PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 07/22/03 EST. NO.10 TIME 01:44 PM R.E. NAME: JAHROMI, REZA 07-181604 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0025 751.49 E.W. @ F.A.(+) 052003 N 59 0 0026 751.49 052103 N 60 0 0027 430.23 052303 N 62 0 0028 203.74 060203 N 63 0 0029 203.74 060303 N 64 0 0030 203.74 060403 N 65 0 0031 247.79 060703 N 66 0 0032 203.74 052803 N 67 0 0033 203.74 052903 N 68 0 0034 203.74 053003 N 69 0 0035 247.79 053103 N 70 0 0036 247.79 062103 N 71 0 0037 247.79 061403 N 72 0 0038 198.88 061103 N 73 0 4,345.69 TOTAL THIS ESTIMATE 235,441.94 TOTAL PREVIOUS ESTIMATE 239,787.63 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 07/22/03 EST. NO.10 TIME 01:44 PM R.E. NAME: JAHROMI, REZA 07-181604 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 07/22/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-181604 TIME 01:44 PM ESTIMATE NO. 10 BID OPENING 08/01/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/03 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 07/22/03 LOCATION PROGRESS ESTIMATE 07-LA-91-R14.0/R20.7 ----------------- CHUMO CONSTRUCTION INC. IN LOS ANGELES COUNTY IN BELLFLOWER 14425 JOANBRIDGE STREET CERRITOS AND ARTESIA FROM DOWNEY BALDWIN PARK, CA 91706-1747 AVENUE UNDERCROSSING TO LOS ANGELES AND ORANGE COUNTY LINE FED. AID NO. ACNH-P091(112)E REPAIR SLABS AND PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.250 1,250.00 02 TIME-RELATED OVERHEAD WDAY 2,000.0000 1,000,000.00 20.000 40,000.00 168.000 336,000.00 03 CONSTRUCTION AREA SIGNS LS 9,500.0000 9,500.00 0.010 95.00 0.482 4,579.00 S) 04 TRAFFIC CONTROL SYSTEM LS 734,000.0000 734,000.00 0.036 26,424.00 0.318 233,412.00 S) 05 CHANNELIZER (SURFACE MOUNTED) EA 28.0000 4,200.00 40.000 1,120.00 S) 06 FLASHING BEACON (PORTABLE) EA 1,500.0000 9,000.00 0.000 0.00 S) 07 TEMPORARY TERMINAL SECTION (TYPE K) EA 1,000.0000 6,000.00 1.000 1,000.00 S) 08 TEMPORARY RAILING (TYPE K) M 39.0000 286,650.00 7,480.000 291,720.00 S) 09 REMOVE METAL BEAM GUARD RAILING M 17.5000 10,675.00 0.000 0.00 S) 10 REMOVE PAINTED TRAFFIC STRIPE M 1.1000 44,660.00 0.000 0.00 11 REMOVE PAINTED PAVEMENT MARKING M2 15.0000 435.00 0.000 0.00 12 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 1.0000 28,600.00 13,803.000 13,803.00 13 REMOVE YELLOW TRAFFIC STRIPE M 2.0000 8,480.00 0.000 0.00 14 REMOVE THERMOPLASTIC YELLOW TRAFFIC M 2.0000 25,400.00 27,973.000 55,946.00 STRIPE 15 REMOVE PAVEMENT MARKER EA 0.8000 34,720.00 21,486.010 17,188.81 16 REMOVE ROADSIDE SIGN EA 100.0000 2,800.00 11.000 1,100.00 17 REMOVE SIGN STRUCTURE EA 2,000.0000 20,000.00 3.000 6,000.00 18 REMOVE SIGN PANEL M2 65.0000 6,500.00 12.400 806.00 19 REMOVE ASPHALT CONCRETE DIKE M 2.5000 2,575.00 0.000 0.00 20 REMOVE PIPE M 21.4000 67,196.00 1,398.640 29,930.90 21 REMOVE INLET EA 500.0000 13,500.00 13.000 6,500.00 22 RELOCATE ROADSIDE SIGN EA 200.0000 3,000.