PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/22/08 EST. NO.02 TIME 01:09 PM R.E. NAME: AZIMA, HASSAN 07-200804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/22/08 EST. NO.02 TIME 01:09 PM R.E. NAME: AZIMA, HASSAN 07-200804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- OVERBID ITEMS OVERBID ITEM NO. 011 -1,125.00 02 -1,125.00 -1,125.00 TOTAL DEDUCTIONS -1,125.00 -1,125.00 PROGRAM CAS145 PAGE 1 DATE 02/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-200804 TIME 01:09 PM ESTIMATE NO. 02 BID OPENING 09/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/08 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 02/22/08 LOCATION PROGRESS ESTIMATE 07-LA-170-14.9/20.6 ----------------- J. FLECTHER CREAMER & SON, INC IN LOS ANGELES COUNTY IN LOS 12874 SAN FERNANDO ROAD ANGELES AND BURBANK FROM RIVERSIDE SYLMAR, CA 91342 TUJUNGA UNDERCROSSING TO ARLETA SHELDON UNDERCROSSING FED. AID NO. ACST-P170(3)E ,P-P170(3)E INSTALL GUARD RAIL ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PREPARE WATER POLLUTION CONTROL LS 3,000.0000 3,000.00 0.750 2,250.00 PROGRAM 02 WATER POLLUTION CONTROL LS 30,000.0000 30,000.00 0.250 7,500.00 0.250 7,500.00 03 CONSTRUCTION AREA SIGNS LS 10,000.0000 10,000.00 0.150 1,500.00 0.250 2,500.00 S) 04 TRAFFIC CONTROL SYSTEM LS 132,344.0000 132,344.00 0.390 51,614.16 0.390 51,614.16 S) 05 REMOVE METAL BEAM GUARD RAILING M 16.0000 34,080.00 386.700 6,187.20 386.700 6,187.20 06 REMOVE ASPHALT CONCRETE DIKE M 15.0000 60,750.00 631.500 9,472.50 631.500 9,472.50 07 REMOVE GROUND MOUNTED DELINEATOR EA 4.0000 1,200.00 26.000 104.00 26.000 104.00 08 RECONSTRUCT METAL BEAM GUARD RAILING M 34.0000 16,660.00 0.000 0.00 09 REMOVE METAL RAILING M 34.0000 2,856.00 0.000 0.00 10 REMOVE CRASH CUSHION (SAND FILLED) EA 2,800.0000 2,800.00 0.000 0.00 11 LEAD COMPLIANCE PLAN LS 4,000.0000 4,000.00 0.750 3,000.00 0.750 3,000.00 12 IMPORTED BORROW M3 110.0000 13,200.00 0.000 0.00 13 ASPHALT CONCRETE (TYPE B) TONN 140.0000 47,600.00 0.000 0.00 14 PLACE ASPHALT CONCRETE DIKE (TYPE A) M 16.0000 64,800.00 0.000 0.00 15 MINOR CONCRETE (MINOR STRUCTURE) M3 5,000.0000 80,000.00 4.000 20,000.00 4.000 20,000.00 F) 16 GUARD RAILING DELINEATOR EA 20.0000 8,000.00 0.000 0.00 17 METAL BEAM GUARD RAILING M 320.0000 272,000.00 0.000 0.00 (STEEL POST MODIFIED) 18 METAL BEAM GUARD RAILING M 82.0000 660,100.00 219.200 17,974.40 219.200 17,974.40 (WOOD POST MODIFIED) 19 METAL BEAM GUARD RAILING M 106.0000 342,380.00 410.000 43,460.00 410.000 43,460.00 (2.1 WOOD POST MODIFIED) 20 TRANSITION RAILING (TYPE WB) EA 3,000.0000 87,000.00 1.000 3,000.00 1.000 3,000.00 21 END CAP (TYPE A) EA 500.0000 11,500.00 0.000 0.00 22 END ANCHOR ASSEMBLY (TYPE SFT) EA 600.0000 21,600.00 5.000 3,000.00 5.000 3,000.00 PROGRAM CAS145 PAGE 2 DATE 02/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-200804 TIME 01:09 PM ESTIMATE NO. 02 BID OPENING 09/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/08 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 02/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 END ANCHOR ASSEMBLY (TYPE CA) EA 1,000.0000 1,000.00 0.000 0.00 24 ALTERNATIVE IN-LINE TERMINAL SYSTEM EA 2,600.0000 59,800.00 2.000 5,200.00 2.000 5,200.00 25 ALTERNATIVE FLARED TERMINAL SYSTEM EA 2,400.0000 50,400.00 2.000 4,800.00 2.000 4,800.00 26 CRASH CUSHION (REACT 9SCBS) EA 60,000.0000 60,000.00 0.000 0.00 27 SIZE 53 CONDUIT M 85.0000 136,000.00 0.000 0.00 S) 28 RELOCATE LIGHTING STANDARD EA 4,500.0000 18,000.00 0.000 0.00 S) 29 CONDUCTOR (NO. 6) M 6.0000 29,400.00 0.000 0.00 S) 30 REMOVE CONDUCTOR M 1.0000 5,200.00 0.000 0.00 S) 31 CONDUCTOR (NO. 8), 5KV M 5.0000 1,850.00 0.000 0.00 S) 32 CONDUCTOR (NO. 8), BARE M 4.0000 6,400.00 0.000 0.00 S) 33 CONDUCTOR (NO. 6), BARE M 4.0000 880.00 0.000 0.00 S) 34 NO. 5 PULL BOX EA 600.0000 2,400.00 0.000 0.00 S) 35 REMOVE PULL BOX EA 200.0000 800.00 0.000 0.00 S) PROGRAM CAS145 PAGE 3 DATE 02/22/08 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-200804 TIME 01:09 PM ESTIMATE NO. 02 BID OPENING 09/27/07 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 02/20/08 R.E. NAME: AZIMA, HASSAN DATE OF THIS ESTIMATE 02/22/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 176,812.26 180,062.26 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 0.00 0.00 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 176,812.26 180,062.26 36 MOBILIZATION LS 60,000.0000 60,000.00 0.500 30,000.00 0.500 30,000.00 ORIGINAL CONTRACT AMOUNT 2,338,000.00 TOTAL WORK COMPLETED 206,812.26 210,062.26 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS -1,125.00 -1,125.00 TOTAL 205,687.26 208,937.26 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE MAXIMUM CONTRACT OVERBID VALUE PRICE AMOUNT 011 LEAD COMPLIANCE PLAN 2,500.00 4,000.00 1,500.00 DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 11/06/07 140 00/00/00 11/21/07 06/30/08 54 7 0 0 9% 39% PROGRESS IS SATISFACTORY AZIMA, HASSAN RESIDENT ENGINEER PROGRAM CAS145 PAGE 2 DATE 02/22/08