEMBLY EA 500.0000 15,500.00 6.000 3,000.00 (BREAKAWAY, TYPE B) 166 TERMINAL SECTION (TYPE C) EA 100.0000 2,500.00 4.000 400.00 167 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.3000 125,100.00 0.000 0.00 168 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 4,900.00 760.000 760.00 169 THERMOPLASTIC PAVEMENT MARKING SQFT 3.0000 26,100.00 1,059.000 3,177.00 170 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.4000 560.00 471.000 188.40 (BROKEN 17-7) 171 8" THERMOPLASTIC TRAFFIC STRIPE LF 1.0000 10,400.00 0.000 0.00 (BROKEN 36-12) 172 PAINT TRAFFIC STRIPE (2-COAT) LF 0.1000 11,800.00 38,558.000 3,855.80 173 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.5000 21,450.00 993.000 1,489.50 174 PAVEMENT MARKER (REFLECTIVE) EA 2.5000 37,750.00 770.000 1,925.00 175 SIGNAL AND LIGHTING LS 60,000.0000 60,000.00 0.950 57,000.00 176 LIGHTING AND SIGN ILLUMINATION LS 200,000.0000 200,000.00 0.980 196,000.00 177 LIGHTING CONDUIT (BRIDGE) LS 10,000.0000 10,000.00 1.000 10,000.00 178 COMMUNICATION CONDUIT (BRIDGE) LS 33,000.0000 33,000.00 0.950 31,350.00 179 TRAFFIC MONITORING STATION (LOCATION 1) LS 25,000.0000 25,000.00 0.900 22,500.00 180 TRAFFIC MONITORING STATION (LOCATION 2) LS 30,000.0000 30,000.00 0.900 27,000.00 181 TRAFFIC MONITORING STATION (LOCATION 3) LS 33,000.0000 33,000.00 0.900 29,700.00 182 TRAFFIC MONITORING STATION (LOCATION 4) LS 30,000.0000 30,000.00 0.900 27,000.00 183 TRAFFIC MONITORING STATION (LOCATION 5) LS 33,000.0000 33,000.00 0.950 31,350.00 184 TRAFFIC MONITORING STATION (LOCATION 6) LS 33,000.0000 33,000.00 0.950 31,350.00 PROGRAM CAS145 PAGE 8 DATE 03/09/99 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-125604 TIME 12:23 PM ESTIMATE NO. 39 BID OPENING 05/23/96 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/99 R.E. NAME: LATHAM, FRANK DATE OF THIS ESTIMATE 03/09/99 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 0.00 22,608,471.56 ADJUSTMENT OF COMPENSATION 0.00 450,894.09 EXTRA WORK 273,442.65 2,029,163.33 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 273,442.65 25,088,528.98 185 MOBILIZATION LS 2714,000.0000 2714,000.00 1.000 2,714,000.00 ORIGINAL CONTRACT AMOUNT 28,354,615.00 TOTAL WORK COMPLETED 273,442.65 27,802,528.98 MATERIALS ON HAND ON SITE 6,974.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 273,442.65 27,809,502.98 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/12/96 680 08/06/96 07/29/96 06/01/99 567 69 16 16 90% 79% PROGRESS IS SATISFACTORY LATHAM, FRANK RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 03/09/99