PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 04/25/06 EST. NO.03 TIME 03:49 PM R.E. NAME: RESLER, CAESAR 07-193104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 04/25/06 EST. NO.03 TIME 03:49 PM R.E. NAME: RESLER, CAESAR 07-193104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE $4.63M3 DED 28.33 M3 -130.32 03 -130.32 -130.32 LABOR COMPLIANCE VIOLATION MARCH 06 -10,000.00 03 -10,000.00 -10,000.00 TOTAL DEDUCTIONS -10,130.32 -10,130.32 PROGRAM CAS145 PAGE 1 DATE 04/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-193104 TIME 03:49 PM ESTIMATE NO. 03 BID OPENING 09/29/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: RESLER, CAESAR DATE OF THIS ESTIMATE 04/25/06 LOCATION PROGRESS ESTIMATE 07-LA-5-16.9/28.7 ----------------- F C I CONSTRUCTORS INC IN LOS ANGELES COUNTY IN LOS 2585 BUSINESS PARK DRIVE ANGELES, GLENDALE AND BURBANK AT VISTA, CA 92081-8831 VARIOUS LOCATIONS FED. AID NO. ACIM-005 -3(64)E REHABILITATE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 3,800.0000 3,800.00 0.750 2,850.00 02 TIME-RELATED OVERHEAD WDAY 1,000.0000 925,000.00 25.000 25,000.00 60.000 60,000.00 03 PREPARE WATER POLLUTION CONTROL LS 3,800.0000 3,800.00 0.500 1,900.00 PROGRAM 04 WATER POLLUTION CONTROL LS 500,000.0000 500,000.00 0.060 30,000.00 0.060 30,000.00 05 CONSTRUCTION AREA SIGNS LS 35,000.0000 35,000.00 0.750 26,250.00 S) 06 TRAFFIC CONTROL SYSTEM LS 1090,000.0000 1,090,000.00 0.020 21,800.00 0.060 65,400.00 S) 07 REMOVE METAL BEAM GUARD RAILING M 35.0000 14,000.00 0.000 0.00 S) 08 REMOVE ASPHALT CONCRETE DIKE M 12.0000 15,000.00 0.000 0.00 09 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 9.0000 44,190.00 0.000 0.00 S) 10 LEAD COMPLIANCE PLAN LS 2,000.0000 2,000.00 1.000 2,000.00 11 AGGREGATE BASE (APPROACH SLAB) M3 400.0000 264,800.00 0.000 0.00 12 ASPHALT CONCRETE (TYPE B) TONN 220.0000 138,600.00 0.000 0.00 13 PLACE ASPHALT CONCRETE (MISCELLANEOUS M2 200.0000 10,600.00 0.000 0.00 AREA) 14 PLACE ASPHALT CONCRETE DIKE (TYPE C) M 6.5000 1,625.00 0.000 0.00 15 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 6.5000 9,815.00 0.000 0.00 16 REPLACE CONCRETE PAVEMENT M3 808.0000 23,916,800.00 15.110 12,208.88 15.110 12,208.88 (RAPID STRENGTH CONCRETE) 17 SEAL PAVEMENT JOINT M 18.0000 730,800.00 0.000 0.00 18 SEAL LONGITUDINAL ISOLATION JOINT M 20.0000 157,200.00 0.000 0.00 19 TIE BAR (DRILL AND BOND) EA 30.0000 609,000.00 265.000 7,950.00 265.000 7,950.00 20 SEAL JOINT (EXISTING CONCRETE PAVEMENT) M 8.7500 240,625.00 0.000 0.00 21 GRIND EXISTING CONCRETE M2 7.0000 1,302,000.00 0.000 0.00 S) PAVEMENT 22 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,496.0000 6,580,904.00 0.000 0.00 (TYPE R) PROGRAM CAS145 PAGE 2 DATE 04/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-193104 TIME 03:49 PM ESTIMATE NO. 03 BID OPENING 09/29/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: RESLER, CAESAR DATE OF THIS ESTIMATE 04/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 PAVING NOTCH EXTENSION M3 13,000.0000 598,000.00 0.000 0.00 24 DOWEL (SMOOTH, EPOXY COATED) EA 19.0000 1,702,400.00 538.000 10,222.00 538.000 10,222.00 25 JOINT SEAL (MR 30 MM) M 150.0000 71,850.00 0.000 0.00 S) 26 JOINT SEAL (MR 15 MM) M 140.0000 172,760.00 0.000 0.00 S) 27 JOINT SEAL (MR 40 MM) M 600.0000 7,800.00 0.000 0.00 S) 28 METAL BEAM GUARD RAILING M 92.0000 264,040.00 0.000 0.00 S) 29 TRANSITION RAILING (TYPE WB) EA 3,700.0000 70,300.00 0.000 0.00 S) 30 END CAP (TYPE C) EA 200.0000 2,400.00 0.000 0.00 S) 31 TERMINAL ANCHOR ASSEMBLY (TYPE SFT) EA 800.0000 4,800.00 0.000 0.00 S) 32 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 4,400.0000 13,200.00 0.000 0.00 S) 33 ALTERNATIVE FLARED TERMINAL SYSTEM EA 3,600.0000 25,200.00 0.000 0.00 S) 34 100 MM THERMOPLASTIC TRAFFIC STRIPE M 1.2000 37,200.00 0.000 0.00 S) 35 200 MM THERMOPLASTIC TRAFFIC STRIPE M 3.7500 1,950.00 0.000 0.00 S) 36 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 7,980.00 0.000 0.00 S) (BROKEN 3.66 M - 0.92 M) 37 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8500 42,330.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 38 PAVEMENT MARKER (NON-REFLECTIVE) EA 2.0000 26,800.00 156.000 312.00 156.000 312.00 S) 39 PAVEMENT MARKER (RETROREFLECTIVE) EA 4.0000 20,280.00 0.000 0.00 S) 40 MODIFY TRAFFIC MONITORING STATION LS 80,000.0000 80,000.00 0.000 0.00 S) (COUNT) 41 COMMUNICATION SYSTEM ROUTING LS 64,000.0000 64,000.00 0.000 0.00 S) (MODIFY) 42 MODIFY RAMP METERING SYSTEM LS 70,000.0000 70,000.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 04/25/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-193104 TIME 03:49 PM ESTIMATE NO. 03 BID OPENING 09/29/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 04/20/06 R.E. NAME: RESLER, CAESAR DATE OF THIS ESTIMATE 04/25/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 107,492.88 219,092.88 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 107,492.88 219,092.88 43 MOBILIZATION LS 4430,000.0000 4,430,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 44,308,849.00 TOTAL WORK COMPLETED 107,492.88 219,092.88 MATERIALS ON HAND ON SITE 162,796.90 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -10,130.32 -10,130.32 TOTAL 97,362.56 371,759.46 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/05/05 925 12/16/05 12/16/05 10/31/10 61 31 0 0 0% 7% PROGRESS IS SATISFACTORY RESLER, CAESAR RESIDENT ENGINEER PROGRAM CAS145 PAGE 3 DATE 04/25/06