PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 09/22/06 EST. NO.18 TIME 02:00 PM R.E. NAME: SAYKALI, ZARIF 07-1693A4 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 09/22/06 EST. NO.18 TIME 02:00 PM R.E. NAME: SAYKALI, ZARIF 07-1693A4 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE ELECTRICAL INSPECT. -5,000.00 05 0.00 -5,000.00 LABOR COMPLIANCE VIOLATION OCT O5 -10,000.00 08 OCT 10,000.00 09 DEC 05 - LA SIGNAL -7,523.89 10 DEC 05- LA SIGNAL 7,523.89 15 JUNE 06 -3,005.20 16 JUNE 06 3,005.20 17 0.00 0.00 TOTAL DEDUCTIONS 0.00 -5,000.00 PROGRAM CAS145 PAGE 1 DATE 09/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1693A4 TIME 02:00 PM ESTIMATE NO. 18 BID OPENING 12/16/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 09/22/06 LOCATION PROGRESS ESTIMATE 07-LA-90-R1.0/R1.8 ----------------- D.W. POWELL CONSTRUCTION, INC. IN LOS ANGELES COUNTY FROM 0.1 KM P.O. BOX 1406 EAST OF BALLONA CREEK BRIDGE TO FONTANA, CA 92334-1406 0.4 KM EAST OF CENTINELA AVENUE UNDERCROSSING FED. AID NO. N O N E WIDEN EXISTING RAMP ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE STORM WATER POLLUTION LS 2,000.0000 2,000.00 1.000 2,000.00 PREVENTION PLAN 02 WATER POLLUTION CONTROL LS 40,000.0000 40,000.00 1.000 40,000.00 03 CONSTRUCTION AREA SIGNS LS 4,000.0000 4,000.00 0.950 3,800.00 S) 04 TRAFFIC CONTROL SYSTEM LS 40,000.0000 40,000.00 0.950 38,000.00 S) 05 TEMPORARY TRAFFIC STRIPE (TAPE) M 6.0000 5,880.00 980.000 5,880.00 S) 06 TEMPORARY PAVEMENT MARKING (TAPE) M2 100.0000 3,000.00 30.000 3,000.00 S) 07 CHANNELIZER (SURFACE MOUNTED) EA 30.0000 1,170.00 39.000 1,170.00 S) 08 TEMPORARY PAVEMENT MARKER EA 10.0000 830.00 83.000 830.00 S) 09 TEMPORARY RAILING (TYPE K) M 35.0000 31,150.00 890.000 31,150.00 S) 10 TEMPORARY CRASH CUSHION MODULE EA 300.0000 16,800.00 56.000 16,800.00 S) 11 REMOVE METAL BEAM GUARD RAILING M 20.0000 5,800.00 290.000 5,800.00 12 REMOVE TRAFFIC STRIPE M 2.5000 2,400.00 960.000 2,400.00 13 REMOVE PAVEMENT MARKING M2 25.0000 500.00 20.000 500.00 14 REMOVE YELLOW TRAFFIC STRIPE M 3.0000 1,620.00 539.000 1,617.00 15 REMOVE PAVEMENT MARKER EA 2.0000 240.00 120.000 240.00 16 REMOVE ROADSIDE SIGN EA 40.0000 600.00 15.000 600.00 17 REMOVE ROADSIDE SIGN PANEL EA 40.0000 840.00 21.000 840.00 18 REMOVE ASPHALT CONCRETE DIKE M 5.0000 3,900.00 780.000 3,900.00 19 REMOVE PIPE M 400.0000 840.00 2.100 840.00 20 REMOVE INLET EA 1,100.0000 2,200.00 2.000 2,200.00 21 REMOVE CONCRETE (CURB AND GUTTER) M 15.0000 5,400.00 360.000 5,400.00 22 REMOVE CONCRETE SIDEWALK M2 10.0000 440.00 44.000 440.00 PROGRAM CAS145 PAGE 2 DATE 09/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1693A4 TIME 02:00 PM ESTIMATE NO. 18 BID OPENING 12/16/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 09/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 REMOVE CONCRETE ISLAND (PORTIONS) M3 250.0000 1,250.00 5.000 1,250.00 24 CLEARING AND GRUBBING LS 57,000.0000 57,000.00 