PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 05/24/07 EST. NO.04 TIME 12:15 PM R.E. NAME: WANG, PAUL 07-140604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 3,401.93 E.W. @ F.A.(+) 021607 N 1 0 0002 2,364.96 020907 N 0002 0 0003 982.09 021207 N 03 0 0004 6,764.81 021507 N 4 0 13,513.79 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 13,513.79 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 05/24/07 EST. NO.04 TIME 12:15 PM R.E. NAME: WANG, PAUL 07-140604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 006 -400.00 01 0.00 -400.00 TOTAL DEDUCTIONS 0.00 -400.00 PROGRAM CAS145 PAGE 1 DATE 05/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-140604 TIME 12:15 PM ESTIMATE NO. 04 BID OPENING 09/21/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/07 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 05/24/07 LOCATION RERUN PROGRESS ESTIMATE 07-LA-10-R11.6/15.2 ----------------------- CSI ELECTRICAL CONTRACTORS,INC IN LOS ANGELES COUNTY IN 10623 FULTONS WELLS RD LOS ANGELES AT VARIOUS LOCATIONS SANTA FE SPRINGS, CA 90670 FED. AID NO. ACIM-X037(126)E LIGHTING AND SIGN ILLUMINATION ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 1,540.0000 1,540.00 1.000 1,540.00 PROGRAM 02 WATER POLLUTION CONTROL LS 32,500.0000 32,500.00 0.300 9,750.00 03 CONSTRUCTION AREA SIGNS LS 12,075.0000 12,075.00 0.800 9,660.00 S) 04 TRAFFIC CONTROL SYSTEM LS 422,400.0000 422,400.00 0.100 42,240.00 0.330 139,392.00 S) 05 REMOVE CHAIN LINK FENCE M 157.3000 943.80 0.000 0.00 S) 06 LEAD COMPLIANCE PLAN LS 5,500.0000 5,500.00 0.800 4,400.00 07 MINOR CONCRETE (MISCELLANEOUS M3 8,185.6900 16,371.38 0.000 0.00 S) CONSTRUCTION) 08 CHAIN LINK FENCE (TYPE CL-1.8) M 170.5000 2,557.50 0.000 0.00 S) 09 1.2 M CHAIN LINK GATE (TYPE CL-1.8) EA 1,372.8000 1,372.80 0.000 0.00 S) 10 LIGHTING (TEMPORARY) LS 172,832.1800 172,832.18 0.400 69,132.87 11 TYPE 15 LIGHTING STANDARD 200-WATT HIGH EA 4,644.8600 60,383.18 1.000 4,644.86 PRESSURE SODIUM LUMINAIRE AND FOUNDATION 12 TYPE 15 LIGHTING STANDARD 310-WATT HIGH EA 5,758.2100 253,361.24 8.000 46,065.68 PRESSURE SODIUM LUMINAIRE AND FOUNDATION 13 WOOD POLE EA 2,827.8900 2,827.89 1.000 2,827.89 14 SIGN LIGHT DISCONNECT SWITCH EA 373.6700 11,583.77 0.000 0.00 15 MODIFY SIGN LIGHTING FIXTURE WITH EA 713.8400 69,956.32 3.000 2,141.52 23.000 16,418.32 85-WATT INDUCTION SIGN LIGHTING 16 TYPE III-BF SERVICE EQUIPMENT ENCLOSURE EA 3,137.7900 12,551.16 4.000 12,551.16 WITH FOUNDATION 17 ADD CIRCUIT BREAKER EA 126.8000 2,409.20 19.000 2,409.20 18 ADD TYPE V PHOTOELECTRIC CONTROL EA 225.6300 1,128.15 5.000 1,128.15 19 SIZE 53 CONDUIT M 59.5700 297,850.00 43.000 2,561.51 2,559.000 152,439.63 20 SIZE 78 CONDUIT M 92.4500 7,765.80 0.000 0.00 21 SIZE 53 CONDUIT (BORE) M 118.3700 20,122.90 34.000 4,024.58 78.000 9,232.86 22 MODIFY LUMINAIRE WITH 200-WATT HIGH EA 493.6300 16,289.79 20.000 9,872.60 PRESSURE SODIUM PROGRAM CAS145 PAGE 2 DATE 05/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-140604 TIME 12:15 PM ESTIMATE NO. 04 BID OPENING 09/21/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/07 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 05/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 MODIFY LUMINAIRE WITH 310-WATT HIGH EA 501.0000 85,170.00 10.000 5,010.00 67.000 33,567.00 PRESSURE SODIUM 24 MODIFY FLUSH SOFFIT LUMINAIRE TO EA 475.3900 45,162.05 39.000 18,540.21 48.000 22,818.72 100-WATT HIGH PRESSURE SODIUM 25 REMOVE SERIES SERVICE/120 V SERVICE EA 959.0900 8,631.81 0.000 0.00 26 REMOVE LIGHTING STANDARD EA 898.2500 52,996.75 4.000 3,593.00 4.000 3,593.00 27 REMOVE SERVICE EQUIPMENT ENCLOSURE AND EA 872.3100 2,616.93 1.000 872.31 FOUNDATION 28 REMOVE TRANSFORMER EA 54.4700 16,341.00 3.000 163.41 87.000 4,738.89 29 REMOVE SIGN ILLUMINATION EQUIPMENT AND EA 118.4700 13,505.58 28.000 3,317.16 MERCURY VAPOR 30 CONDUCTOR (NO. 8 BARE GROUNDING WIRE) M 4.5000 74,700.00 13,326.000 59,967.00 31 CONDUCTOR (NO. 6) M 5.8700 251,823.00 35,682.000 209,453.34 32 REMOVE CONDUCTOR M 1.2200 16,226.00 11,801.000 14,397.22 33 NO. 5 PULL BOX EA 937.0300 159,295.10 20.000 18,740.60 64.000 59,969.92 34 REMOVE PULL BOX EA 225.0200 36,003.20 10.000 2,250.20 39.000 8,775.78 35 REPLACE PULL BOX COVER LS 15,996.1200 15,996.12 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 05/24/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-140604 TIME 12:15 PM ESTIMATE NO. 04 BID OPENING 09/21/06 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 05/20/07 R.E. NAME: WANG, PAUL DATE OF THIS ESTIMATE 05/24/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 99,265.03 912,935.56 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 13,513.79 13,513.79 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 112,778.82 926,449.35 36 MOBILIZATION LS 19,403.7800 19,403.78 0.950 18,433.59 ORIGINAL CONTRACT AMOUNT 2,222,193.38 TOTAL WORK COMPLETED 112,778.82 944,882.94 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -400.00 TOTAL 112,778.82 944,482.94 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 006 LEAD COMPLIANCE PLAN 5,000.00 5,500.00 500.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 10/23/06 120 01/22/07 01/22/07 07/16/07 81 2 0 0 42% 68% PROGRESS IS SATISFACTORY WANG, PAUL RESIDENT ENGINEER PROGRAM CAS145 DATE 05/24/07