PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 11/22/06 EST. NO.14 TIME 03:15 PM R.E. NAME: PUNJABI, RAJ 07-206804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- 011 0001 10,750.00 E.W. @ U.P (+) 111706 N 100 0 10,750.00 TOTAL THIS ESTIMATE 15,466.35 TOTAL PREVIOUS ESTIMATE 26,216.35 TOTAL TO DATE PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 11/22/06 EST. NO.14 TIME 03:15 PM R.E. NAME: PUNJABI, RAJ 07-206804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE LATE LN PICKUP -84,000.00 08 0.00 -84,000.00 LABOR COMPLIANCE VIOLATION JAN 06 -10,000.00 05 MARCH 06 -10,000.00 06 MARCH 06 -10,000.00 07 MARCH 06 EST 6/7 20,000.00 08 JAN 06 10,000.00 09 0.00 0.00 TOTAL DEDUCTIONS 0.00 -84,000.00 PROGRAM CAS145 PAGE 1 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-206804 TIME 03:15 PM ESTIMATE NO. 14 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: PUNJABI, RAJ DATE OF THIS ESTIMATE 11/22/06 LOCATION PROGRESS ESTIMATE 07-LA-60-R6.9/19.4 ----------------- AMERICAN CIVIL CONSTRUCTORS IN LOS ANGELES COUNTY IN VARIOUS WEST COAST, INC. LOCATIONS 3701 MALLARD DRIVE BENICIA, CA 94510 FED. AID NO. ACNH-P060(125)E GRIND CONCRETE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 0.050 250.00 0.870 4,350.00 02 TIME-RELATED OVERHEAD WDAY 1,000.0000 500,000.00 28.000 28,000.00 437.000 437,000.00 03 PREPARE WATER POLLUTION CONTROL LS 2,500.0000 2,500.00 -0.250 -625.00 0.750 1,875.00 PROGRAM 04 WATER POLLUTION CONTROL LS 75,000.0000 75,000.00 0.040 3,000.00 0.890 66,750.00 05 CONSTRUCTION AREA SIGNS LS 17,000.0000 17,000.00 0.750 12,750.00 S) 06 TRAFFIC CONTROL SYSTEM LS 550,000.0000 550,000.00 0.900 495,000.00 S) 07 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.2000 63,580.00 25,765.030 56,683.07 S) 08 AGGREGATE BASE (APPROACH SLAB) M3 350.0000 17,500.00 62.500 21,875.00 09 SAND COVER TONN 300.0000 93,000.00 103.221 30,966.30 158.471 47,541.30 10 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 750.0000 60,000.00 8.312 6,234.00 14.422 10,816.50 11 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 87.0000 199,230.00 1,822.270 158,537.49 12 REPLACE CONCRETE PAVEMENT M3 1,000.0000 2,690,000.00 3,387.710 3,387,710.00 (RAPID STRENGTH CONCRETE) 13 SEAL JOINT (EXISTING CONCRETE PAVEMENT) M 3.0000 411,600.00 0.000 0.00 14 GRIND EXISTING CONCRETE M2 5.7500 3,576,500.00 621,486.210 3,573,545.71 S) PAVEMENT 15 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,600.0000 656,000.00 36.500 58,400.00 441.000 705,600.00 (TYPE R) 16 PAVING NOTCH EXTENSION M3 8,900.0000 97,900.00 10.600 94,340.00 17 JOINT SEAL (MR 30 MM) M 160.0000 99,200.00 0.000 0.00 18 JOINT SEAL (MR 15 MM) M 150.0000 49,500.00 180.000 27,000.00 180.000 27,000.00 19 THERMOPLASTIC PAVEMENT MARKING M2 100.0000 400.00 0.000 0.00 S) 20 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6000 50,580.00 0.000 0.00 S) 21 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 15,380.00 97.790 195.58 S) 22 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 7,760.00 3,466.790 6,933.58 S) (BROKEN 3.66 M - 0.92 M) PROGRAM CAS145 PAGE 2 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-206804 TIME 03:15 PM ESTIMATE NO. 14 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: PUNJABI, RAJ DATE OF THIS ESTIMATE 11/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.5000 73,000.00 142,564.340 71,282.17 S) (BROKEN 10.98 M - 3.66 M) 24 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6500 1,371.50 0.000 0.00 S) (BROKEN 5.18 M - 2.14 M) 25 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 39,800.00 37,343.000 37,343.00 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.4500 35,525.00 13,143.000 32,200.35 S) PROGRAM CAS145 PAGE 3 DATE 11/22/06 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-206804 TIME 03:15 PM ESTIMATE NO. 14 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 11/20/06 R.E. NAME: PUNJABI, RAJ DATE OF THIS ESTIMATE 11/22/06 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 153,225.30 9,249,328.75 ADJUSTMENT OF COMPENSATION 0.00 0.00 EXTRA WORK 10,750.00 26,216.35 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 163,975.30 9,275,545.10 27 MOBILIZATION LS 750,000.0000 750,000.00 1.000 750,000.00 ORIGINAL CONTRACT AMOUNT 10,137,326.50 TOTAL WORK COMPLETED 163,975.30 10,025,545.10 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -84,000.00 TOTAL 163,975.30 9,941,545.10 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN EST. DATE WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR COMPLETION DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/17/05 500 07/05/05 00/00/00 01/14/07 445 59 0 0 95% 89% PROGRESS IS SATISFACTORY PUNJABI, RAJ RESIDENT ENGINEER PROGRAM CAS145 PAGE 5 DATE 11/22/06