PROGRAM CAS145 S C H E D U L E O F E X T R A W O R K PAGE NO. 1 DATE 02/22/07 EST. NO.17 TIME 11:16 AM R.E. NAME: PUNJABI, RAJ 07-206804 --------------------------------------------------------------------------- CCO REPORT REPORT TYPE OF WORK(+) WORK BR CONTR NO. NUMBER AMOUNT PERFORMED (-) DATE WK RPT.NO C O M M E N T S --------------------------------------------------------------------------- *** THERE ARE NO EXTRA WORK PAYMENTS THIS ESTIMATE *** PROGRAM CAS145 S C H E D U L E O F D E D U C T I O N S PAGE NO. 1 DATE 02/22/07 EST. NO.17 TIME 11:16 AM R.E. NAME: PUNJABI, RAJ 07-206804 --------------------------------------------------------------------------- DEDUCTION DESCRIPTION AMOUNT EST THIS TOTAL NO. ESTIMATE ESTIMATE --------------------------------------------------------------------------- ADMINISTRATIVE LATE LN PICKUP -84,000.00 08 0.00 -84,000.00 LABOR COMPLIANCE VIOLATION JAN 06 -10,000.00 05 MARCH 06 -10,000.00 06 MARCH 06 -10,000.00 07 MARCH 06 EST 6/7 20,000.00 08 JAN 06 10,000.00 09 0.00 0.00 TOTAL DEDUCTIONS 0.00 -84,000.00 PROGRAM CAS145 PAGE 1 DATE 02/22/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-206804 TIME 11:16 AM ESTIMATE NO. 17 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/12/07 R.E. NAME: PUNJABI, RAJ DATE OF THIS ESTIMATE 02/22/07 LOCATION PROGRESS ESTIMATE AFTER ACCEPTANCE 07-LA-60-R6.9/19.4 ---------------------------------- AMERICAN CIVIL CONSTRUCTORS IN LOS ANGELES COUNTY IN VARIOUS WEST COAST, INC. LOCATIONS 3701 MALLARD DRIVE BENICIA, CA 94510 FED. AID NO. ACNH-P060(125)E GRIND CONCRETE PAVEMENT ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 01 PROGRESS SCHEDULE (CRITICAL PATH METHOD) LS 5,000.0000 5,000.00 1.000 5,000.00 02 TIME-RELATED OVERHEAD WDAY 1,000.0000 500,000.00 33.000 33,000.00 500.000 500,000.00 03 PREPARE WATER POLLUTION CONTROL LS 2,500.0000 2,500.00 1.000 2,500.00 PROGRAM 04 WATER POLLUTION CONTROL LS 75,000.0000 75,000.00 1.000 75,000.00 05 CONSTRUCTION AREA SIGNS LS 17,000.0000 17,000.00 1.000 17,000.00 S) 06 TRAFFIC CONTROL SYSTEM LS 550,000.0000 550,000.00 1.000 550,000.00 S) 07 COLD PLANE ASPHALT CONCRETE PAVEMENT M2 2.2000 63,580.00 25,765.030 56,683.07 S) 08 AGGREGATE BASE (APPROACH SLAB) M3 350.0000 17,500.00 62.500 21,875.00 09 SAND COVER TONN 300.0000 93,000.00 5.153 1,545.90 187.624 56,287.20 10 ASPHALTIC EMULSION (FOG SEAL COAT) TONN 750.0000 60,000.00 2.173 1,629.75 18.465 13,848.75 11 RUBBERIZED ASPHALT CONCRETE (TYPE G) TONN 87.0000 199,230.00 1,822.270 158,537.49 12 REPLACE CONCRETE PAVEMENT M3 1,000.0000 2,690,000.00 3,387.710 3,387,710.00 (RAPID STRENGTH CONCRETE) 13 SEAL JOINT (EXISTING CONCRETE PAVEMENT) M 3.0000 411,600.00 0.000 0.00 14 GRIND EXISTING CONCRETE M2 5.7500 3,576,500.00 628,154.036 3,611,885.71 S) PAVEMENT 15 STRUCTURAL CONCRETE, APPROACH