PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 06/21/07 EST. NO.01 TIME 07:58 AM R.E. NAME: MCKENZIE, DARRELL 07-1Y4504 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 06/21/07 EST. NO.01 TIME 07:58 AM R.E. NAME: MCKENZIE, DARRELL 07-1Y4504 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 06/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1Y4504 TIME 07:58 AM ESTIMATE NO. 01 BID OPENING 03/22/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: MCKENZIE, DARRELL DATE OF THIS ESTIMATE 06/21/07 LOCATION RERUN PROGRESS ESTIMATE 07-LA-210-22.4/24.6 ----------------------- ORTIZ PAVING INC. IN LOS ANGELES COUNTY IN PASADENA P.O.BOX883 FROM ARROYO BOULEVARD OVERCROSSING COLTON,CA 92324 TO ORANGE GROVE BOULEVARD OVERCROSSING FED. AID NO. N O N E COLD PLANE ASPHALT CONCRETE ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 958.5400 958.54 0.500 479.27 0.500 479.27 PROGRAM 02 WATER POLLUTION CONTROL LS 3,871.7700 3,871.77 0.000 0.00 03 CONSTRUCTION AREA SIGNS LS 6,095.1300 6,095.13 0.800 4,876.10 0.800 4,876.10 S) 04 TRAFFIC CONTROL SYSTEM LS 19,192.7200 19,192.72 0.000 0.00 S) 05 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.4100 137,611.00 0.000 0.00 S) 06 ASPHALT CONCRETE (TYPE B) TONN 99.7200 163,540.80 0.000 0.00 07 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 113.2500 265,005.00 0.000 0.00 08 THERMOPLASTIC PAVEMENT MARKING M2 38.4200 9,220.80 0.000 0.00 S) 09 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.8800 13,904.00 0.000 0.00 S) 10 200 MM THERMOPLASTIC TRAFFIC STRIPE M 1.6500 5,461.50 0.000 0.00 S) 11 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.7100 1,249.60 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 12 PAVEMENT MARKER (RETROREFLECTIVE) EA 3.2900 3,059.70 0.000 0.00 S) 13 INDUCTIVE LOOP DETECTOR EA 439.0800 27,662.04 0.000 0.00 S) PROGRAM CAS145 PAGE 2 DATE 06/21/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1Y4504 TIME 07:58 AM ESTIMATE NO. 01 BID OPENING 03/22/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 06/20/07 R.E. NAME: MCKENZIE, DARRELL DATE OF THIS ESTIMATE 06/21/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 5,355.37 5,355.37 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 5,355.37 5,355.37 14 MOBILIZATION LS 62,972.6100 62,972.61 0.000 0.00 ORIGINAL CONTRACT AMOUNT 719,805.21 TOTAL WORK COMPLETED 5,355.37 5,355.37 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 5,355.37 5,355.37 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 04/23/07 80 00/00/00 00/00/00 09/30/07 0 0 0 0 1% 0% PROGRESS IS SATISFACTORY MCKENZIE, DARRELL RESIDENT ENGINEER PROGRAM CAS145 DATE 06/21/07