PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 03/24/14 EST. NO.07 TIME 09:10 AM R.E. NAME: GALLARDO, SAM 07-1W3104 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 001 0001 374.83 E.W. @ F.A.(+) 112313 N 01 0 0002 1,849.88 021214 N 02 0 0003 1,400.59 021314 N 03 0 0004 1,549.45 031114 N 04 0 0005 1,800.74 031214 N 05 0 6,975.49 TOTAL THIS ESTIMATE 0.00 TOTAL PREVIOUS ESTIMATE 6,975.49 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 03/24/14 EST. NO.07 TIME 09:10 AM R.E. NAME: GALLARDO, SAM 07-1W3104 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 03/24/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1W3104 TIME 09:10 AM ESTIMATE NO. 07 BID OPENING 05/16/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 03/24/14 LOCATION PROGRESS ESTIMATE 07-LA-405-0.8/6.9 ----------------- O'DONNELL CONSTRUCTION INC IN LOS ANGELES COUNTY IN LONG BEACH 559 W COVINA BLVD ON RTE 405 FR LOS CERRITOS CHANNEL SAN DIMAS CA 91773 UC TO RTE 405/710 SEP & ON RTE 710 FROM PICO AVE ON-RAMP OVERHEAD TO ALONDRA BLVD OC FED. AID NO. N O N E JOINT REPL,SPALL REPAIR & METH DECK ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 001 LEAD COMPLIANCE PLAN LS 800.0000 800.00 0.500 400 002 CONSTRUCTION AREA SIGNS LS 11,000.0000 11,000.00 0.800 8,800 003 TRAFFIC CONTROL SYSTEM LS 90,000.0000 90,000.00 0.050 4,500.00 0.950 85,500 004 JOB SITE MANAGEMENT LS 2,500.0000 2,500.00 0.050 125.00 0.950 2,375 005 PREPARE WATER POLLUTION CONTROL PROGRAM LS 6,000.0000 6,000.00 0.750 4,500 006 TEMPORARY DRAINAGE INLET PROTECTION EA 100.0000 100.00 0.000 0 007 TEMPORARY GRAVEL BAG BERM LF 4.0000 800.00 0.000 0 008 TEMPORARY CONCRETE WASHOUT LS 2,000.0000 2,000.00 0.100 200.00 1.000 2,000 009 REMOVE YELLOW THERMOPLASTIC TRAFFIC LF 1.1000 6,578.00 6,086.000 6,694 STRIPE (HAZARDOUS WASTE) 010 PUBLIC SAFETY PLAN LS 3,500.0000 3,500.00 1.000 3,500 011 INJECT CRACK (EPOXY) LF 350.0000 1,750.00 0.000 0 012 RAPID SETTING CONCRETE (PATCH) CF 380.0000 380.00 1.000 380 013 REPAIR SPALLED SURFACE AREA SQFT 110.0000 43,340.00 435.570 47,912.70 462.570 50,882 014 REMOVE THERMOPLASTIC TRAFFIC STRIPE LF 0.7500 11,925.00 9,598.000 7,198 015 REMOVE THERMOPLASTIC PAVEMENT MARKING SQFT 3.5000 840.00 252.000 882 016 REMOVE PAVEMENT MARKER EA 1.1000 1,375.00 1,239.000 1,362 017 REMOVE UNSOUND CONCRETE CF 185.0000 1,480.00 0.610 112.85 6.610 1,222 018 PREPARE CONCRETE BRIDGE DECK SURFACE SQFT 0.1300 34,723.00 267,100.000 34,723 019 TREAT BRIDGE DECK SQFT 0.2300 61,433.00 267,100.000 61,433 (F) 020 FURNISH BRIDGE DECK TREATMENT MATERIAL GAL 52.0000 175,760.00 3,607.600 187,595 021 STRUCTURE EXCAVATION (BRIDGE) CY 80.0000 3,280.00 41.000 3,280.00 41.000 3,280 (F) 022 STRUCTURE BACKFILL (BRIDGE) CY 100.0000 4,100.00 0.000 0 (F) PROGRAM CAS145 PAGE 2 DATE 03/24/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1W3104 TIME 09:10 AM ESTIMATE NO. 07 BID OPENING 05/16/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 03/24/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ 023 STRUCTURAL CONCRETE, APPROACH SLAB CY 1,100.0000 331,100.00 23.000 25,300.00 349.510 384,461 (TYPE R) 024 PAVING NOTCH EXTENSION CF 450.0000 3,150.00 7.000 3,150 025 CLEAN EXPANSION JOINT LF 13.0000 50,856.00 46.000 598.00 3,872.000 50,336 026 JOINT SEAL (MR 1") LF 22.0000 52,800.00 46.000 1,012.00 2,360.000 51,920 027 JOINT SEAL (MR 1 1/2") LF 48.0000 46,128.00 961.000 46,128 028 JOINT SEAL (TYPE AL) LF 22.0000 12,122.00 551.000 12,122 029 ASPHALT MEMBRANE WATERPROOFING SQFT 6.0000 9,000.00 0.000 0 (F) 030 COLUMN CASING LB 7.4000 59,200.00 0.000 0 (F) 031 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 13,860.00 25,257.000 13,891.35 25,257.000 13,891 032 8" THERMOPLASTIC TRAFFIC STRIPE LF 2.5000 600.00 452.000 1,130.00 452.000 1,130 (BROKEN 12-3) 033 THERMOPLASTIC PAVEMENT MARKING SQFT 11.0000 2,640.00 185.000 2,035.00 185.000 2,035 034 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.6000 4,074.00 7,112.000 4,267.20 7,112.000 4,267 (BROKEN 36-12) 035 4" THERMOPLASTIC TRAFFIC STRIPE LF 0.5500 2,035.00 11,141.000 6,127.55 11,141.000 6,127 (BROKEN 17-7) 036 PAVEMENT MARKER (NON-REFLECTIVE) EA 3.5000 2,030.00 136.000 476.00 627.000 2,194 037 PAVEMENT MARKER (RETROREFLECTIVE) EA 7.5000 5,250.00 217.000 1,627.50 584.000 4,380 PROGRAM CAS145 PAGE 3 DATE 03/24/14 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1W3104 TIME 09:10 AM ESTIMATE NO. 07 BID OPENING 05/16/13 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 03/20/14 R.E. NAME: GALLARDO, SAM DATE OF THIS ESTIMATE 03/24/14 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOU ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 112,595.15 1,044,872.35 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 6,975.49 6,975.49 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 119,570.64 1,051,847.84 038 MOBILIZATION LS 90,000.0000 90,000.00 1.000 90,000 ORIGINAL CONTRACT AMOUNT 1,148,509.00 TOTAL WORK COMPLETED 119,570.64 1,141,847.84 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 119,570.64 1,141,847.84 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 07/08/13 160 10/07/13 07/23/13 04/30/14 144 19 0 0 92% 90% PROGRESS IS SATISFACTORY *** SUSPENDED ON 03/10/14. GALLARDO, SAM RESIDENT ENGINEER PROGRAM CAS145 DATE 03/24/14