SLAB M3 1,600.0000 656,000.00 442.300 707,680.00 (TYPE R) 16 PAVING NOTCH EXTENSION M3 8,900.0000 97,900.00 10.600 94,340.00 17 JOINT SEAL (MR 30 MM) M 160.0000 99,200.00 0.000 0.00 18 JOINT SEAL (MR 15 MM) M 150.0000 49,500.00 180.000 27,000.00 19 THERMOPLASTIC PAVEMENT MARKING M2 100.0000 400.00 3.120 312.00 S) 20 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6000 50,580.00 73,623.820 44,174.29 S) 21 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 15,380.00 6,756.320 13,512.64 S) 22 200 MM THERMOPLASTIC TRAFFIC STRIPE M 2.0000 7,760.00 4,143.920 8,287.84 S) (BROKEN 3.66 M - 0.92 M) PROGRAM CAS145 PAGE 2 DATE 02/22/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-206804 TIME 11:16 AM ESTIMATE NO. 17 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/12/07 R.E. NAME: PUNJABI, RAJ DATE OF THIS ESTIMATE 02/22/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ 23 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.5000 73,000.00 143,530.190 71,765.10 S) (BROKEN 10.98 M - 3.66 M) 24 100 MM THERMOPLASTIC TRAFFIC STRIPE M 0.6500 1,371.50 1,441.800 937.17 S) (BROKEN 5.18 M - 2.14 M) 25 PAVEMENT MARKER (NON-REFLECTIVE) EA 1.0000 39,800.00 37,343.000 37,343.00 S) 26 PAVEMENT MARKER (RETROREFLECTIVE) EA 2.4500 35,525.00 13,143.000 32,200.35 S) PROGRAM CAS145 PAGE 3 DATE 02/22/07 STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION 07-206804 TIME 11:16 AM ESTIMATE NO. 17 BID OPENING 05/26/05 P R O J E C T R E C O R D - E S T I M A T E WORK PERFORMED THROUGH 01/12/07 R.E. NAME: PUNJABI, RAJ DATE OF THIS ESTIMATE 02/22/07 ------------------------------------------------------------------------------------------------------------------------------------ ITEM CONTRACT ORIGINAL THIS ESTIMATE TOTAL ESTIMATE NO. ITEM DESCRIPTION UNIT PRICES AUTH. AMT QUANTITY $ AMOUNT QUANTITY $ AMOUNT ------------------------------------------------------------------------------------------------------------------------------------ SUBTOTAL CONTRACT ITEMS WITHOUT MOBILIZATION 36,175.65 9,493,879.61 ADJUSTMENT OF COMPENSATION 0.00 29,781.00 EXTRA WORK 0.00 124,642.79 SUBTOTAL AMOUNT EARNED WITHOUT MOBILIZATION 36,175.65 9,648,303.40 27 MOBILIZATION LS 750,000.0000 750,000.00 1.000 750,000.00 ORIGINAL CONTRACT AMOUNT 10,137,326.50 TOTAL WORK COMPLETED 36,175.65 10,398,303.40 MATERIALS ON HAND ON SITE 0.00 MATERIALS ON HAND ELSEWHERE 0.00 DEDUCTIONS 0.00 -84,000.00 TOTAL 36,175.65 10,314,303.40 ITEMS FOR WHICH CONTRACT PRICE EXCEEDS MAXIMUM VALUE N O N E DATE CONTR CONTRACT DATE WORK BEGIN JOB COM- WORKING WEATHER NON- C.C.O. OTHER PERCENT PERCENT TIME APPROVED DAYS STARTED CONSTR PLETED ON DAYS WORKING DAYS DAYS DAYS COMPLETED ELAPSED 06/17/05 500 07/05/05 00/00/00 01/12/07 477 83 0 0 100% 100% PUNJABI, RAJ RESIDENT ENGINEER PROGRAM CAS145 DATE 02/22/07