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 07/22/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-181604 TIME 01:44 PM ESTIMATE NO. 10 BID OPENING 08/01/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/03 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 07/22/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 RELOCATE TEMPORARY RAILING (TYPE K) M 6.9000 95,220.00 0.000 0.00 S) 24 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.1000 20,727.00 0.000 0.00 S) (45 MM MAXIMUM) 25 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.1000 3,885.00 0.000 0.00 S) (60 MM MAXIMUM) 26 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.1000 29,190.00 0.000 0.00 S) (105 MM MAXIMUM) 27 REMOVE CONCRETE BARRIER (TYPE 50) M 20.0000 196,600.00 3,439.000 68,780.00 28 BRIDGE REMOVAL (PORTION), LOCATION A LS 2,600.0000 2,600.00 0.000 0.00 29 BRIDGE REMOVAL (PORTION), LOCATION B LS 1,950.0000 1,950.00 0.000 0.00 30 BRIDGE REMOVAL (PORTION), LOCATION C LS 1,300.0000 1,300.00 0.000 0.00 31 BRIDGE REMOVAL (PORTION), LOCATION D LS 1,950.0000 1,950.00 0.000 0.00 32 BRIDGE REMOVAL (PORTION), LOCATION E LS 1,950.0000 1,950.00 0.000 0.00 33 BRIDGE REMOVAL (PORTION), LOCATION F LS 1,950.0000 1,950.00 0.000 0.00 34 BRIDGE REMOVAL (PORTION), LOCATION G LS 2,600.0000 2,600.00 0.000 0.00 35 BRIDGE REMOVAL (PORTION), LOCATION H LS 3,900.0000 3,900.00 0.000 0.00 36 BRIDGE REMOVAL (PORTION), LOCATION I LS 6,500.0000 6,500.00 0.000 0.00 37 BRIDGE REMOVAL (PORTION), LOCATION J LS 1,950.0000 1,950.00 0.000 0.00 38 BRIDGE REMOVAL (PORTION), LOCATION K LS 1,950.0000 1,950.00 0.000 0.00 39 BRIDGE REMOVAL (PORTION), LOCATION L LS 1,950.0000 1,950.00 1.000 1,950.00 40 ROADWAY EXCAVATION M3 12.0000 570,000.00 0.000 0.00 41 LEAD COMPLIANCE PLAN LS 3,000.0000 3,000.00 1.000 3,000.00 42 AGGREGATE BASE (APPROACH SLAB) M3 450.0000 144,000.00 116.124 52,255.80 487.694 219,462.30 43 CLASS 3 AGGREGATE BASE M3 12.0000 190,800.00 0.000 0.00 44 LEAN CONCRETE BASE M3 91.5500 1,007,050.00 3,567.540 326,608.29 45 REPLACE ASPHALT CONCRETE SURFACING M3 142.0000 856,260.00 367.480 52,182.16 46 ASPHALT CONCRETE (TYPE B) TONN 48.0000 231,360.00 0.000 0.00 47 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 65.0000 17,550.00 0.000 0.00 48 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 500.0000 500.00 0.000 0.00 AREA) 49 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 12.0000 2,400.00 0.000 0.00 PROGRAM CAS145 PAGE 3 DATE 07/22/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-181604 TIME 01:44 PM ESTIMATE NO. 10 BID OPENING 08/01/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/03 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 07/22/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 50 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 12.0000 6,360.00 0.000 0.00 51 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 12.0000 4,080.00 0.000 0.00 52 CONCRETE PAVEMENT M3 128.0000 2,662,400.00 3,650.000 467,200.00 3,650.000 467,200.00 53 REPLACE CONCRETE PAVEMENT M3 518.0000 1,160,320.00 395.000 204,610.00 (RAPID STRENGTH CONCRETE) 54 SEAL PAVEMENT JOINT M 6.5000 120,900.00 0.000 0.00 55 SEAL LONGITUDINAL ISOLATION JOINT M 9.2500 188,700.00 2,000.000 18,500.00 2,000.000 18,500.00 56 GRIND EXISTING CONCRETE M2 4.1500 1,373,650.00 212,734.040 882,846.27 PAVEMENT 57 STRUCTURAL CONCRETE, APPROACH SLAB M3 466.0000 1,458,160.60 231.451 107,856.17 1,114.000 519,124.00 F) (TYPE R) 58 MINOR CONCRETE (MINOR STRUCTURE) M3 1,970.0000 164,101.00 0.000 0.00 F) 59 MINOR CONCRETE (PIPE ENCASEMENT) M3 200.0000 26,000.00 0.000 0.00 60 PAVING NOTCH EXTENSION M3 3,200.0000 233,600.00 7.032 22,502.40 29.125 93,200.00 61 JOINT SEAL (TYPE B - MR 30 MM) M 102.0000 110,160.00 0.000 0.00 62 FURNISH SIGN STRUCTURE (TRUSS) KG 4.5000 260,712.00 0.000 0.00 63 INSTALL SIGN STRUCTURE (TRUSS) KG 0.2700 15,642.72 0.000 0.00 SF) 64 760 MM CAST-IN-DRILLED-HOLE M 970.0000 21,825.00 0.000 0.00 S) CONCRETE PILE (SIGN FOUNDATION) 65 920 MM CAST-IN-DRILLED-HOLE M 1,130.0000 70,060.00 0.000 0.00 S) CONCRETE PILE (SIGN FOUNDATION) 66 METAL (BARRIER MOUNTED SIGN) KG 15.0000 77,550.00 0.000 0.00 67 ROADSIDE SIGN - ONE POST EA 250.0000 1,000.00 0.000 0.00 68 INSTALL SIGN (STRAP AND SADDLE BRACKET EA 200.0000 1,600.00 0.000 0.00 METHOD) 69 INSTALL ROADSIDE SIGN EA 2,000.0000 2,000.00 0.000 0.00 (LAMINATED WOOD BOX POST) 70 300 MM PLASTIC PIPE M 80.0000 35,200.00 0.000 0.00 71 450 MM REINFORCED CONCRETE PIPE M 230.0000 18,400.00 21.500 4,945.00 21.500 4,945.00 72 600 MM REINFORCED CONCRETE PIPE M 260.0000 546.00 0.000 0.00 73 450 MM CORRUGATED STEEL PIPE M 235.0000 3,760.00 0.000 0.00 (2.01 MM THICK) 74 450 MM SLOTTED CORRUGATED STEEL PIPE M 365.0000 15,695.00 0.000 0.00 (2.01 MM THICK) 75 450 MM CORRUGATED STEEL PIPE DOWNDRAIN M 145.0000 11,310.00 0.000 0.00 (2.01 MM THICK) 76 300 MM ENTRANCE TAPER EA 500.0000 500.00 0.000 0.00 PROGRAM CAS145 PAGE 4 DATE 07/22/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-181604 TIME 01:44 PM ESTIMATE NO. 10 BID OPENING 08/01/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/03 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 07/22/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 77 ROCK SLOPE PROTECTION M3 150.0000 495.00 0.000 0.00 (FACING, METHOD B) 78 ROCK SLOPE PROTECTION FABRIC M2 10.0000 170.00 0.000 0.00 79 MISCELLANEOUS IRON AND STEEL KG 1.0000 11,607.00 0.000 0.00 SF) 80 INSTALL MEDIAN MILEAGE PANEL EA 50.0000 5,500.00 0.000 0.00 81 METAL BEAM GUARD RAILING (WOOD POST) M 58.0000 38,860.00 0.000 0.00 S) 82 TERMINAL SYSTEM (TYPE ET) EA 4,000.0000 8,000.00 0.000 0.00 S) 83 TERMINAL SYSTEM (TYPE SRT) EA 1,880.0000 69,560.00 0.000 0.00 S) 84 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 520.0000 13,520.00 0.000 0.00 S) 85 CRASH CUSHION, SAND FILLED EA 4,000.0000 12,000.00 0.000 0.00 S) 86 CONCRETE BARRIER (TYPE 60) M 80.5000 304,290.00 0.000 0.00 87 CONCRETE BARRIER (TYPE 60A MOD) M 109.0000 56,549.20 0.000 0.00 F) 88 CONCRETE BARRIER (TYPE 60C) M 91.0000 214,760.00 0.000 0.00 89 CONCRETE BARRIER (TYPE 