PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 08/24/05 EST. NO.01 TIME 01:15 PM R.E. NAME: AKBARIAN, MASSOD 07-1Y7204 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 08/24/05 EST. NO.01 TIME 01:15 PM R.E. NAME: AKBARIAN, MASSOD 07-1Y7204 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- *** THERE ARE NO DEDUCTIONS FOR THIS CONTRACT *** PROGRAM CAS145 PAGE 1 DATE 08/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1Y7204 TIME 01:15 PM ESTIMATE NO. 01 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/05 R.E. NAME: AKBARIAN, MASSOD DATE OF THIS ESTIMATE 08/24/05 LOCATION PROGRESS ESTIMATE 07-LA-405-13.0/13.0 ----------------- ODONNELL CONSTRUCTION INC IN LOS ANGELES COUNTY IN 559 W COVINA BLVD LOS ANGELES AT ROUTE 405 AND 110 SAN DIMAS CA 917732911 SEPARATION FED. AID NO. N O N E REPAIR COLUMN SPALLS ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 TEMPORARY SUPPORT LS 250,000.0000 250,000.00 0.000 0.00 02 PREPARE WATER POLLUTION CONTROL LS 1,000.0000 1,000.00 0.500 500.00 0.500 500.00 PROGRAM 03 WATER POLLUTION CONTROL LS 8,000.0000 8,000.00 0.000 0.00 04 CONSTRUCTION AREA SIGNS LS 4,000.0000 4,000.00 0.500 2,000.00 0.500 2,000.00 S) 05 TRAFFIC CONTROL SYSTEM LS 80,000.0000 80,000.00 0.000 0.00 S) 06 CHANNELIZER (SURFACE MOUNTED) EA 35.0000 210.00 0.000 0.00 S) 07 TEMPORARY RAILING (TYPE K) M 85.0000 17,000.00 0.000 0.00 S) 08 TEMPORARY CRASH CUSHION MODULE EA 325.0000 4,550.00 0.000 0.00 S) 09 REMOVE YELLOW THERMOPLASTIC TRAFFIC M 24.0000 9,120.00 0.000 0.00 S) STRIPE 10 REMOVE THERMOPLASTIC TRAFFIC STRIPE M 5.2000 3,796.00 0.000 0.00 S) 11 REMOVE PAVEMENT MARKER EA 5.2000 1,976.00 0.000 0.00 S) 12 RECONSTRUCT METAL BEAM GUARD RAILING M 100.0000 8,800.00 0.000 0.00 S) (WOOD POST) 13 CLEAN BRIDGE DECK M2 4.0000 18,820.00 0.000 0.00 14 BRIDGE REMOVAL (PORTION), LOCATION A LS 10,000.0000 10,000.00 0.000 0.00 15 BRIDGE REMOVAL (PORTION), LOCATION B LS 28,000.0000 28,000.00 0.000 0.00 16 BRIDGE REMOVAL (PORTION), LOCATION C LS 10,000.0000 10,000.00 0.000 0.00 17 BRIDGE REMOVAL (PORTION), LOCATION D LS 10,000.0000 10,000.00 0.000 0.00 18 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.500 2,000.00 0.500 2,000.00 19 STRUCTURE EXCAVATION (BRIDGE) M3 70.0000 9,170.00 0.000 0.00 F) 20 STRUCTURE BACKFILL (BRIDGE) M3 110.0000 14,410.00 0.000 0.00 F) 21 ASPHALT CONCRETE (TYPE B) TONN 90.0000 18,900.00 0.000 0.00 22 PLACE ASPHALT CONCRETE DIKE (TYPE F) M 50.0000 4,400.00 0.000 0.00 PROGRAM CAS145 PAGE 2 DATE 08/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1Y7204 TIME 01:15 PM ESTIMATE NO. 01 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/05 R.E. NAME: AKBARIAN, MASSOD DATE OF THIS ESTIMATE 08/24/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 STRUCTURAL CONCRETE, BRIDGE M3 4,000.0000 21,200.00 0.000 0.00 F) 24 BAR REINFORCING STEEL (BRIDGE) KG 250.0000 54,000.00 0.000 0.00 SF) 25 GALVANIC ANODE EA 580.0000 6,960.00 0.000 0.00 S) 26 GALVANIC ANODE MONITORING KIT EA 3,400.0000 6,800.00 0.000 0.00 S) 27 TREAT BRIDGE DECK M2 5.0000 23,525.00 0.000 0.00 F) 28 FURNISH BRIDGE DECK TREATMENT MATERIAL L 15.0000 28,200.00 0.000 0.00 (LOW ODOR) 29 100 MM THERMOPLASTIC TRAFFIC STRIPE M 13.5000 13,500.00 0.000 0.00 S) 30 100 MM THERMOPLASTIC TRAFFIC STRIPE M 13.5000 1,755.00 0.000 0.00 S) (BROKEN 10.98 M - 3.66 M) 31 PAVEMENT MARKER (NON-REFLECTIVE) EA 31.0000 4,650.00 0.000 0.00 S) 32 PAVEMENT MARKER (RETROREFLECTIVE) EA 31.0000 7,130.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 08/24/05 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-1Y7204 TIME 01:15 PM ESTIMATE NO. 01 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 08/20/05 R.E. NAME: AKBARIAN, MASSOD DATE OF THIS ESTIMATE 08/24/05 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 4,500.00 4,500.00 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 4,500.00 4,500.00 33 MOBILIZATION LS 70,000.0000 70,000.00 0.000 0.00 ORIGINAL CONTRACT AMOUNT 753,872.00 TOTAL WORK COMPLETED 4,500.00 4,500.00 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 0.00 TOTAL 4,500.00 4,500.00 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE PROGRAM N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/28/05 75 06/29/05 07/14/05 11/03/05 27 0 0 0 1% 36% PROGRESS IS SATISFACTORY UNSATIS PROGRESS OVERRIDEN BECAU CCO DAYS PENDING AKBARIAN, MASSOD RESIDENT ENGINEER PROGRAM CAS145 PAGE 5 DATE 08/24/05