1.000 57,000.00 25 ROADWAY EXCAVATION M3 60.0000 127,800.00 2,138.500 128,310.00 26 ROADWAY EXCAVATION (TYPE Z-2) M3 150.0000 40,500.00 270.000 40,500.00 (AERIALLY DEPOSITED LEAD) 27 LEAD COMPLIANCE PLAN LS 5,000.0000 5,000.00 1.000 5,000.00 28 IMPORTED BORROW M3 0.1000 128.00 1,340.000 134.00 29 HIGHWAY PLANTING LS 20,000.0000 20,000.00 0.300 6,000.00 S) 30 ROCK BLANKET M2 85.0000 29,750.00 350.000 29,750.00 S) 31 STRAW (EROSION CONTROL) TONN 300.0000 1,050.00 2.500 750.00 S) 32 FIBER (EROSION CONTROL) KG 2.0000 800.00 0.000 0.00 S) 33 COMPOST (EROSION CONTROL) KG 1.0000 1,200.00 0.000 0.00 S) 34 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 1,200.0000 2,400.00 0.000 0.00 S) 35 ENDOMYCORRHIZAL INOCULUM KG 10.0000 460.00 0.000 0.00 S) 36 PURE LIVE SEED (EROSION CONTROL) KG 150.0000 1,200.00 0.000 0.00 S) 37 STABILIZING EMULSION (EROSION CONTROL) KG 2.0000 170.00 0.000 0.00 S) 38 PLANT ESTABLISHMENT WORK LS 15,000.0000 15,000.00 0.100 1,500.00 0.800 12,000.00 S) 39 IRRIGATION SYSTEM LS 80,000.0000 80,000.00 1.000 80,000.00 S) 40 EXTEND 200 MM CONDUIT M 150.0000 6,000.00 40.000 6,000.00 S) 41 CLASS 4 AGGREGATE SUBBASE M3 40.0000 22,800.00 570.000 22,800.00 42 CLASS 2 AGGREGATE BASE M3 70.0000 76,300.00 1,085.000 75,950.00 43 ASPHALT CONCRETE (TYPE B) TONN 80.0000 112,000.00 1,512.000 120,960.00 44 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 20.0000 800.00 40.000 800.00 45 PLACE ASPHALT CONCRETE DIKE (TYPE E) M 20.0000 4,800.00 240.000 4,800.00 46 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 20.0000 460.00 23.000 460.00 47 400 MM CAST-IN-DRILLED-HOLE CONCRETE M 130.0000 432,900.00 3,263.400 424,242.00 S) PILING (BARRIER) 48 MINOR CONCRETE (MINOR STRUCTURE) M3 3,500.0000 14,700.00 4.200 14,700.00 F) 49 SOUND WALL (BARRIER) (MASONRY BLOCK) M2 130.0000 353,990.00 2,723.000 353,990.00 SF) PROGRAM CAS145 PAGE 3 DATE 09/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1693A4 TIME 02:00 PM ESTIMATE NO. 18 BID OPENING 12/16/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 09/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 FURNISH SIGN STRUCTURE (LIGHTWEIGHT) KG 8.0000 18,552.00 1,819.000 14,552.00 F) 51 INSTALL SIGN STRUCTURE (LIGHTWEIGHT) KG 1.5000 3,478.50 2,319.000 3,478.50 SF) 52 760 MM CAST-IN-DRILLED-HOLE M 1,000.0000 8,000.00 16.000 16,000.00 S) CONCRETE PILE (SIGN FOUNDATION) 53 ROADSIDE SIGN - ONE POST EA 220.0000 2,200.00 10.000 2,200.00 54 ROADSIDE SIGN - TWO POST EA 550.0000 1,100.00 2.000 1,100.00 55 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 75.0000 1,125.00 15.000 1,125.00 METHOD) 56 450 MM REINFORCED CONCRETE PIPE M 320.0000 18,560.00 58.000 18,560.00 57 675 MM REINFORCED CONCRETE PIPE M 600.0000 600.00 1.000 600.00 58 900 MM CORRUGATED STEEL PIPE RISER M 1,200.0000 5,760.00 4.800 5,760.00 (2.01 MM THICK) 59 450 MM CONCRETE FLARED END SECTION EA 700.0000 2,100.00 3.000 2,100.00 60 ROCK SLOPE PROTECTION (1/4T, METHOD B) M3 200.0000 2,600.00 13.000 2,600.00 61 ROCK SLOPE PROTECTION FABRIC M2 10.0000 400.00 40.000 400.00 62 MINOR CONCRETE (CURB AND GUTTER) M3 800.0000 7,200.00 9.000 7,200.00 63 MINOR CONCRETE (SIDEWALK) M3 650.0000 1,300.00 2.000 1,300.00 64 MINOR CONCRETE (CURB RAMP) M3 800.0000 2,400.00 3.000 2,400.00 65 MISCELLANEOUS IRON AND STEEL KG 2.0000 1,230.00 615.000 1,230.00 SF) 66 DELINEATOR (CLASS 1) EA 35.0000 630.00 18.000 630.00 67 METAL BEAM GUARD RAILING M 120.0000 2,760.00 23.000 2,760.00 S) 68 TERMINAL SYSTEM (TYPE SRT) EA 2,400.0000 4,800.00 2.000 4,800.00 S) 69 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 600.0000 1,200.00 2.000 1,200.00 S) 70 CRASH CUSHION (REACT 9CBB) EA 42,000.0000 42,000.00 1.000 42,000.00 S) 71 CONCRETE BARRIER (TYPE 736SV) M 450.0000 432,000.00 956.000 430,200.00 72 THERMOPLASTIC PAVEMENT MARKING M2 50.0000 4,150.00 94.550 4,727.50 S) 73 100 MM THERMOPLASTIC TRAFFIC STRIPE M 3.5000 2,625.00 750.000 2,625.00 S) 74 200 MM THERMOPLASTIC TRAFFIC STRIPE M 7.0000 1,960.00 310.890 2,176.23 S) 75 100 MM THERMOPLASTIC TRAFFIC STRIPE M 3.0000 900.00 300.000 900.00 S) (BROKEN 10.98 M - 3.66 M) 76 PAVEMENT MARKER (RETROREFLECTIVE) EA 10.0000 970.00 97.000 970.00 S) PROGRAM CAS145 PAGE 4 DATE 09/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1693A4 TIME 02:00 PM ESTIMATE NO. 18 BID OPENING 12/16/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 09/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 LIGHTING AND SIGN ILLUMINATION LS 230,000.0000 230,000.00 1.000 230,000.00 S) 78 MODIFY TRAFFIC MONITORING STATION LS 30,000.0000 30,000.00 1.000 30,000.00 S) (LOCATION 2261) 79 MODIFY SIGNAL AND LIGHTING LS 70,000.0000 70,000.00 1.000 70,000.00 S) (CITY - LOCATION 1) 80 MODIFY SIGNAL AND LIGHTING LS 40,000.0000 40,000.00 1.000 40,000.00 S) (CITY - LOCATION 2) 81 MODIFY LIGHTING (CITY) LS 35,000.0000 35,000.00 1.000 35,000.00 S) 82 MODIFY COMMUNICATION SYSTEM ROUTING LS 75,000.0000 75,000.00 1.000 75,000.00 S) PROGRAM CAS145 PAGE 5 DATE 09/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1693A4 TIME 02:00 PM ESTIMATE NO. 18 BID OPENING 12/16/04 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 09/20/06 R.E. NAME: SAYKALI, ZARIF DATE OF THIS ESTIMATE 09/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 1,500.00 2,606,397.23 ADJUSTMENT OF COMPENSATION 0.00 13,523.51 EXTRA WORK 0.00 155,506.14 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 1,500.00 2,775,426.88 83 MOBILIZATION LS 220,000.0000 220,000.00 1.000 220,000.00 ORIGINAL CONTRACT AMOUNT 2,848,668.50 TOTAL WORK COMPLETED 1,500.00 2,995,426.88 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -5,000.00 TOTAL 1,500.00 2,990,426.88 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 03/07/05 430 04/11/05 03/22/05 07/01/07 348 16 107 0 PLANT ESTABLISHMENT PERI PROGRESS IS SATISFACTORY SAYKALI, ZARIF RESIDENT ENGINEER PROGRAM CAS145 DATE 09/22/06