60E) M 330.0000 59,400.00 0.000 0.00 90 CONCRETE BARRIER (TYPE 60EC) M 350.0000 35,000.00 0.000 0.00 91 CONCRETE BARRIER (TYPE 60S) M 90.0000 9,000.00 0.000 0.00 92 CONCRETE BARRIER (TYPE 60SW) M 275.0000 783,750.00 0.000 0.00 93 CONCRETE BARRIER (TYPE 60SA MOD) M 102.0000 38,607.00 0.000 0.00 F) 94 CONCRETE BARRIER (TYPE 60SC) M 93.0000 4,743.00 0.000 0.00 95 CONCRETE BARRIER (TYPE 60SE) M 325.0000 39,000.00 0.000 0.00 96 CONCRETE BARRIER (TYPE 60SEC) M 330.0000 26,400.00 0.000 0.00 97 THERMOPLASTIC PAVEMENT MARKING M2 26.0000 16,380.00 0.000 0.00 S) 98 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8500 95,200.00 0.000 0.00 S) 99 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.7000 9,979.00 0.000 0.00 S) 00 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.1000 6,347.00 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 01 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.5500 36,795.00 16,276.000 8,951.80 S) (BROKEN 10.98 M - 3.66 M) 02 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.1000 2,288.00 0.000 0.00 S) (BROKEN 11.00 M - 3.50 M) 03 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.5500 1,105.50 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) PROGRAM CAS145 PAGE 5 DATE 07/22/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-181604 TIME 01:44 PM ESTIMATE NO. 10 BID OPENING 08/01/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/03 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 07/22/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 04 PAINT TRAFFIC STRIPE (2-COAT) M 0.5000 38,850.00 75,101.880 37,550.94 S) 05 PAINT PAVEMENT MARKING (2-COAT) M2 20.0000 580.00 31.200 624.00 S) 06 PAVEMENT MARKER (NON-REFLECTIVE) EA 0.9000 16,470.00 6,668.000 6,001.20 S) 07 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.5000 83,000.00 8,045.000 20,112.50 S) 08 INDUCTIVE LOOP DETECTOR LS 170,000.0000 170,000.00 0.060 10,200.00 S) 09 MODIFY LIGHTING AND SIGN ILLUMINATION LS 130,000.0000 130,000.00 0.620 80,600.00 S) PROGRAM CAS145 PAGE 6 DATE 07/22/03 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-181604 TIME 01:44 PM ESTIMATE NO. 10 BID OPENING 08/01/02 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 07/20/03 R.E. NAME: JAHROMI, REZA DATE OF THIS ESTIMATE 07/22/03 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 739,778.37 4,026,804.17 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 4,345.69 239,787.63 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 744,124.06 4,266,591.80 10 MOBILIZATION LS 1780,000.0000 1,780,000.00 0.950 1,691,000.00 ORIGINAL CONTRACT AMOUNT 17,884,421.02 TOTAL WORK COMPLETED 744,124.06 5,957,591.80 MATERIALS ON HAND ON SITE 43,960.76 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 744,124.06 6,001,552.56 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 09/12/02 500 09/26/02 00/00/00 11/16/04 172 30 0 0 33% 34% PROGRESS IS SATISFACTORY JAHROMI, REZA RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 07/22/03